4 TABLE 3.3.2-2 i
ISOLATION ACTilATI0ff INSTRUMfNTATION SETPOINTS Att0WABLE g TRIP FUNCIIO!I TRIP SETPOINT VAlllE M 1.
PRIMARY CONTAINHENT 150tATION a.
Low, tevel 2 1 129.8 inches
- 3 127.6 inches b.
Drywell Pressure - liigh i 1.68 psig i 1.88 psig c.
Containment and Drywell Purge Exhaust Plenum Radiation - liigh 5 2.R/hr* 4 hove background
$4mR/br'A*Tbovebackgroud
~
d.
Low, tevel 1 1 16.5 inches
- 1 14.3 inches t'
e.
Manual Initiation NA NA s.
4
';* 2.
MAIN STEAM LINE ISOLATION
>o
'd a.
1 tow, tevel 1 1 16.5 inches
- 1 14.3 inches b,
Hain Steam Line Radiation - Illgh
$ 3.0 x full power background
.< 3.6 x fu11 power liackground c.
Main Steam Line Pressure - Low 1 807.0 psig 1 795.0 psig o
d.
Main Steam Line Flow - liigh
< 191 psid
- r; etc a Q2ec
-< 183 psid o
ggga.~e.
Condenser Vacuum - Low 3 8.5 inches lig. vacuum 1 ?.6 inches lig. vacuum ooo E@@
f.
Main Steam Line Tunnel y
Temperature - liigh
< 154.4 F & ~'
i 153.9'Ff6 ou g.
Main Steam Line Tunnel Q<
a Temperature - liigh
< 103.6 F *"
i 101.4*F C T
rd h.
Turbine llullding Hain Steam Line m a.o.
- ec,pci.iture - liigh
$ 134.4 F 8' "
5 138.9"F W -
C 1.
Manual Initiation NA NA
TABLE 3.3.2-2 (Continued)
O 150tATION ACTilATION INSTRUMENTATION SETP0lNTS m
i
.c E 1 RIP TUNCTION ALLOWABLE TRIP SETPOINT VALUE f
3.
SECONDARY CONTAINMENT ISOLATION a.
l Low, level 2
> 129. 127.6 inches b.
Drywell Pressure liigh
< 1.68 psig i 1.88 psig c.
Manual Initiation NA NA-4.
REACTOR WATER CLEANUP SYSTEM ISOLATION a.
A flow - liigh
$ 68 gpm @ ^
$ 77.1 gpnf* P '
h.
A flow Timer 5 45 seconds
< 47 seconds Equipment Area Temperature - liigh c.
- 1. iRWCU lix Room
< 136.4*F
< 138.9*F w
i y 2.
Pump Rooms, Valve Nest Room j135.4F
{137.9F d.
Equipment Area A Temperature - liigh 1.
RWCU lix Room
< 76.65'F
< 78.4'F 2.
RWCU Pump Rooms, Valve Nest Room 328.65'F 330.4*F i
e.
tow, tevel 2
> 129.8 inches *
> 127.6 inches Y
f.
Main Steam Line Tunnel Ambient N{
Temperature - liigh 5 154.4*F# "
$ 158.9'F8 P i
g.
Main Steam Line Tunnel A
A Temperature - liigh
$ 103.6*FW
< 107.4*F C y
h.
SLCS Initiation NA NA j
u 1.
Manual Initiation NA NA i
I
k 4
i
'j TABIE 3.3.2-2 (Continue <!)
ISOLATION ACTilATION INSTRilHFHTATION SETPOINTS 5
ALLOWAfil E
-i TRIP FUNCTION TRIP SETPOINT val _UE 4
s S.
REACTOR CORE ISOLATION COOLING SYSTEM ISOLATIDN a.
RCIC Steam Line Flow - liigh
$ 290" I! 0 W
< 298.5" !! 0 2
2 b.
RCIC Steam Supply Pressure - Low
> 60 psig
> 55 psig i
c.
RCIC Turbine Exhaust Diaphragm i
Pressure - liigh 1 10 psID
$ 20 psig
<f.
RCIC Equipment Room Ambient Temperature - liigh
< 143.4 F
_ 145.9 F w
w e.
RCIC Equipment Room A 4
Temperature - liigh
-< 37.25*F
< 39*F f.
Main Steam Line Tunnel Ambient lemperature - liigh 5 154.4*f D 1 158.9*FD g.
Main Steam Line Tunnel A Temperature - liigh
-< 103.6*FM
< 107.4"F l
h.
Main Steam Line Tunnel Temperature Timer 5 29 minutes
< 30 minutes pa S
i.
RilR Equipment Room Ambient
'I Temperature - liigh
< 157.4*F 5 159.9'F l
l g
a a"
J.
RilR Equipment Room 1
f a Temperature - liigh
$ S0.65*F
$ S2.4*F k.
RCIC Steam flow liigh Timer 3 seconcis 5 t 5 13 seconcts 3 secon<ls 1 L 5 13 secon<!s 1.
Drywell Pressure - lii h
< 1.68 psig
$ 1.88 psig 0
m.
Manual Initiation hA NA l
TABLE 3.3.2-2 (Cnntinued)
(
ISOLATION ACTIIATION INSTRllMENTATION SETPOINTS m
E ALLOWABLE TRIP SETPOINT VALUE e
TRIP FUNCTION g
Z 6.
RIIR SYSTEM ISOLATION a.
RilR Equipment Area Ambient Temperature - liigh
$ 157.4"F
$ 159.9 F h.
RilR Equipment Area a Temperature -
liigh 5 50.65 F
$ 52.4"F 1 444" II b RilR/RCIC Steam Line Flow - liigh 5 4 0 6 " If 2
2 c.
d.
Reactor Vessel Water Level - Low, Level 3 3 177.7 inches
- 1 177.1 inches w
Reactor Vessel (RilR Cut-in 1
e.
Permissive) Pressure - fligh 5 135 psig 5 150 psig w
v's f.
Drywell Pressure - liigh 5 1.68 psig 5 1.88 psig g.
Manual Initiation NA NA
- See Bases Figure B 3/4 3-1.
-** Initial ~setpoint:--Final-setpoint-to-be-determined-during-startup-test program.-Any required change-
-to-this-setpoint--shall-be submitted'to the-Commission 71 thin 90- days of-test-complation._
-