Similar Documents at Perry |
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20212C0761999-09-15015 September 1999 Notification of 990930 Meeting with Firstenergy Nuclear Operating Co in Rockville,Md to Discuss Licensee Recent Submittal Requesting Five Percent Power Uprate ML20212J3201999-06-23023 June 1999 Forwards Proposed Change to STSs for Review & Comment.Change Would Remove TS Requirements for ESF Features to Be Operable After Sufficient Radioactive Decay Has Occurred to Ensure Off Site Doses Remain Below SRP Limits DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205P6271999-04-14014 April 1999 Notification of 990428 Meeting with Util to Discuss Proposed Asset Transfer Between Duquesne Light Co & First Energy Nuclear Operating Co & Associated License Transfer of Beaver Valley Power Station Per 10CFR50.80 ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20198R8831999-01-0707 January 1999 Forwards SER Accepting Licensee 971015 Request to Amend Perry Nuclear Power Plant TSs 5.2.2.e to Remove Reference to GL 82-12 & Require Administrative Controls Be Established Which Will Ensure Adequate Shift Coverage ML20196D9451998-11-30030 November 1998 Notification of 981204 Meeting with Centerior Svc Co in Rockville,Md to Discuss Proposed Revs to Licensing Basis for Feedwater Containment Isolation Valves ML20195B8551998-11-0909 November 1998 Notification of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Revisions to Licensing Basis for Feedwater Containment Isolation Valves ML20238F8661998-09-0101 September 1998 Forwards Licensee Revs to Svc List for Placing in PDR ML20238F3341998-08-31031 August 1998 Notification of 980915 Meeting W/Centerior Service Co in Rockville,Md to Discuss Licensing Submittal Based Upon Revised Accident Source Term That Deletes MSIV Leakage Control Sys & Relaxes MSIV Leakage Limits ML20238F1861998-08-28028 August 1998 Notification of 980910 Meeting W/Centerior Service Co in Rockville,Md to Discuss Proposed Revs to Licensing Basis for Feedwater Containment Isolation Valves ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20248F4571998-06-0202 June 1998 Notification of 980625 Meeting W/Util in Rockville,Md to Discuss Analytical Testing Bases for Mark III ECCS Suction Strainer ML20216D8551998-04-14014 April 1998 Forwards Signed Original of Order Imposing Civil Monetary Penalty.Addl 5 Copies & Disk Encl,For Use.W/O Encl ML20217B8441998-03-0606 March 1998 Notification of Cancellation of 980331 Meeting in Rockville, MD to Discuss Proposed Testing Program for ECCS Suction Strainer ML20197B7831998-03-0606 March 1998 Notification of 980331 Meeting W/Ceic in Rockville,Md to Discuss Proposed Testing Program for ECCS Suction Strainer. (Proprietary Info Will Be Discussed) ML20199A3291997-11-13013 November 1997 Forwards NRC Operator Licensing Exam Rept 50-440/97-309OL on 970825-30 w/as-given Written Exam ML20199A3071997-11-13013 November 1997 Forwards NRC Operator Licensing Exam Rept (Included Completed & Graded Tests) for Tests Administered During Wk of 970825 ML20138D8451997-04-29029 April 1997 Notification of 970508 Meeting W/Clei in Rockville,Md to Discuss Priorities & Schedules of Licensing Issues for Plant ML20147J2271997-04-10010 April 1997 Forwards for Transmittal Notice of Proposed Merger for Perry Nuclear Power Plant,Unit 1 ML20136F9741997-03-13013 March 1997 Notification of 970324 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md to Discuss Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept & to Discuss Acoustic Methodology Applied to Upper Lift Load ML20135E4781997-03-0505 March 1997 Notification of 970306 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md to Review Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept.Meeting Cancelled ML20134Q1271997-02-25025 February 1997 Notification of 970306 Meeting W/Util in Rockville,Md to Review Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept & to Discuss Acoustic Methodology Applied to Upper Lift Load Reduction ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134P9011996-11-26026 November 1996 Notification of 961204 Meeting W/Clei & Teco in Rockville,Md to Discuss Potential Submittals Concerning Proposed Merger of Centerior Energy Co & Oec ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20149E8161994-08-0202 August 1994 Forwards Fr Notice of