Text

Exelon Nuclear 12BJob Performance Measure 0BInhibit and Prevent with a failure of the Division1 Injection Override Switch 1BJPM Number: S-RH-29 2BRevision Number: 00 3BDate: 6 / 4 / 2018 4BDeveloped By: C. Betken/s 8/8/18 5BInstructor Date 6BValidated By: Pratt / Quinn 7/22/18 7BSME or Instructor Date 8BReviewed By: T. Messner/s 8/9/18 9BTraining Department Date 10BApproved By: J. Messina/s 8/9/18 11BOperations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RH rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LPGP-PSTG-01S14 Rev: 8 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

S-RH rev 00 Revision Record (Summary)

Revision 00, Developed for 17-1 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

S-RH rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 358 Password 0358 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Load and run Smart Scenario S-RH-29.ssf.
3. Verify the Inhibit and Prevent Hardcard is Clean.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

S-RH rev 00 INITIAL CONDITIONS You are the Balance of Plant and Unit 1 has experienced an ATWS and LGA-010 has been entered.

INITIATING CUE The Unit Supervisor has ordered you to Inhibit ADS and Prevent ECCS Injection and to inform them when complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

S-RH rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE The Examinee may obtain a copy of the Inhibit and Prevent Hardcard NOTE The IC is a High Power ATWS and Pressure/Level will not Lower, therefore takes Pumps to OFF will not work as there is no Auto-start signal present.

  • 1 PREVENT HPCS Injection: Examinee takes 1E22-C001 to: ___ ___ ___

o OVERRIDE 1E22-C001,

o PLACE 1E22-C001, HPCS Pump, in PTL.

  • 2 PREVENT All LPCI Injection: Examinee prevents Div 2 LPCI: ___ ___ ___

o PLACE Div 2 Inj Override o PLACE Div 2 Inj Override Switch to ATWS Switch to ATWS

  • Verify the Div. 2 Red
  • Verify the Div. 2 Red Injection Override Injection Override Switch Light Switch Light Illuminated. Illuminated.
  • Verify White Manual

o OVERRIDE 1E12-C002C, 1C RHR Pump, OR Off.

o PLACE 1E12-C002C, 1C RHR Pump, in PTL. o PLACE 1E12-C002C, 1C o OVERRIDE 1E12- RHR Pump, in PTL.

C002B, 1B RHR Pump, o PLACE 1E12-C002B, 1B Off. RHR Pump, in PTL.

o PLACE 1E12-C002B, 1B RHR Pump, in PTL.

o At 500 psig in the RPV, OVERRIDE Closed 1E12-F042B, 1B RHR LPCI Injection Valve, if desire to use 1B RHR to cool pool/containment.

  • ALTERNATE PATH BEGINS HERE*

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RH rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE When the Div 1 Injection Override Switch is taken to the ATWS position It will fail.

This will be noticed by the Red light above the switch not illuminated AND the white light above the injection valves not illuminated.

NOTE If the Examinee attempts to take Div 1Pump Switches to PTL instead of the Injection Override Switch, the Pump Switches will fail and the Div 1 Injection Override Switch will work. (This is not the expected course for the examinees to take)

  • 3 PLACE DIV 1 Inj Override Examinee places the Div 1 ___ ___ ___

Switch to ATWS Injection Override Switch to the ATWS position and notes the

  • Verify the Div. 1 Red Failure of the Div 1 Injection Injection Override Switch Override Switch Light Illuminated.

RHR Pump, Off. Initiation signal is present and this method will not work.

Pump, in PTL. PTL 6 At 500 psig in the RPV, Examinee recognizes pressure ___ ___ ___

OVERRIDE Closed 1E12- is not currently lowering.

F042A, 1A RHR LPCI Injection Valve, if desire to use 1A RHR to cool pool/containment.

7 OVERRIDE 1E21-C001, LPCS Examinee recognizes no ECCS ___ ___ ___

Pump, Off. Initiation signal is present and this method will not work.

Pump, in PTL. PTL

  • 9 PLACE Div 1 ADS Inhibit switch Examinee places the Div 1 ADS ___ ___ ___

in INHIBIT. inhibit Switch to Inhibit.

  • 10 PLACE Div 2 ADS Inhibit switch Examinee places the Div 2 ADS ___ ___ ___

in INHIBIT. inhibit Switch to Inhibit.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RH rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number 11 Inform Unit Supervisor The Examinee informs Unit ___ ___ ___

Supervisor that ADS is Inhibited and ECCS is prevented.

CUE As Unit Supervisor acknowledge the report. JPM is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RH rev 00 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

0BInhibit and Prevent with a failure of the Division1 Injection Override Switch JPM Number: S-RH-29 Revision Number: 00 Task Number and

Title:

062.00.21 Given a System Lineup and various plant conditions, predict the system response to various components failures while operating the system K/A Number and Importance: 203000 RHR/LPCI Injection Mode A4.11 Ability to manually operate and/or monitor in the control room: Indicating lights and alarms Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): Plant Specific Technical Guidelines Section 14 - LGA-Related Hard Cards LPGP-PSTG-01S14 Revision 8 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 4 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RH rev 00 INITIAL CONDITIONS You are the Balance of Plant and Unit 1 has experienced an ATWS and LGA-010 has been entered.

INITIATING CUE The Unit Supervisor has ordered you to Inhibit ADS and Prevent ECCS Injection and to inform them when complete.

