ML20155F508
| ML20155F508 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 06/09/1988 |
| From: | Ronald Bellamy NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sieber J DUQUESNE LIGHT CO. |
| Shared Package | |
| ML20155F512 | List: |
| References | |
| NUDOCS 8806160412 | |
| Download: ML20155F508 (2) | |
See also: IR 05000334/1988014
Text
.
-
_- -- -- _
4
.
.
l
'
-
-
De ignated
ri . inal
k
4
MdYU
'
Naf}a
.
JUN 0 9 19h_
~
Docket Nos. 50-3L4/50-412
Duquesne Light Company
ATTN: Mr. J. D. Sieber
Vice President
Nuclear Group
Post Office Box 4
Shippingport, Pennsylvania 15077
Gentlemen:
Subject: Combined Inspection Nos. 50-334/88-14 and 50-412/88-09
This refers to the routine security inspection conducted by Mr. W. K. Lancaster
of this office on April 25-29, 1988, of activities authorized by NRC License
Nos. OPR-66 and NPF-73 and to the discussions of our findings held by
Mr. Lancaster with members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no violations were observed.
Paragraphs 7, 10 and 14 of the enclosed inspection report centain details
of your security program that have been determined to be exempt from public
disclosure in accordance with 10 CFR 73.21 (Safeguards Information).
There-
fore, they will not be placed in the NRC Public Document Room and will receive
limited distribution.
This letter and the remainder of the inspection report
will be placed in the Public Document Room, in accordance with 10 CFR 2.790(a).
No reply to this letter is required.
Your cooperation is appreciated.
Sir.cerely,
~
C. !nal Sicned Byi
F.id.a; d R. %e imig
Ronald R. Bellamy, Chief
Facilities P.adiological Safety
and Safeguards Branch
Division of Radiation Safety
and Safeguards
0FFICIAL RECORD COPY
CIR SG BV 88-14/09 - 0001.0.0
06/06/88
\\\\
i""h
8806160412 880609
ADOCK 05000334
O
-
. .
.
~
Duquesne Light Company
2
JUN 0pgggg
Enclesure:
Combined NRC Region I Inspection Report Nos. 50-334/88-14 and
50-412/88-09 (Paragraphs 7, 10 and 14 contain Safeguards Information
(SGI))
cc w/enci (w/o SGI):
J. J. Carey, Executive Vice President, Operations
W. J. Roy, Director, Administrative Services
H. L. Harper, Director of Security (w/SGI)
H. M. Siegel, Manager, Nuclear Engineering Department
C. E. Ewing, QA Manager
W.S. Lacey, General Manager, Nuclear Operations Department
R. Druga, Manager, Technical Services
R. Martin, Manager, Regulatory Affairs
J. Crockett, Senior Manager of Nuclear Operations
N. R. Tonet, Manager, Nuclear Engineering & Construction Unit
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/SGI)
Commonwealth of Pennsylvania
bec w/enci (w/o SGI):
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o en:1)
L. Tripp, DRP
0. Limroth, DRP
P. Tam, LPM, NRR
R. Bores, DRSS
l
l
l
l
l
l
RI:0RSS @ b
RI:
RI:D
,
Lancaster/sh/ms
K
.ig
Smith
'
!
6/@ /88
6/7/88
6//p/88
I
l
!
0FFICIAL RECORD COPY
CIR SG BV 88-14/09 - 0002.0.0
06/06/88
l
l
,
-
- _ - - - -
-
. _
-
-. _.
. - - .
- - .
_ - -