Text

o$

Ig TABLE 3.3.2-1 (Continued)

Da

$b

?

ISOLATION ACTUATION INSTRUMENTATION 22 2

VALVE GROUPS MINIMUM APPLICABLE

~

O$

OPERATED BY OPERABLE CHANNELS OPERATIONAL gg E

TRIP FUNCTION SIGNAL PER TRIP SYSTEM (a)

CONDITION ACTION

~

co-Qs0 2.

REACTOR WATER CLEANUP SYSTEM ISOLATION m

a.

A Flow - High 10, 11 1

1,2,3 23 b.

Heat Exchanger / Pump /High Energy Piping Area Temperature - High 10, 11 1

1,2,3 23 c.

Heat Exchanger / Pump Area Ventilation a Temp. -

High 10, 11 1

1,2,3 23 d.

SLCS Initiation 11 NA 1,2,3 23 y

e.

Reactor Vessel Low Water Level - Level 2 10,11(d) 2 1,2,3 23 Y

f-

..~n.....

1___,...__

g g - - - - ~- r - - -- -

2, t,

a o

g.

Manual Initiation 10, 11 1/ valve 1, 2, 3 26 3.

REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION a.

RCIC Steam Line Flow - High 1.

Differential Pressure 8

1 1,2,3 23 2.

Time Delay 8

1 1,2,3 23 b.

RCIC Steam Supply Pressure - Low 8, 9 2

1,2,3 23 c.

RCIC Turbine Exhaust Diaphragm P. essure - High 8

2 1,2,3 23 d.

RCIC Equipment Room Temperature - High 8

1 1,2,3 23 e.

Manual Initiation 8, 9 1/ valve 1,2,3 26 N

~

~

~

i TABLE 3.3.2-2 (Continued)

IN ISOLATION ACTUATION INSTRUMENTATION SETPOINTS EE ALLOWABLE

~~

[_

TRIP FUNCTION TRIP SETPOINT VALUE z

El 2.

REACTOR WATER CLEANUP SYSTEM ISOLATION m

a.

A Flow - High i 55.1 gpm i 63.4 gpm b.

Heat Exchanger / Pump /High Energy Piping Area Temperature - High i 175'F**

$ 1830,r**

c.

Heat Exchanger / Pump Area Ventilation a Temperature -

High

< 50*F**

< 53'F**

d.

SLCS Initiation NA NA un e.

Reactor Vessel Low Water Level -

31 Level 2

> 110.8 inches *

> 103.8 inches

[

f.

M"::X Outict Tm ycr;turc - !H gh

_ 110 F 150*r De/e tea [

g.

Manual Initiation NA NA 3.

REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION a-RCIC Steam Line Flow - High 0/90,875 !be/hr**

$ 95.0 inches H 0/

1.

Differential Pressure 1 87.0 inches H 2

2 94,865 lbs/hr 2.

Time Delay 3 secords 312 seconds b.

RCIC Steam Supply Pressure - Low

> 62 psig

> 53 psig c.

RCIC Turbine Exhaust Diaphragm Pressure - High 1 10 psig i 20 psig d.

RCIC Equipment Room Temperature - High i 150'F**

1 160'F**

e.

Manual Initiation NA NA 1

'\\

TABLE 3.3.2-3 ISOLATION ACTUATION SYSTEM INSTRUMENTATION RESPONSE TIME RESPONSE TIME (Seconds)#

TRIP FUNCTION l

1.

CONTAINMENT ISOLATION Reactor Vessel Low Water Level a.

< 13(a) 1)

Level 3 7 13(a),,

2)

Level 2 7 1.0*/< 13(a),,

3)

Level 1 13(a)~

b.

Drywell Pressure - High c.

Main Steam Line 1)

Radiation - Higb(b)

I13((a)[

< 33(a) 513*)n.

2)

Pressure - Low 3)

Flow - High d.

Main Steam Line Tunnel Temperature - High NA NA e.

Condenser Pressure - High NA f.

Turbine Bldg. Area Temperature - High g.

fuel Pool Ventilation Exhaust Radiation - High(D) 5 13(a)

NA h.

Manual Initiation 2.

REACTOR WATER CLEANUP SYSTEM ISOLATION U

NA a.

A Flow - High b.

Heat Exchanger / Pump /High Energy Piping NA Area Temperature - High

/

Heat Exchanger / Pump Area Ventilation c.

NA Temperature AT - High NA d.

SLCS Initiation

< 13(a)

Reactor Vessel Low Water Level - Level 2 e.

f.

-NRUX Oetiet Te perature lli p, N A B Isf+d NA g.

Manual Initiation I

3.

REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION

< 13(a)

RCIC Steam Line Flow - High a.

13(a) b.

RCIC Steam Supply Pressure - Low RCIC Turbine Exhaust Diaphragm Pressure - High NA c.

NA d.

RCIC Equipment Room Temperature - High NA e.

Manual Initiation FERMI - UNIT 2 3/4 3-18 i;