Text
_. ____
.
.: -
r
'
DEC - 2 i988
-
In Reply Refer To:
Docket:
50-285/88-43
Omaha Public Power District
ATTN:
Kenneth J. Morris, Division Manager
Nuclear Operations
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Mr. L. D. Gilbert of this office
during the period November 14-18, 1988, of activities authorized by NRC
Operating License DPR-40 for Fort Calhoun Station, and to the discussion of our
fintiings with Mr. L. T. Kusek and other members of your staff at the conclusion
of the inspection.
The area examined during the inspection was structutal welding activities.
Within this area, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspector. The inspection findings are documented in
the enclosed inspction report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practice," Part 2 Title 10. Ccde of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clear &nce procedures of the Office of Management and Budget as required
by the Pape mork Reduction Act of 1980, PL 96-511.
One unresolved item is identified in paragraph 3 of the enclosed inspection
report.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
ll
phRh
o
0: L
RIV:RI jn$
C: M&QPS y ; [fJdilNoan
LJ:al en
f
LGilbert/cjg
IBarres
/ ./ / /88
/;///88
1 s h/ / /88
g/ 7, /88
I
8912050 3 7 ssings
- ), :
$0R
ADOCK 050003g7
f
FDC
'\\
_ _ _ _
_
____ ___ ________________ ________ ___ ______-____
.
(v :
-
.
Omaha Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
u:' ' _', '"
07
'
4
,
- L. J. Callan Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-285/88-43
cc w/ enclosures:
Fort Calhoun Station
ATTN:
W. G. Gates Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf. Lamb Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, D. C.
20036
Nebraska Radiation Control Program Director
bec to DMB (IE01)
bec distrib by P!V:
- R.D. Martin, RA
- RPB-DRSS
- Section Chief (DRP/B)
- MIS System
- RIV File
- DRP
- RSTS Operator
- Project Engineer, DRP/B
Lisa Shea, RM/ALF
- DRS
- P. Milano NRR Project Manager (MS:
13-D-18)
- RRI
- L. Gilbert
- !.
Barnes
- w/766