License Amend Requests Proposed Merger of Toledo Edison Co & Cleveland Electric Illumianting Co Antitrust Determination NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059E5031994-01-0606 January 1994 Forwards Results of on-site EQ Review of Related Info at Plant in Support of Staff Task Action to Identify & Address Existing EQ Issues & Concerns.Encl 1 Provides Results of Staff Review.Encl 2 Provides Draft Ltr to Transmit Info ML20058N4811993-12-15015 December 1993 Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately ML20058M0351993-12-13013 December 1993 Notification of 931214 Meeting W/Licensee in Rockville,Md to Discuss Plant Fuel Failure Root Cause Analysis ML20057G3001993-10-15015 October 1993 Notification of 931028 Meeting W/Util in Rockville,Md to Discuss Plant Course of Action Plan to Improve Performance of Plant Over Next Several Yrs ML20057D5251993-09-0101 September 1993 Forwards 2.206 Petition Submitted by Capella,Wene & O'Connell Re Poor Performance of Plant.W/O Encl ML20056G0181993-08-26026 August 1993 Notification of 930902 Meeting W/Util in Rockville,Md to Discuss Facility IST ML20056E7141993-08-19019 August 1993 Notification of 930831 Meeting w/BWR-6 Owners Group in Rockville,Md to Discuss Pending Amend Submittals to Adopt Improved Standardized TS ML20062C2851990-10-18018 October 1990 Forwards Stipulation of Agreed Facts Between Licensee,Nrc Staff & Ohio Citizens for Responsible Energy, Signed by Three Parties.Original Stipulation Returned to Silberg. W/O Encl ML20059M0271990-09-17017 September 1990 Forwards Amend to Facility License,Removing cycle-specific Parameters from Tech Specs.W/O Encl ML20059H2091990-09-0505 September 1990 Provides Recipients & Hiatt W/Util Proposed Amend to Delete Values of cycle-specific Parameters of Each Core from Tech Specs ML20056A3641990-07-24024 July 1990 Requests Addition of Listed Name to Svc List for Plant Proceeding.W/Certificate of Svc.Served on 900726 ML20248D1391989-09-25025 September 1989 Forwards AEOD/T915, Ground Fault Detection & Trip Circuit at Perry Unit 1, Technical Review Rept.No Further AEOD Action Recommended,Based on Merits of Alarm Scheme for Resolution of Issue ML20248B5631989-06-0606 June 1989 Forwards,For Info,Aeod Diagnostic Evaluation Team Rept for Plant.Evaluation Initiated Following Discussions Held During Senior Managers Meeting in Dec 1988 ML20247E5711989-05-22022 May 1989 Notification of 890531 Meeting W/Util in Rockville,Md to Discuss Monthly Performance Rept ML20246L2701989-05-0909 May 1989 Forwards SALP Inputs for SALP 9 Rept,Including Info Obtained During Exams Reported in Exam Repts 50-440/OL-88-01 & 50-440/OL-88-02.Deficiencies Noted Re Failure to Provide Training on Auxiliary & Emergency Sys ML20246A2771989-05-0303 May 1989 Forwards SALP Input for May 1988 - May 1989,in Accordance W/ 890401 Memo ML20236E3261989-03-20020 March 1989 Forwards Assessment & Tech Spec Clarification Re 881212 Loss of 5-volt Dc Power Supply & Loss of Rod Display & Operator Control Modules.Restoration of Normal Rod Position Indication,Rather than rod-by-rod Indication,Proper ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20206C6041988-11-0808 November 1988 Discusses Review of 870227 Significant Precursor Event Re Two Inoperable Diesel Generators,Per R Dudley 881013 Note. Util Corrective Actions Appear Thorough & Comprehensive ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20155J3931988-10-20020 October 1988 Notification of 881102 Meeting W/Util in Rockville,Md to Discuss Unit 1 Operating Performance.Proposed Agenda Encl 1999-09-15
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212C0761999-09-15015 September 1999 Notification of 990930 Meeting with Firstenergy Nuclear Operating Co in Rockville,Md to Discuss Licensee Recent Submittal Requesting Five Percent Power Uprate ML20212J3201999-06-23023 June 1999 Forwards Proposed Change to STSs for Review & Comment.Change Would Remove TS Requirements for ESF Features to Be Operable After Sufficient Radioactive Decay Has Occurred to Ensure Off Site Doses Remain Below SRP Limits DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205P6271999-04-14014 April 1999 Notification of 990428 Meeting with Util to Discuss Proposed Asset Transfer Between Duquesne Light Co & First Energy Nuclear Operating Co & Associated License Transfer of Beaver