Advises That Info Contained in & Suppl Requesting Amend to Plant,Unit 2 Operating License,Proposing Rev to TSs to Provide New Slmcpr,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5)
ML20155A680
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/26/1998
From: Thadani M
NRC (Affiliation Not Assigned)
To: Watford G
GENERAL ELECTRIC CO.
References
TAC-MA2353, NUDOCS 9810290215
Download: ML20155A680 (5)


Text

_ - -. _- -

Ap[,%

Md77 UNITED STATES g

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20066 0001 g/

October 26, 1998 Mr. Glen A. Watford Manager, Nuclear Fuel Engineering General Electric Company P.O. Box 780 Wilmington, NC 28402

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE, PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 (TAC NO. MA2353)

Dear Mr. Watford:

By application dated July 10,1998, and supplemented by letter dated September 11,1998, PECO Energy Company (PECO) requested amendment for Peach Bottom Atomic Power Station (PBAPS), Unit 2, operating license, proposing revision to the Technical Specifications to provide a new Safety Limit Minimum Critical Power Ratio (SLMCPR). That request included a General Electric Company (GE) letter from Steven B. Shelton, GE Nuclear Energy, to K. W. Hunt, PECO Energy Company (addressed to PECO NUCLEAR), " Peach Bottom, Unit 2, Cycle 13 Safety Limit MCPR," dated June 10,1998. That letter included your affidavit dated June 16,1998; requesting that the document be withheld from public disclosure pursuant to 10 CFR 2.790.

PECO's supplemental letter dated September 11,1998, forwarded your affidavit dated September 10,1998, requesting that additional supplemental documents be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version wa.s submitted for placement in the NRC's public document room.

The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(1) Information discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; and (2)

Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed the above application and the materialin accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.

Therefore, the version of the cubmitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concemed to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

9810290215 981026 ij Ul b

PDR ADOCK 05000277 P

PDR 4 2,. u -)

}

G. Watford j l

If the basis for withholding this information from public inspection should change in the future j

such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this j

determhation in the future, for example, if the scope of a Freedom of Information Act request 1

includes your information. In all review situations, if the NRC makes a determination adverse to 1

the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at (301) 415-1476.

Sincerely, j

i

/s/

I I

Mohan C. Thadani, Senior Project Manager i

Project Directorate 1-2 j

Division of Reactor Projects - 1/11 l

Office of Nuclear Reactor Regulation Docket No. 50-277 cc: See next page DISTRIBUTION Docket File PUBLIC

.PDI-2 Reading f

JZwolinski i

RCapra MThadani MO'Brien TCollins MPSiemien, OGC

{

CAnderson, RGN-l A/

PDI-2/CM^/7hSRX@lRef/

OGC PDI 2/O OFFICE P

NAME hfhadani:rb MO'Brien TCoifiks Mkfm. RCapra b DATE

/# /f/98 b/h98

/8//.5 98 10 0[/98 to /26/98 OFFICIAL RECORD COPY

.pla1 DOCUMENT NAME: P82353. PRO i

s, G. Watford If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of information Act request includes your information. In all review situations, if the NRC makes a determination adverse to 1

the above, you will be notified in advance of any public disclosure.

1 if you have any questions regarding this matter, I may be reached at (301) 415-1476.

Sincerely, Mohan C. Thadani, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Docket No. 50-277 cc: See next page t

i l

l I

l

G. Watford If the basis for withholding this information from public inspection should change in the future such that tiie information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

if you have any questions regarding this matter, I may be reached at (301) 415-1476.

Sincerely,

/s/

Mohan C. Thadani, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation Docket No. 50-277 cc: See next page DISTRIBUTION Docket File PUBLIC PDl-2 Reading JZwolinski RCapra MThadani MO'Brien TCollins MPSiemien, OGC CAnderson, RGN-l A/

PDI-2/dN SRX W /

OGC PDI-2/D OFFICE P

NAME hfhadani:rb MO'krie TCo$sh fd k h.RCapra b DATE

/0 /fl98 h/.h98

/8//j[98 lO/N/98 to /26/98 OFFICIAL RECORD COPY jfl.21 DOCUMENT NAME: PB2353. PRO l

i I

PECO En:rgy Compiny Peach Bottom Atomic Pow;r Station, Units 2 and 3 cc:

J. W. Durham, Sr., Esquire Sr. V.P. & General Counsel Chief-Division of Nuclear Safety PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. J. Doering, Vice President Peach Bottom Atomic Power Station Board of Supervisors 1848 Lay Road Peach Bottom Township R.D.#1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-5S Engineering Division Peach Bottom Atomic Power Station 1848 Lay Road Chief Engineer 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Peach Bottom Atomic Power Station Power Plant and Environmental P.O. Box 399 Review Division Delta, PA 17314 Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission C r. Judith Johnsrud 475 Allendale Road King of Prussia, PA 19406 National Energy Committee Sierra Club 433 Orlando Avenue Mr. Roland Fletcher

. Department of Environment State College, PA 16803 201 West Preston Street Baltimore, MD 21201 Manager-Financial Control & Co-Owner Affairs A. F. Kirby, lll Public Service Electric and Gas Extemal Operations - Nuclear Company P.O. Box 236 Delmarva Power & Light Company P.O. Box 231 Hancocks Bridge, NJ 08038-0236 Wilmington, DE 19899 Manager Peach Bottom Licensing PECO Energy Company PECO Energy Company Plant Manager Nuclear Group Headquarters Peach Bottom Atomic Power Station Correspondence Control Desk P.O. Box No.195 1848 Lay Road Delta, PA 17314 Wayne, PA 19087-0195 i

Mr. Garrett D. Edwards Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195