SRRS: 3D.100; There are no retention requirements for this section

Exelon Nuclear 12BJob Performance Measure 0BPerform LGA-MS-101 Hardcard 1BJPM Number: S-MS-06 2BRevision Number: 00 3BDate: 6 / 4 / 2018 4BDeveloped By: C. Betken/s 8/9/18 5BInstructor Date 6BValidated By: Pratt / Quinn 7/22/18 7BSME or Instructor Date 8BReviewed By: T. Messner/s 8/9/18 9BTraining Department Date 10BApproved By: J. Messina/s 8/9/18 11BOperations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-MS rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LGA-MS-101 Rev: 2 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

S-MS rev 00 Revision Record (Summary)

Revision 00, Developed for 17-1 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

S-MS rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 358 Password 0358 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. The LGA-MS-101 Hardcard is clean.
3. Verify keys 84, 85, 86, 87, 252, 253, 254, 255, and 256 are located in the cabinet.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

S-MS rev 00 INITIAL CONDITIONS You are an extra NSO

  • Unit 1 has experienced an ATWS
  • There are no indications of a Main Steam Line break INITIATING CUE The Unit Supervisor has ordered you to perform the LGA-MS-101 hard card and inform them when complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

S-MS rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE Examinee may obtain a copy of the LGA-MS-101 Hard Card

  • 1 At 1H13-P609: Examinee installs and turns ___ ___ ___

keys 253 and 254 at 1H13-

  • 2 At 1H13-P611: Examinee installs and turns ___ ___ ___

keys 255 and 256 at 1H13-

  • 3 PLACE in OPEN 1N62-F057, Examinee places the 1N62- ___ ___ ___

Off Gas Discharge To Stack. F057 control switch to OPEN

  • 4 At 1H13-P632: Examinee installs and turns ___ ___ ___

keys 84 and 86 at 1H13-P632

  • Install key 84 and turn switch 1E31A-S750 to bypass
  • Install key 86 and turn switch 1E31A-S752 to bypass SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-MS rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 5 At 1H13-P642: Examinee installs and turns ___ ___ ___

keys 85 and 87 at 1H13-P642

  • Install key 85 and turn switch 1E31A-S751 to bypass
  • Install key 87 and turn switch 1E31A-S753 to bypass
  • 6 At 1PM13J, Install key 252 and Examinee installs and turns key ___ ___ ___

turn switch 1HS-IN035, 1IN017 252 and turns 1HS-IN035 at RPV LOW LVL ISOL BYPASS 1PM13J IN035.

  • 7 At 1PM13J, Open 1IN059 and Examinee opens 1IN059 and ___ ___ ___

1IN060. 1IN060 at 1PM13J 8 At 1PM13J, Place and hold Examinee holds control switch ___ ___ ___

1IN017 control switch in the until 1IN017 is full open or verify open position until valve already open indicated full open.

9 Inform the Unit Supervisor Examinee informs Unit ___ ___ ___

Supervisor that LGA-MS-101 Hard Card is complete CUE As Unit Supervisor, Acknowledge the report. JPM Complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-MS rev 00 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

0BPerform LGA-MS-101 Hardcard JPM Number: S-MS-06 Revision Number: 00 Task Number and

Title:

432.000 Given Unit Supervisor authorization, evaluate plant conditions and Maintain a Heat Sink, IAW Station procedures.

K/A Number and Importance: 239001 A2.03 (4.0/4.2) Ability to (a) predict the impacts of the following on the MAIN AND REHEAT STEAM SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: MSIV closure Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LGA-MS-101, Unit 1 Using Main Condenser as Heat Sink in ATWS, Rev 2 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 11 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-MS rev 00 INITIAL CONDITIONS You are an extra NSO

  • Unit 1 has experienced an ATWS
  • There are no indications of a Main Steam Line break INITIATING CUE The Unit Supervisor has ordered you to perform the LGA-MS-101 hard card and inform them when complete.

SRRS: 3D.100; There are no retention requirements for this section

Exelon Nuclear 12BJob Performance Measure 0BAuto Transfer from MDRFP to TDRFP per LOP-RL-01 1BJPM Number: S-RL-01 2BRevision Number: 00 3BDate: 6 / 4 / 2018 4BDeveloped By: C. Betken/s 8/8/18 5BInstructor Date 6BValidated By: Pratt / Quinn 7/22/18 7BSME or Instructor Date 8BReviewed By: T. Messner/s 8/9/18 9BTraining Department Date 10BApproved By: J. Messina/s 8/10/18 11BOperations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RL rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LOP-RL-01 Rev: 26 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

S-RL rev 00 Revision Record (Summary)

Revision 00, Developed for 17-1 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

S-RL rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 357 Password 0357 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Have a marked up copy of LOP-RL-01.
3. Place the DS001 on the RRFC Screen.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

S-RL rev 00 INITIAL CONDITIONS You are the Unit NSO on Unit 1

  • 1A TDRFP is online in manual and ready for operation per LOP-FW-04
  • 1B TDRFP and Both Feed Reg Valves are in Auto INITIATING CUE The Unit Supervisor has directed you automatically transfer from the FRV to 1A TDRFP per LOP-RL-01.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

S-RL rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE When the examinee has acknowledged their imitating cue, hand them a copy of LOP-RL-01 1 Verify FRV is in AUTO control. Examinee verifies that both ___ ___ ___

The LFFRV may also be in FRVs are in auto AUTO.

2 Verify MDRFP min flow valve Examinee verifies that the ___ ___ ___

M/A station is in AUTO. MDRFP Min Flow Valve is in Auto

  • 3 Verify Oncoming TDRFP min Examinee places the TDRFP ___ ___ ___

flow valve M/A Station is in Min Flow Valve in Auto AUTO.

4 Verify Oncoming TDRFP is Examinee verifies the 1A ___ ___ ___

ready for operation per LOP- TDRFP is ready per LOP-FW-FW-04. 04 per Initial Conditions

  • 5 At 1DS001 Operator Station Examinee Navigates to the ___ ___ ___

RWLC Process Overview RWLC Process Overview screen Screen at the DS001

  • 6 SELECT appropriate transfer Examinee selects the FRV to A ___ ___ ___

sequence "FRV to A TDRFP" TDRFP and clicks start and PRESS Start.