Valley Power Station Per 10CFR50.80 ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20198R8831999-01-0707 January 1999 Forwards SER Accepting Licensee 971015 Request to Amend Perry Nuclear Power Plant TSs 5.2.2.e to Remove Reference to GL 82-12 & Require Administrative Controls Be Established Which Will Ensure Adequate Shift Coverage ML20196D9451998-11-30030 November 1998 Notification of 981204 Meeting with Centerior Svc Co in Rockville,Md to Discuss Proposed Revs to Licensing Basis for Feedwater Containment Isolation Valves ML20195B8551998-11-0909 November 1998 Notification of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Revisions to Licensing Basis for Feedwater Containment Isolation Valves ML20238F8661998-09-0101 September 1998 Forwards Licensee Revs to Svc List for Placing in PDR ML20238F3341998-08-31031 August 1998 Notification of 980915 Meeting W/Centerior Service Co in Rockville,Md to Discuss Licensing Submittal Based Upon Revised Accident Source Term That Deletes MSIV Leakage Control Sys & Relaxes MSIV Leakage Limits ML20238F1861998-08-28028 August 1998 Notification of 980910 Meeting W/Centerior Service Co in Rockville,Md to Discuss Proposed Revs to Licensing Basis for Feedwater Containment Isolation Valves ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20248F4571998-06-0202 June 1998 Notification of 980625 Meeting W/Util in Rockville,Md to Discuss Analytical Testing Bases for Mark III ECCS Suction Strainer ML20216D8551998-04-14014 April 1998 Forwards Signed Original of Order Imposing Civil Monetary Penalty.Addl 5 Copies & Disk Encl,For Use.W/O Encl ML20217B8441998-03-0606 March 1998 Notification of Cancellation of 980331 Meeting in Rockville, MD to Discuss Proposed Testing Program for ECCS Suction Strainer ML20197B7831998-03-0606 March 1998 Notification of 980331 Meeting W/Ceic in Rockville,Md to Discuss Proposed Testing Program for ECCS Suction Strainer. (Proprietary Info Will Be Discussed) ML20199A3071997-11-13013 November 1997 Forwards NRC Operator Licensing Exam Rept (Included Completed & Graded Tests) for Tests Administered During Wk of 970825 ML20199A3291997-11-13013 November 1997 Forwards NRC Operator Licensing Exam Rept 50-440/97-309OL on 970825-30 w/as-given Written Exam ML20138D8451997-04-29029 April 1997 Notification of 970508 Meeting W/Clei in Rockville,Md to Discuss Priorities & Schedules of Licensing Issues for Plant ML20147J2271997-04-10010 April 1997 Forwards for Transmittal Notice of Proposed Merger for Perry Nuclear Power Plant,Unit 1 ML20136F9741997-03-13013 March 1997 Notification of 970324 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md to Discuss Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept & to Discuss Acoustic Methodology Applied to Upper Lift Load ML20135E4781997-03-0505 March 1997 Notification of 970306 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md to Review Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept.Meeting Cancelled ML20134Q1271997-02-25025 February 1997 Notification of 970306 Meeting W/Util in Rockville,Md to Review Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept & to Discuss Acoustic Methodology Applied to Upper Lift Load Reduction ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134P9011996-11-26026 November 1996 Notification of 961204 Meeting W/Clei & Teco in Rockville,Md to Discuss Potential Submittals Concerning Proposed Merger of Centerior Energy Co & Oec ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20149E8161994-08-0202 August 1994 Forwards Fr Notice of License Amend Requests Proposed Merger of Toledo Edison Co & Cleveland Electric Illumianting Co Antitrust Determination NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059E5031994-01-0606 January 1994 Forwards Results of on-site EQ Review of Related Info at Plant in Support of Staff Task Action to Identify & Address Existing EQ Issues & Concerns.Encl 1 Provides Results of Staff Review.Encl 2 Provides Draft Ltr to Transmit Info ML20058N4811993-12-15015 December 1993 Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately ML20058M0351993-12-13013 December 1993 Notification of 931214 Meeting W/Licensee in Rockville,Md to Discuss Plant Fuel Failure Root Cause Analysis ML20057G3001993-10-15015 October 1993 Notification of 931028 Meeting W/Util in Rockville,Md to Discuss Plant Course of