ML20195G510

From kanterella
Jump to navigation Jump to search
Forwards Assessment of RCS Cold Hydrostatic Test Rept, Dtd 880616.Rept Describes Activities Re Issues & Concerns Associated W/Completion of Test,Results of Assessment & Adequacy of RCS Cold Hydrostatic Test
ML20195G510
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/17/1988
From: Counsil W, Woodland D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20195G515 List:
References
TXX-88529, NUDOCS 8806280024
Download: ML20195G510 (1)


Text

-

,i

-e s

s

= """

F7 Log # T)X-88529 1

File # 16010

~

Z Z

905.2 1UELECTRIC June 17, 1988 William G. Coundl Extrwolve Vwe Pres.Jent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 RCS COLD HYOR0 STATIC TEST Gentlemen:

l Our meeting of June 16, 1988, summarized the results of the assessment of the Unit 1 Reactor Coolant System (RCS) Cold Hydrostatic Test.

Enclosed is one (1) copy of our report, ER-ME-01, "Reactor Coolant System Cold Hydrostatic i

Test Report," dated June 16, 1988, and supporting documentation.

This report describes the activities relating to your issues and concerns associated with i

the completion of the test, results of tht, assessment and the adequecy of the l

RCS Cold Hydrostatic Test.

Please let me know if we can provide any further information in assisting you with comments and questions.

Very truly yours, b.b.

W. G. Counsil

\\

By:

D. R. Woodlan Docket Licensing Manager DAR/grr Enclosure c

Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) clo I

Texas Department of Labor and Standards Boiler Division

'q E. O. Thompson State Office Building

/ jgg,U k

P. 0. Box 12157, Capitol Station Austin, Texas 78701

'u Attn: Steve Matthews i

g 8806200024 000617 W PDR ADOCK 05000445 A

PDRs 400 N6rth Oltre herret LB8I Da!las. Texes 13.'01

- _ _ _ _.