NOTE TDRFP was feeding prior to transfer.

7 MONITOR on coming TDRFP Examinee monitors Reactor ___ ___ ___

and reactor water level control water Level and TDRFP Speed as the oncoming TDRFP accelerates and eventually injects to the reactor vessel SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RL rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number 8 VERIFY the component(s) in Examinee verifies that the ___ ___ ___

AUTO controls reactor water TDRFP controls Reactor Water level as the TDRFP increases Level its injection rate.

9 If reactor water level control is Examinee validates that RWLC ___ ___ ___

compromised, at the 1(2)DS001 is not compromised Operator Station RWLC Process Overview screen, SELECT the appropriate transfer sequence and press RESET OR enter LOA-FW-101(201) as required.

10 ALLOW the oncoming TDRFP Examinee verifies that the FRV ___ ___ ___

demand to ramp to the common is in Manual and the TDRFP is control output. WHEN the in Auto oncoming TDRFP demand reaches the common control output, the following will occur:

  • FRV and LFFRV M/A Station transfers to MANUAL.
  • Oncoming TDRFP M/A Station transfers to AUTO.

11 After a 3-minute time delay to Examinee verifies after 3 ___ ___ ___

allow system to stabilize, minutes that the FRV is CHECK the FRV/LFFRV start to closing/closed ramp closed.

12 VERIFY the components in Examinee checks MDRFP flow ___ ___ ___

AUTO control reactor water and verifies it is no longer level as the MDRFP decreases injecting its injection rate.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RL rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number 13 If reactor water level control is Examinee validates that RWLC ___ ___ ___

compromised, at the 1(2)DS001 is not compromised Operator Station RWLC Process Overview screen, SELECT the appropriate transfer sequence and press RESET OR ENTER LOA-FW-101(201) as required.

14 VERIFY proper operation of the Examinee verifies that the ___ ___ ___

MDRFP min flow valve. The MDRFP Min Flow Valve opens MDRFP min flow valve should below 2.0 Mlb/hr start to open below 2.0 Mlb/hr.

15 Inform Unit Supervisor Examinee informs Unit ___ ___ ___

Supervisor that the transfer sequence is complete CUE As Unit Supervisor, acknowledge the report. JPM complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RL rev 00 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

0BAuto Transfer from MDRFP to TDRFP per LOP-RL-01 JPM Number: S-RL-01 Revision Number: 00 Task Number and

Title:

31.009 Given Ubit Supervisor authorization, perform Control Room Actions to transfer RWLC from Manual to Automatic, IAW Station procedures K/A Number and Importance: 259002 A1.04 (3.6/3.6) Ability to predict and/or monitor changes in parameters associated with operating the REACTOR WATER LEVEL CONTROL SYSTEM controls including: Reactor water level control controller indications Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOP-RL-01, Operation of the Reactor Level Control System, Re. 26 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RL rev 00 INITIAL CONDITIONS You are the Unit NSO on Unit 1

  • 1A TDRFP is online in manual and ready for operation per LOP-FW-04
  • 1B TDRFP and Both Feed Reg Valves are in Auto INITIATING CUE The Unit Supervisor has directed you automatically transfer from the FRV to 1A TDRFP per LOP-RL-01.

SRRS: 3D.100; There are no retention requirements for this section

Exelon Nuclear 12BJob Performance Measure 0BDefeat Refueling Bridge Position Near or Over the Core Limit Switches Interlock 1BJPM Number: S-RM-02 2BRevision Number: 01 3BDate: 6 / 4 / 2018 4BDeveloped By: C. Betken/s 8/8/18 5BInstructor Date 6BValidated By: Pratt / Quinn 7/22/18 7BSME or Instructor Date 8BReviewed By: T. Messner/s 8/9/18 9BTraining Department Date 10BApproved By: J. Messina/s 8/9/18 11BOperations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RM rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LOP-RM-02 Rev: 23 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

S-RM rev 01 Revision Record (Summary)

Revision 00, New JPM developed for ILT 15-1 Cert Exam.

Revision 01, Revised JPM for new K/A statement SRRS: 3D.100; There are no retention requirements for this section

S-RM rev 01 SIMULATOR SETUP INSTRUCTIONS

1. Reset Simulator to IC # 151.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Have a copy of LOP-RM-02 (pages 1-9, 55-56) ready to provide to the Examinee.
3. VERIFY the ROD SELECT Display is in CONTROL Mode.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

S-RM rev 01 INITIAL CONDITIONS You are the Unit NSO,

- Unit 1 is at rated conditions.

- A Dry Cask Storage Campaign is in-progress on the Refuel Floor.

INITIATING CUE The Unit Supervisor has directed you to defeat the Pc - Refueling Bridge Position Near or Over the Core Limit Switches IAW LOP-RM-02, Rod Control Management System On Demand Functions, Step E.31 to support the Dry Cask Storage campaign. Notify the Unit Supervisor when complete with E.31.1.8.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

S-RM rev 01 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE: After the Examinee has demonstrated where to obtain a copy of the procedure, provide them with a copy of LOP-RM-02.

1 Obtain a copy of the procedure. Examinee demonstrates where ___ ___ ___

to obtain a copy of the procedure.

  • 2 SELECT SET PARAMETERS Examinee SELECTS SET ___ ___ ___

at the ROD SELECT Display or PARAMETERS at the Display the STATUS Display, whichever that is in the CONTROL mode.

is in the CONTROL mode.

  • 3 SELECT SET SYS PARAM. Examinee SELECTS SET SYS ___ ___ ___

PARAM.

