ML20196J932
| ML20196J932 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/10/1988 |
| From: | DETROIT EDISON CO. |
| To: | |
| Shared Package | |
| ML20196J918 | List: |
| References | |
| NUDOCS 8803150104 | |
| Download: ML20196J932 (3) | |
Text
o$
Ig TABLE 3.3.2-1 (Continued)
Da
$b
?
ISOLATION ACTUATION INSTRUMENTATION 22 2
VALVE GROUPS MINIMUM APPLICABLE
~
O$
OPERATED BY OPERABLE CHANNELS OPERATIONAL gg E
TRIP FUNCTION SIGNAL PER TRIP SYSTEM (a)
CONDITION ACTION
~
co-Qs0 2.
REACTOR WATER CLEANUP SYSTEM ISOLATION m
a.
A Flow - High 10, 11 1
1,2,3 23 b.
Heat Exchanger / Pump /High Energy Piping Area Temperature - High 10, 11 1
1,2,3 23 c.
Heat Exchanger / Pump Area Ventilation a Temp. -
High 10, 11 1
1,2,3 23 d.
SLCS Initiation 11 NA 1,2,3 23 y
e.
Reactor Vessel Low Water Level - Level 2 10,11(d) 2 1,2,3 23 Y
f-
..~n.....
1___,...__
g g - - - - ~- r - - -- -
2, t,
a o
g.
Manual Initiation 10, 11 1/ valve 1, 2, 3 26 3.
REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION a.
RCIC Steam Line Flow - High 1.
Differential Pressure 8
1 1,2,3 23 2.
Time Delay 8
1 1,2,3 23 b.
RCIC Steam Supply Pressure - Low 8, 9 2
1,2,3 23 c.
RCIC Turbine Exhaust Diaphragm P. essure - High 8
2 1,2,3 23 d.
RCIC Equipment Room Temperature - High 8
1 1,2,3 23 e.
Manual Initiation 8, 9 1/ valve 1,2,3 26 N
~
~
~
i TABLE 3.3.2-2 (Continued)
IN ISOLATION ACTUATION INSTRUMENTATION SETPOINTS EE ALLOWABLE
~~
[_
TRIP FUNCTION TRIP SETPOINT VALUE z
El 2.
REACTOR WATER CLEANUP SYSTEM ISOLATION m
a.
A Flow - High i 55.1 gpm i 63.4 gpm b.
Heat Exchanger / Pump /High Energy Piping Area Temperature - High i 175'F**
$ 1830,r**
c.
Heat Exchanger / Pump Area Ventilation a Temperature -
High
< 50*F**
< 53'F**
d.
SLCS Initiation NA NA un e.
Reactor Vessel Low Water Level -
31 Level 2
> 110.8 inches *
> 103.8 inches
[
f.
M"::X Outict Tm ycr;turc - !H gh
_ 110 F 150*r De/e tea [
g.
Manual Initiation NA NA 3.
REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION a-RCIC Steam Line Flow - High 0/90,875 !be/hr**
$ 95.0 inches H 0/
1.
Differential Pressure 1 87.0 inches H 2
2 94,865 lbs/hr 2.
Time Delay 3 secords 312 seconds b.
RCIC Steam Supply Pressure - Low
> 62 psig
> 53 psig c.
RCIC Turbine Exhaust Diaphragm Pressure - High 1 10 psig i 20 psig d.
RCIC Equipment Room Temperature - High i 150'F**
1 160'F**
e.
Manual Initiation NA NA 1
'\\
TABLE 3.3.2-3 ISOLATION ACTUATION SYSTEM INSTRUMENTATION RESPONSE TIME RESPONSE TIME (Seconds)#
TRIP FUNCTION l
1.
CONTAINMENT ISOLATION Reactor Vessel Low Water Level a.
< 13(a) 1)
Level 3 7 13(a),,
2)
Level 2 7 1.0*/< 13(a),,
3)
Level 1 13(a)~
b.
Drywell Pressure - High c.
Radiation - Higb(b)
I13((a)[
< 33(a) 513*)n.
2)
Pressure - Low 3)
Flow - High d.
Main Steam Line Tunnel Temperature - High NA NA e.
Condenser Pressure - High NA f.
Turbine Bldg. Area Temperature - High g.
fuel Pool Ventilation Exhaust Radiation - High(D) 5 13(a)
NA h.
Manual Initiation 2.
REACTOR WATER CLEANUP SYSTEM ISOLATION U
NA a.
A Flow - High b.
Heat Exchanger / Pump /High Energy Piping NA Area Temperature - High
/
Heat Exchanger / Pump Area Ventilation c.
NA Temperature AT - High NA d.
SLCS Initiation
< 13(a)
Reactor Vessel Low Water Level - Level 2 e.
f.
-NRUX Oetiet Te perature lli p, N A B Isf+d NA g.
Manual Initiation I
3.
REACTOR CORE ISOLATION COOLING SYSTEM ISOLATION
< 13(a)
RCIC Steam Line Flow - High a.
13(a) b.
RCIC Steam Supply Pressure - Low RCIC Turbine Exhaust Diaphragm Pressure - High NA c.
NA d.
RCIC Equipment Room Temperature - High NA e.
Manual Initiation FERMI - UNIT 2 3/4 3-18 i;