- - _ _ -
\\
NTING~ CONDITIONS ruK UPERATIUN SURUFILLANCE REQUIRERENTS I
l 3.7.D (cont'd.)
- 4. 7.D (cont'd. )
i b.
At least once per quarter:
1 (1) All normally open power operated isola-tion valves (except for the main steam line power-operated isolation valves) shall be fully closed and reopened.
(2) With the reactor power less than 75%,
trip main steam isolation valves individually and verify closure time.
c.
At least once per operating cycle the operability of the reactor coolant i
system instrument line flow check i
valves shall be verified.
l l
2.
In the even*. any isolation valve 2.
Whenever an isolation valve listed in specified in Table 3.7.1 becomes Table 3.7.1 is inoperable, the position inoperable, reactor power operation of at least one other valve in each may continue provided at least one line having an inoperable valve shall valve in each line having an inop-be recorded daily, erable valve shall be in the mode corresponding to the isolated condi-tion.
3.
If Specification 3.7.D.1 and 3.7.D 2 cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the Cold Shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
8807080012 880705 PDR ADOCK 05000298 P
-167-