Action Plan to Improve Performance of Plant Over Next Several Yrs ML20057D5251993-09-0101 September 1993 Forwards 2.206 Petition Submitted by Capella,Wene & O'Connell Re Poor Performance of Plant.W/O Encl ML20056G0181993-08-26026 August 1993 Notification of 930902 Meeting W/Util in Rockville,Md to Discuss Facility IST ML20056E7141993-08-19019 August 1993 Notification of 930831 Meeting w/BWR-6 Owners Group in Rockville,Md to Discuss Pending Amend Submittals to Adopt Improved Standardized TS ML20062C2851990-10-18018 October 1990 Forwards Stipulation of Agreed Facts Between Licensee,Nrc Staff & Ohio Citizens for Responsible Energy, Signed by Three Parties.Original Stipulation Returned to Silberg. W/O Encl ML20059M0271990-09-17017 September 1990 Forwards Amend to Facility License,Removing cycle-specific Parameters from Tech Specs.W/O Encl ML20059H2091990-09-0505 September 1990 Provides Recipients & Hiatt W/Util Proposed Amend to Delete Values of cycle-specific Parameters of Each Core from Tech Specs ML20056A3641990-07-24024 July 1990 Requests Addition of Listed Name to Svc List for Plant Proceeding.W/Certificate of Svc.Served on 900726 ML20248D1391989-09-25025 September 1989 Forwards AEOD/T915, Ground Fault Detection & Trip Circuit at Perry Unit 1, Technical Review Rept.No Further AEOD Action Recommended,Based on Merits of Alarm Scheme for Resolution of Issue ML20248B5631989-06-0606 June 1989 Forwards,For Info,Aeod Diagnostic Evaluation Team Rept for Plant.Evaluation Initiated Following Discussions Held During Senior Managers Meeting in Dec 1988 ML20247E5711989-05-22022 May 1989 Notification of 890531 Meeting W/Util in Rockville,Md to Discuss Monthly Performance Rept ML20246L2701989-05-0909 May 1989 Forwards SALP Inputs for SALP 9 Rept,Including Info Obtained During Exams Reported in Exam Repts 50-440/OL-88-01 & 50-440/OL-88-02.Deficiencies Noted Re Failure to Provide Training on Auxiliary & Emergency Sys ML20246A2771989-05-0303 May 1989 Forwards SALP Input for May 1988 - May 1989,in Accordance W/ 890401 Memo ML20236E3261989-03-20020 March 1989 Forwards Assessment & Tech Spec Clarification Re 881212 Loss of 5-volt Dc Power Supply & Loss of Rod Display & Operator Control Modules.Restoration of Normal Rod Position Indication,Rather than rod-by-rod Indication,Proper ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20206C6041988-11-0808 November 1988 Discusses Review of 870227 Significant Precursor Event Re Two Inoperable Diesel Generators,Per R Dudley 881013 Note. Util Corrective Actions Appear Thorough & Comprehensive ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20155J3931988-10-20020 October 1988 Notification of 881102 Meeting W/Util in Rockville,Md to Discuss Unit 1 Operating Performance.Proposed Agenda Encl 1999-09-15
[Table view] |
Text
_____________________
t s cuee n C> - --- O
", y
'g NUCLEAR REGULATORY COMMisslON geoion iii Attachment #2 I* if 799 ROOSEVELT ROAD g OLEN ELLYN, GLLINOIS 60137
+....
DEC 0 21987 MEMORANDUM FOR: R. D. Lanksbury, Team Leader, Perry Augmented Inspection Team (AIT)
FROM: Hubert J. Miller, Director, Division of Reactor Safety
SUBJECT:
AIT CHARTER Enclosed for your implementation is the Charter developed for the inspection of the events associated with the Perry MSIV failure which occured on November 29, 1987. This Charter was prepared in accordance with the NRC Incident Investigation Manual and the draft AIT implementing procedure issued for use on October 2,1987, and is based on the discussions you had with Region III personnel on November 30, 1987. As stated, the objectives of the AIT are to communicate the facts surrounding this event to regional and headquarters management, to identify and communicate any generic safety concerns related to this event to regional and headquarters management, and to document the findings and conclusions of the onsite inspection.
If you have any questions regarding these objectives or the enclosed Charter, please do not hesitate to contact either myself or Monte Phillips of my staff.
I ~
Hu t J. Miller, Director Div1sion of Reactor Safety
Enclosure:
AIT Charter cc w/ enclosure:
A. B. Davis, RIII C. J. Paperiello, RIII F. J. Miraglia, NRR J. C. Partl'ow, NRR C. E. Rossi, NRR G. Holahan, NRR
. W. D. Lanning, NRR M. J. Virgilio, NRR R. W. Cooper, ED0 K. A. Connaughton, SRI 0
fgk2]gOK G
J
m.
