ML20196D289

From kanterella
Jump to navigation Jump to search
Forwards,For Implementation,Charter Developed for Insp of Events Associated W/Facility 871129 MSIV Failure.Charter Prepared in Accordance W/Nrc Incident Investigation Manual & Draft Augmented Insp Team Implementing Procedure
ML20196D289
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/02/1987
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20196D050 List:
References
NUDOCS 8802170068
Download: ML20196D289 (11)


Text

_____________________

t s cuee n C> - --- O

", y

'g NUCLEAR REGULATORY COMMisslON geoion iii Attachment #2 I* if 799 ROOSEVELT ROAD g OLEN ELLYN, GLLINOIS 60137

+....

DEC 0 21987 MEMORANDUM FOR: R. D. Lanksbury, Team Leader, Perry Augmented Inspection Team (AIT)

FROM: Hubert J. Miller, Director, Division of Reactor Safety

SUBJECT:

AIT CHARTER Enclosed for your implementation is the Charter developed for the inspection of the events associated with the Perry MSIV failure which occured on November 29, 1987. This Charter was prepared in accordance with the NRC Incident Investigation Manual and the draft AIT implementing procedure issued for use on October 2,1987, and is based on the discussions you had with Region III personnel on November 30, 1987. As stated, the objectives of the AIT are to communicate the facts surrounding this event to regional and headquarters management, to identify and communicate any generic safety concerns related to this event to regional and headquarters management, and to document the findings and conclusions of the onsite inspection.

If you have any questions regarding these objectives or the enclosed Charter, please do not hesitate to contact either myself or Monte Phillips of my staff.

I ~

Hu t J. Miller, Director Div1sion of Reactor Safety

Enclosure:

AIT Charter cc w/ enclosure:

A. B. Davis, RIII C. J. Paperiello, RIII F. J. Miraglia, NRR J. C. Partl'ow, NRR C. E. Rossi, NRR G. Holahan, NRR

. W. D. Lanning, NRR M. J. Virgilio, NRR R. W. Cooper, ED0 K. A. Connaughton, SRI 0

fgk2]gOK G

J

m.

O O PERRY MSIV STROKE TIME FAILURE AUGMENTED INSPECTION TEAM (AIT) CHARTER INVESTIGATE:

1. Failure of MSIVs to close/close within Technical _ Specification limits.
2. RootCause(s).
3. Interaction of prior maintenance / replacement activities to the event.
4. Broader implications, e.g., other systems, other valve / components.
5. Event reporting.
6. Conclusions.

QUESTIONS FOR PERRY AIT

1. Failure of MSIVs to close/close within Technical Specification limits.

(11/29/87) 1.1 What was the sequence of events?

1.2 What were the closure times generated during the surveillance?

1.3 What operator actions were taken during the event? Were they appropriate?

2. RootCause(s) 2.1 What was the root cause of the event? I l
3. Interaction of prior maintenance / replacement activities to the event.

3.1 What is the material condition of the affected valves and inter-connected air systems as it would affect the valve closure function?

3.2 What is the affect of the Asco valve refurbishment / replacement on the '

valve failure? l

4. Broader implications, e.g., other systems, other valve / components.

4.1 Is a IEIN or IEB warranted as a result of this event?

4.2 Are there other valves or instruments that require investigation?

i

J O O y

5. Event reporting.

5.1 Was the event reported as required?

6. Conclusions. ,

i 6.1 What corrective actions are porposed, and are they adequate? '

6.2 Examine generic implications to other plants and advise NRC management subsequent to the site inspection.

6.3 Document inspection findings in accordance with draft manual chapter 0325.

1 I

i l

e 1

1 I

i i

)

l

1 '. *

\

l

  • ATTACHMENT #3 I

\

  • AIR CYLINDER HYDR AULIC
  • DASH POT l SPRING GUIDE

( g/ .

ll '

(a 1 .

