ML20196E106
| ML20196E106 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/25/1988 |
| From: | Decker T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20196E113 | List: |
| References | |
| NUDOCS 8812090273 | |
| Download: ML20196E106 (2) | |
See also: IR 05000324/1988037
Text
2
- - - - -
,
,
,
i*
, . , y
l
.
.
NOV.2 5 W
I
'
'
!
,
Docket Nos. 50-325, 50-324
l
i
!
"
!
farolinaPowerandLi9htCompany
t
v ATTN: Mr. E. E. Utley
Senior Executive Vice President
I
Power Supply and Engineering
4
and Construction
P. O. Box 1551
'
Raleigh, NC 27602
Gentlemen:
l
SUBJECT:
'
4
j
(NRC INSPECTION REPORT NOS. 50-325/88-37 AND 50-324/88-37)
i
,
l
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
j
l
W. Sartor on Octobe* 17-19, 1938 and October 27, 1988. The inspection included
[
]
a review of activities authorized for your Brunswick facility.
At the
conclusion of the inspection, the findings were discussed with those members of
[
your staff identified in the enclosed Inspection Report.
i
f
Areas examined during the inspection are identified in the report.
Within
4
these areas, the inspection consisted of selective examinations of procedures
.
and representative records, interviews with personnel, and observation of
]
,
activities in progress.
[
.
,
I
The inspection findings indicate that certain activities appeared to violate
i
!
NRC requirements.
The violation, references to pertinent requirements, and
!
elements to be included in your response are described in the enclosed Notice
[
j
of Violation,
l
3
I
)
In accordance with Section 2.790 of the NRC's "Rules of Practice." Part 2
)
Title 10. Code of Federal Regulations, a copy of this letter and its enclosures
j
will be placed in the NRC Public Document Room.
l
l
The responses directed by this letter and its enclosures are not subject to the
[
clearance procedures of the Office of Management and Budget as required by the
j
,
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
l
,
l
,
l
I
1
l
I
f
1
I
I
!
i
t
i
kkUO&CK73 882125
I
i
o
05000324
i
]
PNU
!
i
\\\\
- . - -
.
-
H et
_ _ - _ _ _ _
s *,*
,
Car'olina Power and Light Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Thomas R. Decker, Acting Chief
Radiological Prote: tion Branch
Division of Radiation Safety
and Safeguards
i
Enclosures:
1.
2.
NRC Inspection Report
%p w/encis:
c
. B. Starkey, Jr., Manager
d.BrunswickNuclearProject
L. Harness, Plant General Manager
'
State of North Carolina
tjc'c w/encls:
W RC Resident inspector
DRS Technical Assistant
Docum3nt Control Desk
J . D. Travers, NRR
s . Heard, FEMA RIV
i
,
l
I
l
l
@
.
-
WSartor
WRankin
PFre(rickson
,
'
11/3y/88 11/?$88 11/ 77/88
,
- -
-
-