O O PERRY MSIV STROKE TIME FAILURE AUGMENTED INSPECTION TEAM (AIT) CHARTER INVESTIGATE:
- 1. Failure of MSIVs to close/close within Technical _ Specification limits.
- 2. RootCause(s).
- 3. Interaction of prior maintenance / replacement activities to the event.
- 4. Broader implications, e.g., other systems, other valve / components.
- 5. Event reporting.
- 6. Conclusions.
QUESTIONS FOR PERRY AIT
- 1. Failure of MSIVs to close/close within Technical Specification limits.
(11/29/87) 1.1 What was the sequence of events?
1.2 What were the closure times generated during the surveillance?
1.3 What operator actions were taken during the event? Were they appropriate?
- 2. RootCause(s) 2.1 What was the root cause of the event? I l
- 3. Interaction of prior maintenance / replacement activities to the event.
3.1 What is the material condition of the affected valves and inter-connected air systems as it would affect the valve closure function?
3.2 What is the affect of the Asco valve refurbishment / replacement on the '
valve failure? l
- 4. Broader implications, e.g., other systems, other valve / components.
4.1 Is a IEIN or IEB warranted as a result of this event?
4.2 Are there other valves or instruments that require investigation?
i
J O O y
- 5. Event reporting.
5.1 Was the event reported as required?
- 6. Conclusions. ,
i 6.1 What corrective actions are porposed, and are they adequate? '
6.2 Examine generic implications to other plants and advise NRC management subsequent to the site inspection.
6.3 Document inspection findings in accordance with draft manual chapter 0325.
1 I
i l
e 1
1 I
i i
)
l
1 '. *
\
l
\
( g/ .
ll '
(a 1 .
)
9 2 C: e ACTUATOR SUPPORT AND SP E ED CONTROL V ALVE m e HE LICAL SPRINGS e h
- i k
) \
I }
E '
C } -
5 <T 5
? SPRING SEAT MEMBER l d h STEM PACKING 1 LE AK OFF CONNECTION
{
! BONNET BOLTS s -
l' I nye f -
BONNET LANTERN RING CLEARANCE f% JQ~
h _$
. g=g .
N PILOT SPRING PILOT % - BODY l PEPPET (PLUG, MAIN DISK)
E MAIN VALVE SE AT
% PILOT SE AT 1
j FLOW I
G PERRY NUCLEAR POWER PLANT THE CLEVELAND ELECTRIC I
ILLUMIN ATING COMPANY l
Main Steam Isolation Valve l Figure 5.4-8
l . .et-, - - -
)As m .
i
@ intw. ausert twt.a.e . set ersenns ==s * '
I
" ona u m es w win.co e cm woesasca. ATTACHMENT (4 i
] @ egt twat =am,posest twt.a.e >=ulrt casamen een (sitacrest towTect we64)wes et C Awoessas ca. 1 e
@ go te.=,,me,13 Twi,ue mot opgestgn avs was we t a woecaw ct
' @ [* twin went.3Jhe. ten n% cnesttg vaom(utae \
motu w en. w ws e,w m =. wtoico usan
@ {# Twit w.mAwoo creamita mut (tuecista met Ctarvaa, ww)wr. ev W1maart, sprick to (Atcet i
@ IV tettiums uncunaven nos amerug won (passar. ;
wsta cameo sees es weataan.cA
@ l' rnu cancenterta new cartes mA(tetans
%rttt (metes) weg av wentive4 ten g* arma a yes (gt CDnenMMT% r9e TWRi&Al. (1PhW%Whd ort 4 on )ne% et teateratcoreanAtinu ,
{' .a.am
=m nectvnwr. ms (cou namisTwtwv ei tussata
@ tMtx Ett (rurunesta ti tmetag)
I.