)

9 2 C: e ACTUATOR SUPPORT AND SP E ED CONTROL V ALVE m e HE LICAL SPRINGS e h

- i k

) \

I }

E '

C } -

5 <T 5

? SPRING SEAT MEMBER l d h STEM PACKING 1 LE AK OFF CONNECTION

{

! BONNET BOLTS s -

l' I nye f -

BONNET LANTERN RING CLEARANCE f% JQ~

h _$

. g=g .

N PILOT SPRING PILOT  % - BODY l PEPPET (PLUG, MAIN DISK)

E MAIN VALVE SE AT

% PILOT SE AT 1

j FLOW I

G PERRY NUCLEAR POWER PLANT THE CLEVELAND ELECTRIC I

ILLUMIN ATING COMPANY l

Main Steam Isolation Valve l Figure 5.4-8

l . .et-, - - -

)As m .

i

@ intw. ausert twt.a.e . set ersenns ==s * '

I

" ona u m es w win.co e cm woesasca. ATTACHMENT (4 i

] @ egt twat =am,posest twt.a.e >=ulrt casamen een (sitacrest towTect we64)wes et C Awoessas ca. 1 e

@ go te.=,,me,13 Twi,ue mot opgestgn avs was we t a woecaw ct

' @ [* twin went.3Jhe. ten n% cnesttg vaom(utae \

motu w en. w ws e,w m =. wtoico usan

@ {# Twit w.mAwoo creamita mut (tuecista met Ctarvaa, ww)wr. ev W1maart, sprick to (Atcet i

@ IV tettiums uncunaven nos amerug won (passar.  ;

wsta cameo sees es weataan.cA

@ l' rnu cancenterta new cartes mA(tetans

%rttt (metes) weg av wentive4 ten g* arma a yes (gt CDnenMMT% r9e TWRi&Al. (1PhW%Whd ort 4 on )ne% et teateratcoreanAtinu ,

{' .a.am

=m nectvnwr. ms (cou namisTwtwv ei tussata

@ tMtx Ett (rurunesta ti tmetag)

I.

~ t

@ me stoest.t tiens trurwn=t2 et entes)

]

,",,,",,N gN[ Q-E ad evtace = wt sme et t a tA M

t.9,,j;25mm cum 4 %stTot C1 A*WDR %=fTQ8 G 8 (h ~

TO ttMt mW -OPua guarttieg tt aan () 3 3 3~

in isteter veta c.ctin natt Mu tt ,

i- '.C 1m,. -. mm- ,.m,,(grt10m C14e4 o ,,C1- OAMin) - {@  %

mig US b h.am$

.cm .- - m /

g_ a u (basment toeCnnswr.tturwas E sests um.rtm)

{

l utstrue cowrncA ttlitk?%.6o ut, AL teou mw--'..*.... . ,1 yc vs jv _

( l l E ~

u-, x _ --

ist em.ts.6ona AA ..--

e 1

<-R, t

y y y

w v 9

! inuu unctusy suceme tenute ~~ t m E l

, s 44104tn.eso ig, n.L . . . . . .. . f lg l tu3hsf. W e

l unaarteu 19 tuCTur)un Cammert fraam PTuge ,

g l 8

  1. og #2 W t A( 3 f ala,(.s F pga wimmstvg m gurtugg . rmedAO w fa 4Cf & 5 DuurTut) rWhetsth 9' etW9%I 8 i a _, = _ _ _. . , . . y i ,

meessnemtemptanttsoen 13$M-Q *ti [

Ev1

  • * .- .... ..
  • 4 e

i

\

's .

ATTACHMENT #3

    • ~

T -.

30Lwc/o "A "

gik !

ll i f ,

ti ..'

f. I

/

{

ud in g y

j .

. : .'9, q

MJV # 44 o-ews. - i,-

)i h

pf v

,slp. -[ o J %{l%

[ A h o-afus

~

b / ptw3nd Awau)

' Nggl, ~M /./

- r l c <

'h

, , i ,,

f C ' I l 3 ~ Stivers of l l; gl Cc- 4 o-ri.3

- 'l I

, f he-e.

