ML20196D046

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-440/87-27 on 871129-1204.Review Was in Response to Recent Failure of One MSIV to Stay Closed
ML20196D046
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/10/1988
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20196D050 List:
References
NUDOCS 8802160329
Download: ML20196D046 (2)


See also: IR 05000440/1987027

Text

A

FEB 101988

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTN: Mr. Alvin Kaplan

Vice President

Nuclear Group

10 Center Road

Perry, OH 44081

Gentlemen:

The enclosed report refers to the special onsite review conducted by an NRC

Augmented Inspection Team (AIT) composed of R. D. Lanksbury, S. D. Eick, and

.

G. F. O'Dwyer of this office and H. L. Ornstein (AE00), and S. D. Alexander

(NRR) on November 29 through December 4, 1987. The review was in response to

the recent failure of one Main Steam Isolation Valve to stay closed. Operation

of the Perry Nuclear Power Plant, Unit 1, is authorized by NRC Operating License

No. NPF-58.

The essence of our findings were discussed with Mr. A. Kaplan and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

The major purpose of the AIT was to conduct a timely, thorough, and systematic

inspection of the event in order to determine the cause(s), conditions, and

circumstances pertaining to it, and to communicate to NRC management the facts

and safety concerns related to the event. While primarily a fact finding

mission, issues identified by the AIT may be examined for possible enforcement-

in subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C.liude_r,t Jl-MH1'g P,.?. CPUd'W

8802160329 esoi!!o

,s--'

PDR

ADOCK 05000440

er, Director

G

PDR

Division of Reactor Safety

Enclosure: Augmented Inspection Team

Report No. 50-440/87027(DRS)

See Attached Distribution

RIII(N

RIII

RIII

RIII

Illh

III

RIII

I

/Q

kh

Ro 0

94 b

f4 b

illi

Eersey

ChT;is s

imos

Mi

r

Lanksbury/lc

0'Dwyer

Eick

>/f/f? ps j r

k

4 4

2/'t /88

NRR

NRR

Pd b

flblb

,h

Ornstein Alexander

K

. .

.

.

=_

-

.

-

i

A

,-

B 101980

The Cleveland Electric Illuminating

2

Company

Distribution

cc w/ enclosure:

-F. R. . Stead, Director, Perry

Plant Technical Department

M. D. Lyster, General Manager,

Perry Plant Operations

Department

Ms. E.-M. Buzzelli, Manager

Licensing and Compliance

Section

M.'R. Edelman, Nuclear

Vice President, Centerior Energy

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

,

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert M. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Commission

i

.

,

.

.

. _ . . .

,

,

. .,

-

...

-

- , , .-