CUE If the examinee requests the password, inform the examinee that the password is zero.

  • 4 ENTER the correct password Examinee ENTERS password ___ ___ ___

and SELECT ENTER, on the and SELECTS ENTER.

keypad that appears.

  • 5 SCROLL down the display Examinee SCROLLS down the ___ ___ ___

menu using the UP/DOWN display menu to HIGHLIGHT arrows to HIGHLIGH Pc- Pc- REFUELING BRIDGE REFUELING BRIDGE POSITION NEAR OR OVER POSITION NEAR OR OVER THE CORE LIMIT SWITCHES THE CORE LIMIT SWITCHES (SET TO NOT OTC/RESTORE (SET TO NOT OTC/RESTORE TO ACTUAL). (can also touch)

TO ACTUAL).

  • 6 SELECT SET TO NOT OTC Examinee SELECTS SET TO ___ ___ ___

using the LEFT/RIGHT arrows NOT OTC using the on the display. LEFT/RIGHT arrows on the display. (can also touch)

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RM rev 01 Comment STEP ELEMENT STANDARD SAT UNSAT Number 7 SET TO NOT OTC will be Examinee place keeps ___ ___ ___

highlighted in the area next to procedure step.

the description Pc -

REFUELING BRIDGE POSITION NEAR OR OVER THE CORE LIMIT SWITCHES (SET TO NOT OTC/RESTORE TO ACTUAL.

  • 8 SELECT ACCEPT to defeat Examinee SELECTS ACCEPT ___ ___ ___

the interlock and to defeat the interlock and ACKNOWLEDGES the pop-up ACKNOWLEDGES the pop-up confirmatory message.. confirmatory message.

9 NOTIFY Unit Supervisor the Examinee NOTIFES the Unit ___ ___ ___

interlock is defeated. Supervisor the interlock is defeated.

CUE As Unit Supervisor, acknowledge report. JPM is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RM rev 01 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

0BDefeat Refueling Bridge Position Near or Over the Core Limit Switches Interlock JPM Number: S-RM-02 Revision Number: 01 Task Number and

Title:

30.001 Given Unit Supervisor authorization, perform Control Room actions to support the movement of a fuel bundle or control rod blade guide within and between the Reactor and the Spent Fuel Pools.

K/A Number and Importance: 201002 K1.08 (3.2/3.6) Knowledge of the physical connections and/or cause -effect relationships between REACTOR MANUAL CONTROL SYSTEM and the following: Refueling interlocks Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOP-RM-02, Rod Control Management System On Demand Functions, Rev 23 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RM rev 01 INITIAL CONDITIONS You are the Unit NSO,

- Unit 1 is at rated conditions.

- A Dry Cask Storage Campaign is in-progress on the Refuel Floor.

INITIATING CUE The Unit Supervisor has directed you to defeat the Pc - Refueling Bridge Position Near or Over the Core Limit Switches IAW LOP-RM-02, Rod Control Management System On Demand Functions, Step E.31 to support the Dry Cask Storage campaign. Notify the Unit Supervisor when complete with E.31.1.8.

SRRS: 3D.100; There are no retention requirements for this section

Exelon Nuclear 12BJob Performance Measure 0BPerform a Loss of 142Y Hard Card with a Failure of the first ACB to Close 1BJPM Number: S-AP-08 2BRevision Number: 00 3BDate: 6 / 4 / 2018 4BDeveloped By: C. Betken/s 8/8/18 5BInstructor Date 6BValidated By: Pratt / Quinn 7/22/18 7BSME or Instructor Date 8BReviewed By: T. Messner/s 8/9/18 9BTraining Department Date 10BApproved By: J. Messina/s 8/9/18 11BOperations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-AP rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LOA-AP-101 Rev: 58 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

S-AP rev 00 Revision Record (Summary)

Revision 00, Developed for 17-1 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

S-AP rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to 356 Password 0356.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Load and Run Smart Scenario S-AP-08.ssf.
3. Verify the Loss of 142Y Hardcard is clean.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

S-AP rev 00 INITIAL CONDITIONS You are the Assist NSO

  • A loss of 142Y has occurred
  • 1A WR Pump is running and operating properly
  • 1A CRD Pump is running and operating properly
  • RPS Quick Swap Hardcard is complete
  • IA to IN Cross-Tie Hardcard is complete INITIATING CUE The Unit Supervisor has directed to you to Re-energize bus 142Y using the Loss of 142Y Hardcard and to inform them when 142Y is energized.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

S-AP rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE Examinee may obtain the Loss of 142Y hardcard.

NOTE The first method to re-energize 142Y will Fail (Steps 3, 4, or 5) and the second method to re-energize 142Y will Work (Steps 3, 4, or 5). Two of the steps MUST be complete to re-energize 142Y and the third step (and sub-steps of that step) may be N/Ad.

1 VERIFY annunciator 1PM01J- Examinee verifies 1PM01J- ___ ___ ___

B202, 4KV Bus 142X/Y B202 is clear Overcurrent alarm is CLEAR.

2 VERIFY all three phase Examinee verifies all 3 phases ___ ___ ___

voltages are approximately are equal on bus 142X using equal using 142X/Y Voltmeter the Bus 142X-142Y Voltmeter switch. Selector Switch

  • ALTERNATE PATH BEGINS HERE*

NOTE If this is the first method chosen ACB 1425 will fail to close.

CUE If the Examinee attempts to enter LOA-AP-101 at any time, inform them that another NSO will follow-up with LOA-AP-101.

  • 3 If 142X is energized, Examinee takes the Sync ___ ___ ___

SYNCHRONIZE and CLOSE Scope Selector Switch for ACB ACB 1425. 1425 to ON and takes ACB 1425 to close 4 If desired to re-energize 142Y from Unit-2:

CUE If the Examinee asks what is powering 242Y, inform them that 242Y is powered from the SAT.