I J s  ; /

- \ \ /  :

..... .... . y .. ._ , m

};l [Q jK .Sotwoio '8 " \

.._ $ k II

~

k'f (,cre a w at$

[l e n N. IE j

- _ _ o 1 i I

i m), i

._ij_ __

gg T -f I l

Sheet 1 of 2 1

" l

_ i

' ~ ,j j __ e g

n -L I

ljj '

ri r-- -

1 R fa i. 2 -- ,

e ri b ! !r i g . . .  ;

1 4

k' i  !

E

's l

$ Q  ;

g s

x 3

[~ s o  ;

a t< ,} 4 l 3 $

a a :1 a 3 N cc.7m%,jj ,

c o w

k-  :;.

A*

f[r no ,

7t0D 3 c I

T t

~ - - ~. f g u g 5 a s -

O y%

s f g

t s

i N

o a h

o I s a k

A t<,f&  :

f a 3

- E e Dk 0 1

I 3

= N 'A \ ! c Q w l 7

--?.E e ,

w g

~

1!OD ' h Y, e um z c y/ -

t 5 7 r

=

o 6

... ~ -. .... ..

bh ee* H Sheet 2 of 2

r lo~ i , %

Attachment #6 SAMPLE DATE/ TIME DESCRIPTION ANALYSIS MSIV-1 11/6/87:1115 B21-F028B Deposits from 1 5/8" air hose. IR MSIV-2 11/6/87:1545 B21-F028B exhaust port (unknown fluid) IR MS 3 11/6/87:1115 Fitting from B21-F028B v/foreig.1 mat'l IR inside (black solids and oily fluid)

MSIV-4 11/6/87:2101 B21-F022D: = 0.1.ft.3 solenoid supply- PSC collected on 0.45u filter paper.

MSIV-5 11/6/87:2108 B21-F022D: = 0.1 ft.3 solenoid supply PSC collected on 0.459 filter paper.

MSIV-6 11/6/87:2125 B21-F022D: = 0.1 ft.3 actuator supply PSC collected on 0.45u' filter paper.

MSIV-7 11/6/87:2135 B21-F022D: = 0.1 ft.3 actuator supply PSC collected on 0.45p filter paper.

MSIV-8 11/7/87:0800 Rectorseal te Thread sealant sample. IR ta HSIV-9 11/7/87:0800 Neverseeze Thread lubricant sample IR 4

H3IV-10 11/7/87:0730 P52-F556: Instr. air at Containment GC penetration (outside). 10 min, blow-dovn, 5 min. purge of sampler.

O MSIV-11 11/7/87:0745 P52-F556: Instr. air at Containment GC penetration (outside). 10 min. blow-dovn, 15 min. purge of sampler.

MSIV-12 11/7/87:1151 B21-F028B: Solenoid supply, =0.lf t. PSC on 0.45p particulate filter.

MS1V-13 11/7/87:1202 B21-F028B: Solenoid supply, =0.lft.3 PSC on 0.45p particulate filter.

MSIV-14 11/7/87:1214 B21-F028B: Actuator supply, =0.lft.3 PSC on 0.459 particulate filter.

! HSIV-15 11/7/87:1220 B21-F028B: Actuator supply, =0.lf t.3 PSC on 0.45p particulate filter.

MSIV-16 11/7/87:1503 B21-F028B: Solenoid supply, =0.lf t.3 PSC on 0.45p particulate filter. I l

t l

i

~ s co ,

SAMPLE DATE/ TIME DESCRIPTION ANALYSIS MSIV-17 11/7/87:1521 B21-F028B: Solenoid supply, =0.5ft.3 PSC on 0.45u particulate filter.

MSIV-18 11/7/87:1537 B21-F028B: Actuator supply, =0.lft.3 PSC on 0.459 particulate filter.