~ t
@ me stoest.t tiens trurwn=t2 et entes)
]
,",,,",,N gN[ Q-E ad evtace = wt sme et t a tA M
t.9,,j;25mm cum 4 %stTot C1 A*WDR %=fTQ8 G 8 (h ~
TO ttMt mW -OPua guarttieg tt aan () 3 3 3~
in isteter veta c.ctin natt Mu tt ,
i- '.C 1m,. -. mm- ,.m,,(grt10m C14e4 o ,,C1- OAMin) - {@ %
mig US b h.am$
.cm .- - m /
g_ a u (basment toeCnnswr.tturwas E sests um.rtm)
{
l utstrue cowrncA ttlitk?%.6o ut, AL teou mw--'..*.... . ,1 yc vs jv _
( l l E ~
u-, x _ --
ist em.ts.6ona AA ..--
e 1
<-R, t
y y y
w v 9
! inuu unctusy suceme tenute ~~ t m E l
, s 44104tn.eso ig, n.L . . . . . .. . f lg l tu3hsf. W e
l unaarteu 19 tuCTur)un Cammert fraam PTuge ,
g l 8
- og #2 W t A( 3 f ala,(.s F pga wimmstvg m gurtugg . rmedAO w fa 4Cf & 5 DuurTut) rWhetsth 9' etW9%I 8 i a _, = _ _ _. . , . . y i ,
meessnemtemptanttsoen 13$M-Q *ti [
Ev1
i
\
's .
ATTACHMENT #3
T -.
30Lwc/o "A "
gik !
ll i f ,
ti ..'
- f. I
/
{
ud in g y
j .
. : .'9, q
MJV # 44 o-ews. - i,-
)i h
pf v
,slp. -[ o J %{l%
[ A h o-afus
~
b / ptw3nd Awau)
' Nggl, ~M /./
- r l c <
'h
, , i ,,
f C ' I l 3 ~ Stivers of l l; gl Cc- 4 o-ri.3
- 'l I
, f he-e.
I J s ; /
- \ \ / :
..... .... . y .. ._ , m
};l [Q jK .Sotwoio '8 " \
.._ $ k II
~
k'f (,cre a w at$
[l e n N. IE j
- _ _ o 1 i I
i m), i
._ij_ __
gg T -f I l
Sheet 1 of 2 1
" l
- _ i
' ~ ,j j __ e g
n -L I
ljj '
ri r-- -
1 R fa i. 2 -- ,
e ri b ! !r i g . . . ;
1 4
k' i !
E
's l
$ Q ;
g s
x 3
[~ s o ;
a t< ,} 4 l 3 $
a a :1 a 3 N cc.7m%,jj ,
c o w
k- :;.
A*
f[r no ,
7t0D 3 c I
T t
~ - - ~. f g u g 5 a s -
O y%
s f g
- t s
i N
o a h
o I s a k
A t<,f& :
f a 3
- E e Dk 0 1
I 3
= N 'A \ ! c Q w l 7
--?.E e ,
w g
~
1!OD ' h Y, e um z c y/ -
t 5 7 r
=
o 6
... ~ -. .... ..
bh ee* H Sheet 2 of 2
r lo~ i , %
Attachment #6 SAMPLE DATE/ TIME DESCRIPTION ANALYSIS MSIV-1 11/6/87:1115 B21-F028B Deposits from 1 5/8" air hose. IR MSIV-2 11/6/87:1545 B21-F028B exhaust port (unknown fluid) IR MS 3 11/6/87:1115 Fitting from B21-F028B v/foreig.1 mat'l IR inside (black solids and oily fluid)
MSIV-4 11/6/87:2101 B21-F022D: = 0.1.ft.3 solenoid supply- PSC collected on 0.45u filter paper.
MSIV-5 11/6/87:2108 B21-F022D: = 0.1 ft.3 solenoid supply PSC collected on 0.459 filter paper.
MSIV-6 11/6/87:2125 B21-F022D: = 0.1 ft.3 actuator supply PSC collected on 0.45u' filter paper.
MSIV-7 11/6/87:2135 B21-F022D: = 0.1 ft.3 actuator supply PSC collected on 0.45p filter paper.
MSIV-8 11/7/87:0800 Rectorseal te Thread sealant sample. IR ta HSIV-9 11/7/87:0800 Neverseeze Thread lubricant sample IR 4
H3IV-10 11/7/87:0730 P52-F556: Instr. air at Containment GC penetration (outside). 10 min, blow-dovn, 5 min. purge of sampler.
O MSIV-11 11/7/87:0745 P52-F556: Instr. air at Containment GC penetration (outside). 10 min. blow-dovn, 15 min. purge of sampler.
MSIV-12 11/7/87:1151 B21-F028B: Solenoid supply, =0.lf t. PSC on 0.45p particulate filter.