4.1 CHECK 242Y energized from Examinee asks Unit 2 what is ___ ___ ___

Unit-2 SAT. powering 242Y CUE If the Examinee asks Unit 2 if ACB 2425 is open, inform them that ACB 2425 is open.

4.2 CHECK ACB 2425 is OPEN Examinee asks Unit 2 the status ___ ___ ___

of ACB 2424 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-AP rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE If the Examinee orders closing ACB 2424, inform them ACB 2424 is closed.

4.3 SYNCHRONIZE and CLOSE Examinee asks Unit 2 if ACB ___ ___ ___

ACB 2424. 2424 is closed NOTE If this is the first method chosen ACB 1424 will fail to close.

  • 4.4 SYNCHRONIZE and CLOSE Examinee takes ACB 1424 ___ ___ ___

ACB 1424. Sync Scope Selector Switch to ON and closes ACB 1424 5 If desired to re-energize 142Y from 1A DG:

NOTE If this is the first method chosen the 1A DG will not start.

NOTE If this is the second method chosen the 1A DG Output Breaker will Auto-close.

  • 5.1 If 1A DG did not auto-start, Examinee starts the 1A DG ___ ___ ___

START using control switch on START using control switch.

1PM01J.

5.2 If 1A DG will not start, REFER Examinee determines this step ___ ___ ___

to LOA-DG-101. is not applicable 5.3 If 1A DG Output Breaker ACB Examinee attempts to enter ___ ___ ___

1423 did not auto-close, LOA-AP-101 if this is the first REFER to LOA-AP-101. method chosen to re-energize 142Y 6 Inform Unit Supervisor Examinee informs Unit ___ ___ ___

Supervisor that Bus 142Y is re-energized CUE As Unit Supervisor, acknowledge the report. JPM complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-AP rev 00 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

0BPerform a Loss of 142Y Hard Card with a Failure of the first ACB to Close JPM Number: S-AP-08 Revision Number: 00 Task Number and

Title:

5.008, Provided initial conditions respond to a loss of 4KV ESS bus IAW station procedures.

K/A Number and Importance: 262001 A2.07 (3.0/3.2) Ability to (a) predict the impacts of the following on A.C. ELECTRICAL DISTRIBUTION; and (b) based on those predictions, use procedures to correct control, or mitigate the consequences of those abnormal conditions or operations: Energizing a dead bus Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOA-AP-101, Unit 1 AC Power System Abnormal Rev. 58 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 8 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-AP rev 00 INITIAL CONDITIONS You are the Assist NSO

  • A loss of 142Y has occurred
  • 1A WR Pump is running and operating properly
  • 1A CRD Pump is running and operating properly
  • RPS Quick Swap Hardcard is complete
  • IA to IN Cross-Tie Hardcard is complete INITIATING CUE The Unit Supervisor has directed to you to Re-energize bus 142Y using the Loss of 142Y Hardcard and to inform them when 142Y is energized.

SRRS: 3D.100; There are no retention requirements for this section

Exelon Nuclear 12BJob Performance Measure 0BShutdown Suppression Pool Cooling with High Rad 1BJPM Number: S-RH-28 2BRevision Number: 00 3BDate: 6 / 4 / 2018 4BDeveloped By: C. Betken/s 8/8/18 5BInstructor Date 6BValidated By: Pratt / Quinn 7/22/18 7BSME or Instructor Date 8BReviewed By: T. Messner/s 8/9/18 9BTraining Department Date 10BApproved By: J. Messina/s 8/9/18 11BOperations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RH rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LOP-RH-13 Rev: 32 Procedure LOP-RH-05 Rev: 34 Procedure LOR-1H13-P601B212 Rev: 2

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

S-RH rev 00 Revision Record (Summary)

Revision 00, Developed for 17-1 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

S-RH rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 355 Password 0355 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Load and run Smart Scenario S-RH-28.ssf.
3. Have marked up copies of LOP-RH-05 and LOP-RH-13.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

S-RH rev 00 INITIAL CONDITIONS You are the assist NSO

  • 1A RHR is in Suppression Pool Cooling to support a RCIC Surveillance
  • The RCIC Surveillance is complete
  • An EO is in the field standing by to assist you INITIATING CUE The Unit Supervisor has directed you to Secure Suppression Pool Cooling Water per LOP-RH-13 and to inform them when complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

S-RH rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE When the Examinee acknowledges their initiating cue, hand them a copy of LOP-RH-05 and LOP-RH-13.

Test to SP Vlv. A RHR Test to SP Vlv control switch to CLOSE.

2 VERIFY 1E12 F064A, A RHR Examinee verifies 1E12-F064A ___ ___ ___

Min Flow Vlv OPENS. A RHR Min Flow Vlv OPENS.

  • 3 STOP 1E12 C002A, A RHR Examinee Stops 1A RHR ___ ___ ___

Pump. Pump.

  • ALTERNATE PATH BEGINS HERE*

4 Annunciator 1H13-P601-B112 Examinee pulls the LOR-1H13- ___ ___ ___

alarms P601-B112 and follows it.

CUE If the Examinee reports the annunciator, acknowledge as the Unit Supervisor 5 CHECK Recorder 1D18-R602 Examinee notes the following ___ ___ ___

on 1H13-P600 is reading on 1H13-P600 and 1H13-P604:

greater than or equal to alarm

  • Recorder 1A WS setpoint and RECORD reading Radiation Monitor, 1D18-in Unit Log.

R602, reading approximately 800 cpm.

RECORD RHR Flow, Heat 6 Examinee notes: ___ ___ ___

Exchanger Pressure, and RHR Service Water Flow in Unit Log.

