Text
,
__
. - _ ____ _
L-
TE8-8 m
-+
_
In Reply Refer To:
Docket:
50-285/88-02
Omaha Public Power District
ATTN:
R. L. Andrews, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska
68102
L
Gentlemen:
This refers to the inspection conducted by G. A. Pick of this office during the
period January 4-15,1988. of activities authorized by NRC Operating
License DPR-40 for the Fort Calhoun Station and to the discussion of our
findings with you and members of your staff at the conclusion of the
inspection.
The area examined during the inspection included actions you have taken with
regard to previously identified inspection findings. The status of these items
is identified in paragraph 2 of the enclosed report. The inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspector.
The inspection findings
are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation.- in writing, in accordance with the provisions of Section 2.201
of the NRC's " M es of Practice," Part 2, Title 10. Code of Federal
Regulations. Your response should be based on the specifics contained in the
,
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
'
to the clearance procedures of the Office of Management and Budget as required
by the Papemork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
Original Signed 11y
A. B. Beach
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
(seenextpage)
RIV:Rl/DRS*
C:0PS*
D:DR
C:DRP/B
D:(
Reconcur
GAPick;df
JEGagliardo
JLMilhoan
TFWesterman
LJLallan JEGag'iardo
/ /8C
/ /88
)/a/88
v/v/88
2 /f/88 7 f /y
/
'
'See previous concurrence
0\\
"
8802120134 800200
I
ADOCK 05000285
G
_
-
.,
.
- _ -
__
,n
y
,o
.
.
,
a ->
.'
-
.
J
%
-
-
In Reply Refer To:
,
Docket:
50-285/88-02'
L
1
,
Omaha Pubile Power District
ATTN:
R. L. Andrews, Division Manager-
+
Nuclear Production
1623 Harney Street
.0maha,' Nebraska
68102
,
Gentlemen:
This refers to the inspection conducted by G. A. Pick of this office during the-
period-January 4-15, 1988, of activities authorized by NRC Operating
License DPR-40 for the Fort Calhoun Stotion and to the discussion of our
,
findings with members.of your staff at thn conclusion of the inspection.
,
The area examined during the inspection incisded actions you have taken with
~
'
regard to previously. identified inspection findings.
The status of these items
is identified in paragraph 2 of the er, closed report.
The inspection consisted
7
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspector.
The inspection findings
are documented in the enclosed inspection report.
.During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
,
of the NRC's "Rules of Practice," Part 2, Title 10. Code of Federal
<
Regulations.
Your response should be based on the specifics contained in the
'
Notice of Violation enclosed with this letter.
The response directed by this letter and the accorapanying Notice is not subject
to the clearance procedures of the Office of Nanagement and Budget.as required
by the Paperwork Reduction Act of 1980, PL 96-511.
,
Should you have any questions concerning this inspection, we will be pleased to
!
discuss them with you.
Sincerely,
,
L. J. Callan, Director
,
Division of Reactor Projects
!
!
Enclosures:
(see next page)
1
j
$
RIV:RI/D
C:0PS ' ~ .
D:DRSg
C:DRP/B
D:DRP
Reconcur
GAPick;d
JEGag11pdo
JLMilhoan
TFWesterman
LJCallan JEGagliardo
i1h188
I/16188
i / 4 /88
/ /88
/ 188
/ 188
\\
'
t
~
l
- -
-
-
.
,
,
-
3.-
,
5
- d
- i
s
Omaha Public Power District
-2-
i
Enclosures:
- 1.
Appendix A - Notice of Violation
' 2.
Appendix B - NRC Inspection Report
50-285/88-02
cc w/ enclosures:
Fort Calhoun Station
ATTN:
W. G. Gates Manager
P.O. Box 399
For t Calhoun, Nebraska
68023
Harry ~H. Voigt. Esq.
LeBoeuf Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
kashington, D. C.
20036
'
Kansas Radiation Control Program Direct'or
Nebraska Ra61ation Control Program Director
bec to DMB-(IE01)
,
bec distrib. by RIV:-
R.D. Martin, RA
RPSB-DRSS
'
- SectionChief(DRP/B)
- MIS System
- RIV File
- DRP
- RSTS Operator
- Project Engineer, DRP/B
- Lisa Shea, RM/ALF
- T. Bournia, NRR Project Manager
i
- R. Hall
- DRS
- TSS
- RRI
k
D. Powers
- G. Pick
4-
- w/766
Y
}
l
!
1
[
t
f
1
i
l
\\
,
I
i
!
j
L