MSIV-19 11/7/87:1553 B21-F028B: Actuator supply, =0.5ft.3 PSC i on 0.45p particulate filter.

MSIV-20 11/16/87:1600 B21-F028D: Solenoid valve body.

MSIV-21 11/16/87:1600 Solenoid Rebuild Kits (3 kits v/ elastomer ,

parts)

MSIV-22 11/16/87:1600 B21-F028A: Gaskets, disc, core assembly.

MSIV-23 11/16/87:1600 B21-F022B: Gaskets, disc, core assembly.

4 MSIV-24 11/16/87:1600 B21-F028B: Gaskets, disc, core assembly.  !

MSIV-25 11/16/87:1600 B21-F022C: Gaskets, disc, core assembly.

~

MSIV-26 11/16/87:1600 B21-F028C: Gaskets, disc, core assembly.

MSIV-27 11/16/87:1600 B21-F022D: Gaskets, disc, core assembly.

MSIV-28 11/16/87:1600 B21-F028D: Gaskets, disc, core assembly.

HSIV-29 11/30/87:1230 B21-F022B: Plungers, solenoid "B" i

MSIV-30 11/30/87:1230 B21-F022B Core Assembly, seats & gaskets.

a i j MSIV-31 11/30/87:1230 B21-F022B: Valve body. l HSIV-32 11/30/87:1230 B21-F022B: Foreign Material from Plunger area "B" solenoid (3 particles total)

MSIV-33 11/30/87:2200 B21-F022B Instrument Air grab sample from 2" supply.

I MSIV-34 11/30/87:2215 B21-F022B: Instrument Air grab sample from Solenoid supply line.

MSIV-35 12/03/87:1230 B21-F022B: 0-ring removed from "A" solenoid side of shuttle valve.

MSIV-36 12/03/87:1230 B21-F022B: Valve body gasket.

4 MSIV-37 12/03/87:1230 B21-F022B Adapte nut and 0-ring.

MSIV-38 12/03/87:1230 B21-F022B: "A" solenoid plug nut 0-ring.

r Attachment #7

. =

1 0

l

..u

. . ,. .m: , , .

,..as

,; 1

7., . y

+ ll l ?, ..

( ,;4'c- ; '. ,s ,<".

t, ' j t

,s y-

', "M4

(, ,jc #'.\

_ , - g=."..

" ~n;, ; .f. ;,

c

- .- y y 'i t i-h ., E+s '*;: M'e

- u cW, s

%  : s. vs . : -;

% . <rg. ~-

.m*s.%.p 34

.-~;, -* ( .

p

+n s *._.~

es ,e ,.t.,L s ,

Q y <* 1 ,

f,,.. , .. .

- :..= .. .,.

.. a...- .

. w '

y

- . .gs.,. 054  ;

y e > + . < ta t- ,,

ww s (, .s 5-,;ir,. ',w ca.-

.- ., ,', z + ??

i s , .. c... , , = m ~ '

e,y  %. ' %y;.; ; .

.g.. t ,l-r . 7 , w# . ,

MSIV 32 ,

9.8X 1mm = 102 pm Particles 1, 2& 3 Figure 1. MSIV 32 Optical Microscopy I

i f

1 i ,

J 4

I i

I I

l t

l t

Attachment #8 l

.i

. 1 i 1

> - ~ - ~

N&

j 4

2

- ii-;

.r j "[ .

I t g;.,..

, i i -f:

1  :-

i a. 9.8X 1mm = 102 pm l

1 I

i

' l l i

,i j

1 1 4

l l

l l

l I

I 1

1 I i i I

1

b. 25.8X 1mm = 39 pm Figure 4. MSIV 23 0-ring Optical Microscopy l

l.

I

---.-.,n_- , -- - - -,- - . - . - ,_,-a,-nn,_ _ - _ _ . - - . _ , - -emr,_-_ -, , . - a**vma - -

paa% UNITE 3 STATES ,!