  • RHR Heat exchanger Pressure 7 Notify Chemistry Department to Examinee notifies the ___ ___ ___

sample tube side of RHR and Chemistry dept. to quantify the determine amount of release. release CUE Chemistry acknowledges too sample and quantify the release.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RH rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number 8 Place the Thermal Overload Verify places the Thermal ___ ___ ___

Bypass Switch in TEST for Overload Bypass Switch in 1E12-F068A. TEST for 1E12-F068A.

9 LOG positioning of O/L Bypass Verify request Unit NSO to log ___ ___ ___

switch in the Unit Log. position of O/L Bypass Switch.

CUE Unit NSO will log position of the O/L Bypass Switch.

Water Outlet Valve RHR HX Water Outlet Valve.

  • 11 When flow indicated on 1E12- Examinee stops RHR Service ___ ___ ___

R602A decreases to 4,000 Water Pump 1E12-C300A/B.

gpm, STOP 1E12-C300 A/B.

  • 12 When flow indicated on 1E12- Examinee stops RHR Service ___ ___ ___

R602A decreases to 0 gpm, Water Pump one 1E12-STOP one 1E12-C300 A/B. C300A/B.

13 Close 1E12-F003A Examinee closes 1E12-F003A ___ ___ ___

RHR HX Water Outlet Valve.

14 Close 1E12-F047A Examinee closes 1E12-F047A ___ ___ ___

RHR HX Water Outlet Valve.

15 Place the Thermal Overload Examinee places the Thermal ___ ___ ___

Bypass Switch in Normal for Overload Bypass Switch in 1E12-F068A. Normal for 1E12-F068A.

NOTE Additional RHR Service Water Valves may be closed in order to isolate the Heat Exchanger; however, closing the 1E12-F068A will stop the release path to the environment.

CUE Unit NSO will log position of the O/L Bypass Switch.

16 Inform Unit Supervisor that Examinee notifies Unit ___ ___ ___

could not complete the task. Supervisor 1A RHR WS is shutdown and isolated.

CUE As Unit Supervisor, acknowledge report. JPM is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RH rev 00 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

0BShutdown Suppression Pool Cooling with High Rad JPM Number: S-RH-28 Revision Number: 00 Task Number and

Title:

52.035 Provided initial conditions, respond to a High Release rate, IAW station procedures K/A Number and Importance: 272000 A1.01 (3.2/3.2) Ability to predict and/or monitor changes in parameters associated with operating the RADIATION MONITORING SYSTEM controls including: Lights, alarms, and indications associated with normal operations Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOP-RH-05, Operation of the RHR Service Water System Rev. 34; LOP-RH-13, Suppression Pool Cooling Operation, Rev. 32 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RH rev 00 INITIAL CONDITIONS You are the assist NSO

  • 1A RHR is in Suppression Pool Cooling to support a RCIC Surveillance
  • The RCIC Surveillance is complete
  • An EO is in the field standing by to assist you INITIATING CUE The Unit Supervisor has directed you to Secure Suppression Pool Cooling Water per LOP-RH-13 and to inform them when complete.

SRRS: 3D.100; There are no retention requirements for this section

Exelon Nuclear 12BJob Performance Measure 0BSwap WR Pumps per LOP-WR-02 (Alternate Path) 1BJPM Number: S-WR-02 2BRevision Number: 00 3BDate: 6 / 1 / 2016 4BDeveloped By: C. Betken/s 8/8/18 5BInstructor Date 6BValidated By: Pratt / Quinn 7/22/18 7BSME or Instructor Date 8BReviewed By: T. Messner/s 8/9/18 9BTraining Department Date 10BApproved By: J. Messina/s 8/9/18 11BOperations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-WR rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LOP-WR-02 Rev: 26 Procedure LOR-1PM10J-A201 Rev: 2 Procedure LOA-WR-101 Rev: 16

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

S-WR rev 00 Revision Record (Summary)

Revision 00, This JPM was developed NEW for the 2016 NRC Annual Exam.

SRRS: 3D.100; There are no retention requirements for this section

S-WR rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any Full Power IC NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. VERIFY 1A WR Pump RUNNING.
3. LOAD and RUN CAE SWR02r00.cae.
4. Have copies of LOP-WR-02
5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
6. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

S-WR rev 00 INITIAL CONDITIONS You are an NSO,

- 1A WR Pump is RUNNING on Unit 1.

- BOTH 1B and 0 WR Pumps are in standby on Unit 1 and ready to be placed in service.

- An Equipment Operator is standing by to assist you.

- Prestart checks are complete INITIATING CUE The Unit Supervisor has directed you to shift WR pump operation from the 1A WR Pump to the 1B Pump IAW LOP-WR-02, Startup and Operation of the Reactor Building Closed Cooling water System, Section E.2. Notify the Unit Supervisor when the WR Pump shift is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

S-WR rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE: After the Examinee demonstrates where to obtain a copy of the procedure provide them with a copy of LOP-WR-02.

1 OBTAIN a copy of LOP-WR-02. Examinee demonstrates how ___ ___ ___

OBTAIN a copy of LOP-WR-02.

  • 2 START 1B WR Pump from Examinee STARTS 1B WR ___ ___ ___

panel 1PM09J. Pump from panel 1PM09J.

CUE As Equipment Operator, if required, when request to perform post start checks report that post start checks of the 1B WR pump are completed SAT.

3 OBSERVE the 1B WR Pump Examinee OBSERVES the 1B ___ ___ ___

amperes on indicator 1II- WR Pump amperes on indicator WR005 on panel 1PM10J is 1II-WR005 on panel 1PM10J is slightly below normal running slightly below normal running amps of 145 to 172 amps. amps of 145 to 172 amps.

