r
--
7
_ ,
,
.,
,a
.-
o
,
3
7
,.
.;.
,-
'
r
'
NAY 0 61986
Docket / License:
50-334/DPR-66
-
Duquesne Light Company
-Attn: Mr. J. J. Carey,
Vice President
Nuclear Group
,
Post Office Box 4
-Shippingport, Pennsylvania 15077
Gentlemen:
Subject:
Inspection 50-334/86-06
This refers to the routine resident safety inspection by Mr. W. Troskoski on Hard
11 - April 18, 1986, at the Beaver Valley Power Station, Unit 1, Shippingport,
The inspection consisted of document reviews, interviews and obser-
vation of activities. The findings were discussed with Mr. J. Sieber of your staff.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Not. ice of Violaticn-and Notice of Deviation, enclosed herewith as Appendix A and
Appegdix B.
The violations have been categorized by severity level in accordance
with the " General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C (1985).
You are required to respond to the enclosed
Notices, and in preparing your responses, you should follow the instructions
specified therein.
In addition, we are concerned with the circumstances surrounding violation B.
The
surveillance procedure was performed by vendor personnel in many plant fire zones
for an extended period of time.
Although your staff routinely reviews all com-
pleted surveillance tests and randomly accompanies the vendor during their conduct,
the surveillance performance weaknesses were not previously identified.
Your re-
sponse should specifically address those actions to prevent recurrence.
The responses directed by this letter and the accompanying Notice are not subject
to the clearance procedures of the Office of Nanagement and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
8605130087 860506
ADOCK 05000334
G
1
1
28/
m
. _ ,
'
' . -
1
Duquesne Light Company
2
Your cooperation is appreciated.
Sincerely,
.
.
Original Sisned 87e
Edward C. Wenzinger, Chief
Projects Branch No. 3,
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
NRC Region I Inspection Report 50-334/86-06
'
cc w/encls:
C. E. Ewing, Manager, Quality Assurance
W. S. Lacey, Plant Manager
R. J. Druga, Manager, Technical Services
R. E. Martin, Nuclear Engineering
J. D. Sieber, General Manager, Nuclear Services
T. D. Jones, General Manager, Nuclear Operations
H. M. Siegel, Manager, Nuclear Engineering Dept.
N. R. Tonet, General Manager, Nuclear Engr. , & Constr. Unit
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encls)
DRP Section Chief
M. McBride, RI, Pilgrim
L. J. Prividy, RI, BV-2
P. Tam, LPM, NRR
Of
q '.I
Rh P
R
R
g ,
,
os oski/meo
T ip
zi ger
'
4/30/86
g[
[p