ML20195H196
| ML20195H196 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/17/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20195H199 | List: |
| References | |
| NUDOCS 8806280239 | |
| Download: ML20195H196 (3) | |
See also: IR 05000498/1988033
Text
_
_ - - _ _
. M il77iM31
+
.,
,
s
.In Reply Refer To:
Dockets:
50-498/88-33
50-499/88-33
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers-to the inspection conducted L Messrs. M. E. Murphy and E. P.
Hildebrand of this office during the peric) May 2-6, 1988, of activities
authorized by NRC Operating License NPF-76 and Construction Permic CPPR-129 for
the South Texas Project Units 1 and 2, and to the discussion of our findings
with Mr. J. T. Westermeier and other members of your staff at the conclusion of
the inspection.
Areas examined during the inspection included Unit 1 control room observations,
Unit 2 preoperational test program, aluminum bronze dealuminization, and
followup inspection regarding the unexpected loss of the reference temperature
signal during troubleshooting the steam dump controller. Within these areas,-
the inspection consisted of selected examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspectors.
The inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practica," Part 2. Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance proced: ires of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
- RIV:RI:PSS
- RI:PSS
AC:PSS
- D:DRS
C: S
MEMurphy;df
EPHildebrand
REIreland
JLMilhoan
GLConstablek
7
/ /88
/ /88
/ /88
/ /88
p6/p/88
'
, 0:DR
Reconcur
LJCa Wan
RE!reland
'
6/Q/88
/g/J7/88
I *Previously concurred
8G06280239 000617
ADOCK 0506049s
i(
0
TSOl
_ _ _ _ _ _ - .
_
_
y
.
.
...
..
Houston Lighting & Power Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you..
Sincerely.
Ond nal Signed By
i
A. D. Beach
L. J. Callan, Director
Division of Reactor Projects
-Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B -'NRC Inspection Report
50-498/88-33
50-499/88-33
cc w/ enclosures:
Houston Lighting & Fower Company
ATTN:
M. A. McBurnett, Manager
Operations Support Licensing
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTH:
Gerald E. Vaughn, Vice President
Nuclear Operations
P.O. Box 289
Houston, Texas 77001
Houston Lighting & Power Company
ATTN:
S. L. Rosen
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
J. T. Westermeier, General Manager
South Texas Project
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
R. W. Chewning, Chairman
Nuclear Safety Review Board
P.O. Box 289
Wadsworth, Texas 77483
_-
_s.
e .
Houston Lighting & Power Company
-3-
.
Central Power'& Light Company
ATTN:
R.
L.~ Range /R. P. Verret
P.0, Box 2121
Corpus Christi, Texas 78403
City Public Service Board
. ATTN:
R. J.'Costello/M. T. Hardt
P.O.' Box 1771
San Antonio, Texas 78296
City of Austin Electric Vtility
ATTN:
R. J. Miner, Chief Operating-
Officer
721 Barton Springs Road
Houston Lighting & Power Company
ATTN:
Licensing Representative
Suite 610
Three Metro Center
Bethesda, Maryland 20814
Newman & Holtzinger,- P.C.
ATTN:
J. R. Newman, Esquire
1615 L Street, N.W.
Washington, D.C.
20036
Texas Radiation Control. Program Director
,
bec to DMB (IE01)
bec distrib. by RIV:
- DRP
- RRI-0PS
R. D. Martin, RA
- DRS
- SectionChief(DRP/D)
- RPSB-DRSS
- MIS System
'
- RIV File
Lisa Shea, RM/ALF
- RSTS Operator
R. Bachmann, OGC
- D. Hunnicutt
- P. Kadambi, NRR Project Manager
- E. Hildebrand
G. F. Ganborn, E0
- M. Murphy
- R. Ir land
- w/765
,
,,
__
__
_ _ _ _ _
._
,
,_
. _ . . . - . . -
- - . . . .