4 OBSERVE that the Unit 1 WR Examinee OBSERVES that the ___ ___ ___

Pump Discharge Header Unit 1 WR Pump Discharge Pressure increases on pressure Header Pressure increases on indicator 1PI-WR008 on panel pressure indicator 1PI-WR008 1PM10J and steadies out on panel 1PM10J and steadies slightly above normal operating out slightly above normal system pressure of 52 to 80 operating system pressure of 52 psig. to 80 psig.

NOTE: When the Examinee STOPS the 1A WR Pump a malfunction is automatically inserted to override 1B WR Pump Amps to show degrading amps and degrading WR Discharge Header Pressure.

5 STOP the 1A WR Pump after Examinee STOPS the 1A WR ___ ___ ___

the system pressure stabilizes. Pump after the system pressure stabilizes.

6 OBSERVE that the Unit 1 WR Examinee IDENTIFIES that the ___ ___ ___

Pump Discharge Header Unit 1 WR Pump Discharge Pressure returns to Header Pressure DID NOT approximately the same return to approximately the pressure prior to pump shifting same pressure prior to pump shifting AND pressures IS trending down.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-WR rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number 7 OBSERVE 1B WR Pump Examinee IDENTIFIES that the ___ ___ ___

amperes on indicator 1II- 1B WR Pump amperes on WR005 is between 145 and 172 indicator 1II-WR005 is between amps on panel 1PM10J. 145 and 172 amps on panel 1PM10J AND is trending down.

8 NOTIFY Unit Supervisor that 1B Examinee NOTIFIES Unit WR Pump trends are Supervisor that 1B WR Pump ABNORMAL and starting 1A trends are ABNORMAL and is WR Pump. starting 1A WR Pump.

CUE As Unit Supervisor acknowledge report.

  • ALTERNATE PATH BEGINS HERE*

9 If header pressure or amps are Examinee RESTARTS 1A WR ___ ___ ___

abnormal, PERFORM following: Pump.

  • RESTART the 1A WR Pump
  • STOP the 1B WR Pump 10 OBSERVE 1A WR Pump Examinee IDENTIFIES that the amperes on indicator 1II- 1A WR Pump amperes on WR002 is between 145 and 172 indicator 1II-WR002 is 0 amps amps on panel 1PM10J. on panel 1PM10J.

11 OBSERVE that the Unit 1 WR Examinee IDENTIFIES that the Pump Discharge Header Unit 1 WR Pump Discharge Pressure returns to Header Pressure CONTINUES approximately the same TO trend down.

pressure prior to pump shifting 12 NOTIFY Unit Supervisor that 1A Examinee NOTIFIES Unit WR Pump DID NOT START Supervisor that 1A WR Pump and starting 0 WR Pump. DID NOT START and is starting 0 WR Pump.

CUE As Unit Supervisor acknowledge report.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-WR rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 13 START Standby Reactor Examinee STARTS 0 WR ___ ___ ___

Building Closed Cooling Water Pump.

Pump per LOP-WR-02, Startup and Operation of Reactor Building Closed Cooling Water System.

14 OBSERVE that the Unit 1 WR Examinee OBSERVES that the ___ ___ ___

Pump Discharge Header Unit 1 WR Pump Discharge Pressure increases on pressure Header Pressure increases on indicator 1PI-WR008 on panel pressure indicator 1PI-WR008 1PM10J and steadies out on panel 1PM10J and steadies slightly above normal operating out slightly above normal system pressure of 52 to 80 operating system pressure of 52 psig. to 80 psig.

15 STOP the 1B WR Pump after Examinee STOPS the 1B WR ___ ___ ___

the system pressure stabilizes. Pump after the system pressure stabilizes.

16 OBSERVE that the Unit 1 WR Examinee OBSERVEs that the ___ ___ ___

Pump Discharge Header Unit 1 WR Pump Discharge Pressure returns to Header Pressure returns to approximately the same approximately the same pressure prior to pump shifting. pressure prior to shifting from 1A pump.

17 NOTIFY Unit Supervisor that Examinee NOTIFIES Unit ___ ___ ___

0WR is RUNNING supplying Supervisor that 0WR is Unit 1. RUNNING supplying Unit 1.

CUE As Unit Supervisor, acknowledge report. JPM is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-WR rev 00 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

0BSwap WR Pumps per LOP-WR-02 (Alternate Path)

JPM Number: S-WR-02 Revision Number: 00 Task Number and

Title:

114.008 Perform the Main Control Room actions to swap Reactor Building Closed Cooling Water (RBCCW) Pumps K/A Number and Importance: 400000 A4.01 3.1/3.0 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOP-WR-02, Startup and Operation of the Reactor Building Closed Cooling Water System, Rev. 26 LOR-1PM10J-A201 Reactor Building Closed Cooling Water Pump Discharge Header Pressure Low, Rev. 2 LOA-WR-101, Loss of Reactor Building Closed Cooling Water, Rev. 16 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 8 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-WR rev 00 INITIAL CONDITIONS You are an NSO,

- 1A WR Pump is RUNNING on Unit 1.

- Both 1B and 0 WR Pumps are in standby on Unit 1 and ready to be placed in service.

- An Equipment Operator is standing by to assist you.

- Prestart checks are complete INITIATING CUE The Unit Supervisor has directed you to shift WR pump operation from the 1A WR Pump to the 1B Pump IAW LOP-WR-02, Startup and Operation of the Reactor Building Closed Cooling water System, Section E.2. Notify the Unit Supervisor when 1B WR Pump is RUNNING.