MS1V-13 11/7/87:1202 B21-F028B: Solenoid supply, =0.lft.3 PSC on 0.45p particulate filter.
MSIV-14 11/7/87:1214 B21-F028B: Actuator supply, =0.lft.3 PSC on 0.459 particulate filter.
! HSIV-15 11/7/87:1220 B21-F028B: Actuator supply, =0.lf t.3 PSC on 0.45p particulate filter.
MSIV-16 11/7/87:1503 B21-F028B: Solenoid supply, =0.lf t.3 PSC on 0.45p particulate filter. I l
t l
i
~ s co ,
SAMPLE DATE/ TIME DESCRIPTION ANALYSIS MSIV-17 11/7/87:1521 B21-F028B: Solenoid supply, =0.5ft.3 PSC on 0.45u particulate filter.
MSIV-18 11/7/87:1537 B21-F028B: Actuator supply, =0.lft.3 PSC on 0.459 particulate filter.
MSIV-19 11/7/87:1553 B21-F028B: Actuator supply, =0.5ft.3 PSC i on 0.45p particulate filter.
MSIV-20 11/16/87:1600 B21-F028D: Solenoid valve body.
MSIV-21 11/16/87:1600 Solenoid Rebuild Kits (3 kits v/ elastomer ,
parts)
MSIV-22 11/16/87:1600 B21-F028A: Gaskets, disc, core assembly.
MSIV-23 11/16/87:1600 B21-F022B: Gaskets, disc, core assembly.
4 MSIV-24 11/16/87:1600 B21-F028B: Gaskets, disc, core assembly. !
MSIV-25 11/16/87:1600 B21-F022C: Gaskets, disc, core assembly.
~
MSIV-26 11/16/87:1600 B21-F028C: Gaskets, disc, core assembly.
MSIV-27 11/16/87:1600 B21-F022D: Gaskets, disc, core assembly.
MSIV-28 11/16/87:1600 B21-F028D: Gaskets, disc, core assembly.
HSIV-29 11/30/87:1230 B21-F022B: Plungers, solenoid "B" i
MSIV-30 11/30/87:1230 B21-F022B Core Assembly, seats & gaskets.
a i j MSIV-31 11/30/87:1230 B21-F022B: Valve body. l HSIV-32 11/30/87:1230 B21-F022B: Foreign Material from Plunger area "B" solenoid (3 particles total)
MSIV-33 11/30/87:2200 B21-F022B Instrument Air grab sample from 2" supply.
I MSIV-34 11/30/87:2215 B21-F022B: Instrument Air grab sample from Solenoid supply line.
MSIV-35 12/03/87:1230 B21-F022B: 0-ring removed from "A" solenoid side of shuttle valve.
MSIV-36 12/03/87:1230 B21-F022B: Valve body gasket.
4 MSIV-37 12/03/87:1230 B21-F022B Adapte nut and 0-ring.
MSIV-38 12/03/87:1230 B21-F022B: "A" solenoid plug nut 0-ring.
r Attachment #7
. =
1 0
l
..u
. . ,. .m: , , .
,..as
,; 1
- 7., . y
+ ll l ?, ..
( ,;4'c- ; '. ,s ,<".
t, ' j t
,s y-
', "M4
(, ,jc #'.\
_ , - g=."..
" ~n;, ; .f. ;,
c
- .- y y 'i t i-h ., E+s '*;: M'e
- u cW, s
% : s. vs . : -;
% . <rg. ~-
.m*s.%.p 34
.-~;, -* ( .
p
+n s *._.~
es ,e ,.t.,L s ,
Q y <* 1 ,
f,,.. , .. .
- :..= .. .,.
.. a...- .
. w '
y
- . .gs.,. 054 ;
y e > + . < ta t- ,,
ww s (, .s 5-,;ir,. ',w ca.-
.- ., ,', z + ??
i s , .. c... , , = m ~ '
e,y %. ' %y;.; ; .
.g.. t ,l-r . 7 , w# . ,
MSIV 32 ,
9.8X 1mm = 102 pm Particles 1, 2& 3 Figure 1. MSIV 32 Optical Microscopy I
i f
1 i ,
J 4
I i
I I
l t
l t
Attachment #8 l
- .i
. 1 i 1
> - ~ - ~
N&
j 4
2
- ii-;
.r j "[ .
I t g;.,..
