ML20155D651

From kanterella
Jump to navigation Jump to search
Discusses Confirmatory Survey of Phase IV Decommissioning Activities at Ga Co on 880620-29.Decontamination Efforts by Licensee Have Been Effective in Meeting Radiological Conditions Established for Release of Site for Use
ML20155D651
Person / Time
Site: 07000734
Issue date: 09/28/1988
From: Berger J
OAK RIDGE ASSOCIATED UNIVERSITIES
To: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20155D617 List:
References
24839, NUDOCS 8810110330
Download: ML20155D651 (1)


Text

www

(

.A r"

-w Vwiuo..c i Lu..a te. rs Oak Ridg0

u. w.n.:n.ru r.;m na Associated Post Office 80x 117 Un.versities Oak Ridge. Tennesseu 37831-0117 a..u,: >

September 28, 1988 Mr. Leland C. Rouse Diviaton of Industrial and Mcdical Nuclear Safety Mail Stop 6H3 Nuclear Regulatory Commission Weehington, DC 20555 Sutsj uw l.

SURVEY PINDINGS CA TEC!!FOLCCIES PNASE TV nFC0!OtiX510NING Dear Mr. Rouses AL Lhu 6 gveet of the NRC negies V of ficu, Ouk Ridga Acconiated Universities' performed a confirmatory survey of Phase IV decommissioning activities at CA Technologies, Inc. in San Diego, Ca11tornia, curing Juna MU-4), 1966. Phase IT decommissioning consisted of 12 laboratories in Building 2, Areaa 51, and Area B3 (Callan Ponds).

The survey included alpha, beta-gaana, and gamme peanat exposure rate measurementui measuremente of total and removable surf ace The contamination; and muuuurument of radionuclide concentrations in coil.

survey identified seversi small areas of residual contesination in laboratory rooms, which Wara remediated and rumuevvyud by ORAU. Other s.easureadte end osaploo woro within octablichod guidelines.

Based on these results it fa ORAU's opinion that the decontamination utforte by the licensee have been ef fective in meeting the radiological conditions estabi!shed for release of this site for unrestricted use.

A complete report un this uvutirmatory survey is in preparation and will be provided to your office within several weeks.

/

Sincerely, A

/

. ~.,Lk bx.y e '/

J a'fi D. Berger, Manager Ra ological Site Assessment Prograa JDBlaec ces D. McCaughey, NLlu/tt1J J

G. 1.aRoche, NRC/6H3 O. Tiktinsky, NRC/6A4 E. Davis, NRC/6A4 3

d.

y, C