. g NUCLEAR REGULATORY CIMMissCN O

.a "j

$ RE7 TON lli j

, tes moostvatt noAo f

$ eLEN ELLYN, ILLINol5 60lH

....+

DEC a1937 Dodet No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating .

Company ATTN: Mr. Murray R. Edelman Vice President Nuclear Group l Post Office Box 5000 l Cleveland, OH 44101 Gentlemen:

SUBJECT:

CONFIRMATORY ACTION LETTER NO. CAL-RIII-87-24 On November 29, 1987, a Main Steam Isolation Valve (MSIV) failed to close. This is the same type of event which occurred on October 29 and November 3, 1987, for which Confirmatory Action Letter No. CAL-RIII-87-19 was issued. As a result of the most recent event, an Augmented Inspection Team (AIT) was dispatched to the l site and a Confirmatory Action Letter (CAL-RIII-87-24) was issued on November 30, ,

1987, to document our understanding that you would perform the following actions pursuant to the review of the MSIV failure: '

i l 1. Take those actions necessary to ensure that complete documentary evidence of the "as found" condition of equipment being inspected is maintained.

2. Provide a step by step troubleshooting program to establish the root cause of the MSIV failure.

l l 3. Not disturb any components that offer a potential for being the root l cause including power sources, switches, solenoids, and the air system

! directly feeding the MSIVs until that action is approved by the leader of l the NRC AIT which has responsibility for examining this matter. We l

recognize that, per our authorization of November 29, 1987, the air pack was removed from MSIY IB21-F022B and the associated ASCO dual solenoid 3-way pilot valve was disassembled with the NRC AIT Team Leader present.

4. Except as dictated by plant safety, advise the NRC AIT Team Leader prior to conducting any troubleshooting activities. Such notification should be provided soon enough to allow time for the Team Leader to assign an I

inspector to observe activities.

5. Submit to NRC Region III a fomal report of your findings and conclusions I within 30 days of receipt of the November 30, 1987, Confirmatory Action I Letter. You may extend the submittal date of the fomal report requesteo in the NRC Confimatory Action Letter dated November 4,1987, to within l 30 days of the receipt of the November 30, 1987, Confimatory Action l Letter. I l

Q

DEC e 3987 The Cleveland Electric Illuminating 2 Company  ;

The November 30, 1987, Confinnatory Action Letter also specified that the -

plant would not be restarted without the concurrence of the Regional Administrator or his designee.

With respect to Items 1 through 4, you have completed all of the specified actions and these have been evaluated by the AIT. Their report will be issued shortly. With regard to Item 5, we understand you will submit to Region III a formal report as specified.

Based on a review of your corrective actions and commitments as specified in '

your letters dated December 4,1987 (PY-CEI/01E-0296L), and November 13, 1987 (PY-CEI/0!E-0289L), and based on the results of our AIT inspection, we believe you have established adequate plans for continued safe operation of the plant and for final resolution of this matter. Based on these reviews and conclusions, NRC concurrence was given in a telephone conversation between H. Miller and A. Kaplan on December 4, 1987 to restart the Perry Plant. This letter confirms that conversation.

Sincerely, I he w A. Bert Davis Regional Administrator See Attached Distribution n

1 4

. .: s DEC 81987 The Cleveland Electric Illuminating 3 Company I

l l

cc: F. R. Stead, Manager, Perry Plant Technical Department i

M. D. Lyster, Manager, Perry Plant i Operations Department Ms. E. M. Buzzelli, General l Supervising Engineer, Licensing and Compliance Section DCD/DCB(RIOS)

Licensing Fee Management Branch Resident Inspector, RIII l Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.

James W. Harris, State of Ohio Robert M. Quillin, Ohio Department of Health State of Ohio, Public Utilities Commission l R. Cooper, E00 ,

W. Lanning, NRR l F. Miraglia, NRR l G. Holahan, NRR M. Virgilio, NRR J. Partlow, NRR J. Strasma, RIII l i

! 1

! l i l i

l I

I 4

i

. - .