- , i i -f:
1 :-
i a. 9.8X 1mm = 102 pm l
1 I
i
' l l i
,i j
1 1 4
l l
l l
l I
I 1
1 I i i I
1
- b. 25.8X 1mm = 39 pm Figure 4. MSIV 23 0-ring Optical Microscopy l
l.
I
---.-.,n_- , -- - - -,- - . - . - ,_,-a,-nn,_ _ - _ _ . - - . _ , - -emr,_-_ -, , . - a**vma - -
paa% UNITE 3 STATES ,!
. g NUCLEAR REGULATORY CIMMissCN O
.a "j
$ RE7 TON lli j
, tes moostvatt noAo f
$ eLEN ELLYN, ILLINol5 60lH
....+
DEC a1937 Dodet No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating .
Company ATTN: Mr. Murray R. Edelman Vice President Nuclear Group l Post Office Box 5000 l Cleveland, OH 44101 Gentlemen:
SUBJECT:
CONFIRMATORY ACTION LETTER NO. CAL-RIII-87-24 On November 29, 1987, a Main Steam Isolation Valve (MSIV) failed to close. This is the same type of event which occurred on October 29 and November 3, 1987, for which Confirmatory Action Letter No. CAL-RIII-87-19 was issued. As a result of the most recent event, an Augmented Inspection Team (AIT) was dispatched to the l site and a Confirmatory Action Letter (CAL-RIII-87-24) was issued on November 30, ,
1987, to document our understanding that you would perform the following actions pursuant to the review of the MSIV failure: '
i l 1. Take those actions necessary to ensure that complete documentary evidence of the "as found" condition of equipment being inspected is maintained.
- 2. Provide a step by step troubleshooting program to establish the root cause of the MSIV failure.
l l 3. Not disturb any components that offer a potential for being the root l cause including power sources, switches, solenoids, and the air system
! directly feeding the MSIVs until that action is approved by the leader of l the NRC AIT which has responsibility for examining this matter. We l
recognize that, per our authorization of November 29, 1987, the air pack was removed from MSIY IB21-F022B and the associated ASCO dual solenoid 3-way pilot valve was disassembled with the NRC AIT Team Leader present.
- 4. Except as dictated by plant safety, advise the NRC AIT Team Leader prior to conducting any troubleshooting activities. Such notification should be provided soon enough to allow time for the Team Leader to assign an I
inspector to observe activities.
- 5. Submit to NRC Region III a fomal report of your findings and conclusions I within 30 days of receipt of the November 30, 1987, Confirmatory Action I Letter. You may extend the submittal date of the fomal report requesteo in the NRC Confimatory Action Letter dated November 4,1987, to within l 30 days of the receipt of the November 30, 1987, Confimatory Action l Letter. I l
Q
DEC e 3987 The Cleveland Electric Illuminating 2 Company ;
The November 30, 1987, Confinnatory Action Letter also specified that the -
plant would not be restarted without the concurrence of the Regional Administrator or his designee.
With respect to Items 1 through 4, you have completed all of the specified actions and these have been evaluated by the AIT. Their report will be issued shortly. With regard to Item 5, we understand you will submit to Region III a formal report as specified.
Based on a review of your corrective actions and commitments as specified in '
your letters dated December 4,1987 (PY-CEI/01E-0296L), and November 13, 1987 (PY-CEI/0!E-0289L), and based on the results of our AIT inspection, we believe you have established adequate plans for continued safe operation of the plant and for final resolution of this matter. Based on these reviews and conclusions, NRC concurrence was given in a telephone conversation between H. Miller and A. Kaplan on December 4, 1987 to restart the Perry Plant. This letter confirms that conversation.
Sincerely, I he w A. Bert Davis Regional Administrator See Attached Distribution n
1 4
. .: s DEC 81987 The Cleveland Electric Illuminating 3 Company I
l l
cc: F. R. Stead, Manager, Perry Plant Technical Department i
M. D. Lyster, Manager, Perry Plant i Operations Department Ms. E. M. Buzzelli, General l Supervising Engineer, Licensing and Compliance Section DCD/DCB(RIOS)
Licensing Fee Management Branch Resident Inspector, RIII l Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.
James W. Harris, State of Ohio Robert M. Quillin, Ohio Department of Health State of Ohio, Public Utilities Commission l R. Cooper, E00 ,
W. Lanning, NRR l F. Miraglia, NRR l G. Holahan, NRR M. Virgilio, NRR J. Partlow, NRR J. Strasma, RIII l i
! 1
! l i l i
l I
I 4
i
. - .