SRRS: 3D.100; There are no retention requirements for this section

Exelon Nuclear 12BJob Performance Measure 0BPartial Half Scram per LOA-RP-101 1BJPM Number: S-RP-05 2BRevision Number: 00 3BDate: 10 / 3 / 2018 4BDeveloped By: Betken 10/4/18 5BInstructor Date 6BValidated By: Reyes 10/4/18 7BSME or Instructor Date 8BReviewed By: Messner 10/4/18 9BTraining Department Date 10BApproved By: Messina 10/4/18 11BOperations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RP rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LOA-RP-101 Rev: 16 Procedure LOA-RP-Q6 Rev: 0 Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

S-RP rev 00 Revision Record (Summary)

Revision 00, Developed for 17-1 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

S-RP rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 151 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Load and Run Smart Scenario S-RP-05.ssf
3. Have a copy of LOS-RP-Q6 Attachments 1A and 1B with which sections B, C and D marked up.
4. Place flags on 1H13-P603-B203, B211, B303, B311, B504, B510.
5. Verify LOA-RP-101 is clean.
6. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
7. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

S-RP rev 00 INITIAL CONDITIONS You are the Unit 1 ATC

  • Unit 1 is at 100% power
  • LOS-RP-Q6 is in progress
  • IMD is NOT performing LIS-RP-101A and B in conjunction with this surveillance INITIATING CUE The Unit Supervisor has directed you to perform LOS-RP-Q6 starting at step 6 of Attachment 1A and to inform them when complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

S-RP rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE When the examinee has acknowledges their initiating cue, hand them a copy of LOS-RP-Q6.

1 If IMD is performing LIS-RP- Examinee determines that IMD ___ ___ ___

101A, then VERIFY recorder is is not performing LIS-RP-101A.

hooked up and IMD is ready to record response time data.

pushbutton for Trip System A1 Pushbutton and verifies and VERIFY the CHAN A annunciator 1H13-P603-B504 MANUAL SCRAM SWITCH illuminates.

ARMED alarm illuminates.

3 If IMD is performing LIS-RP- Examinee determines that IMD ___ ___ ___

101A, then DIRECT IMD to is not performing LIS-RP-101A.

START recorder and when all recorder traces have changed state, then STOP the recorder.

  • 4 Momentarily PRESS the Examinee depresses the A1 ___ ___ ___

Reactor Manual Scram pushbutton and verifies pushbutton for Trip System A1 annunciator 1H13-P603-B203 and CHECK the following: illuminates and the A Solenoid lights de-energize.

  • CHAN A1 REACTOR AUTO SCRAM alarm illuminates.
  • SCRAM GROUP A Solenoid lights de-energize.
  • ALTERNATE PATH BEGINS HERE*
  • 5 RESET the tripped channel and Examinee takes the Scram ___ ___ ___

CHECK the following: reset switch clockwise and counterclockwise and

  • SCRAM GROUP A determines the A Group 3 light Solenoid lights re-did not re-energize.

energize.

  • CHAN A1 REACTOR AUTO SCRAM alarm can be reset.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RP rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE If the Examinee attempts to check the light bulb, inform them that the bulb is NOT burnt out.

NOTE The Examinee may obtain a copy of LOA-RP-101.

6 CHECK and continue to monitor Examinee determines that only ___ ___ ___

the following: one bus is affected and no control rods are moving.

  • ONLY one RPS Bus -

affected AND

7 SUSPEND any HALF SCRAM Examinee determines from the ___ ___ ___

testing in progress. initial conditions that testing is in progress and should be suspended.

CUE If the Examinee asks the status of Fuse F18C, inform the examinee that the Assist NSO has checked the fuse, was blown and it has been replaced.

8 CHECK RPS BUS Scram Sol Examinee determines only the ___ ___ ___

Group light(s) out on a single Group 3 light is out on RPS A.

RPS BUS:

o Scram Sol Group 1 and 4 OR o Scram Sol Group 2 and 3 OR o ONLY a single solenoid group light 9 VERIFY affected 1C71-F18 Examinee determines no fuses ___ ___ ___

fuse(s) NOT blown at panel are currently blown.

1H13 P609 or 1H13-P611.

10 RESET HALF SCRAM. Examinee determines the Half ___ ___ ___

Scram will not reset.

CUE If the Examinee asks the status of Fuse F18C, inform the examinee that the Assist NSO has checked the fuse and it is NOT blown.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RP rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 11 INSERT a HALF SCRAM on the Examinee will insert a Half ___ ___ ___

affected RPS BUS. Scram on the A RPS Bus by arming and depressing the A1 and/or A2 Manual Scram Pushbuttons.

12 Inform Unit Supervisor. Examinee Informs Unit ___ ___ ___

Supervisor that B.5 of LOA-RP-101 is complete and a Half Scram has been inserted on A RPS.

CUE As Unit Supervisor, acknowledge the report. JPM Complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RP rev 00 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

0BPartial Half Scram per LOA-RP-101 JPM Number: S-RP-05 Revision Number: 00 Task Number and

Title:

49.017 Given Unit Supervisor authorization, Reset the RPS system scram, IAW station procedures K/A Number and Importance: 212000 Reactor Protection System A4.07 (4.0/3.9) Ability to manually operate and/or monitor in the control room: System status and lights Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOA-RP-101, Unit 1 Loss of Reactor Protection System Power, Rev. 16; LOS-RP-Q6, Manual Scram Instrumentation, Rev. 0 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-RP rev 00 INITIAL CONDITIONS You are the Unit 1 ATC

  • Unit 1 is at 100% power
  • LOS-RP-Q6 is in progress
  • IMD is NOT performing LIS-RP-101A and B in conjunction with this surveillance INITIATING CUE The Unit Supervisor has directed you to perform LOS-RP-Q6 starting at step 6 of Attachment 1A and to inform them when complete.

SRRS: 3D.100; There are no retention requirements for this section