Forwards Handwritten Comments Re 831130 Proposed Final Sholly Rule on Significant Hazards Considerations.Impact of Interim Sholly Regulations Should Be Brought to Commissioners Attention
ML20155B495
Person / Time
Site: 05000000
Issue date: 04/08/1986
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Cunningham G
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Shared Package
ML20150F521 List: ... further results
References
FRN-45FR20491, RULE-PR-2, RULE-PR-50 AA61-2-057, AA61-2-57, NUDOCS 8604160185
Download: ML20155B495 (9)


Text

d **."' 44 g

-4

,. j k

UNITED STATES -

  • * ~

[

g NUCLEAR REGULATORY COMMISSION 5

wasHswoTow o.c.mosss

%,.....,o MEMORANDUM FOR:'

Guy H. Cunningham, Executive Legal Director FROM:

Harold R. Denton, Director Office of Nuclear Reactor Regulationj

SUBJECT:

COMMENTS ON PROPOSED FINAL SH0LLY RULE ON SIGNIFICAhT HAZARDS CONSIDERATIONS Coments concerning your Nov' ember 30, 1983 version of the proposed final regulations are contained in the enclosure. The impact of the interim Sholly regulations, particularly with the results achieved to date, should be brought to the attention of the Comissioners when they are considering the final Sholly regulations.

Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosure:

As st edW C4 t t:

J. Thoma, NRR 49-27356 l

W 8604160185 860327 PDR PR 2 45FR20491 PDR

0 e'

e i

ENCLOSURE 1.

IMPACT The interim Shol,ly regulations and the proposed final Sholly regulations require a significant amount of effort to implement. The attached memorandum

  • from Dominic C. Dilannj provides an estimate of the costs of implementing the present interim Sholly regulations. He estimates an annual cost-of 18.6 professional staff years and a publication cost of $187,Q00 for pre-noticing amendment requests having no significant hazards considerations.

@ As of Au' gust 22, 1984, the results of this activity are as follows: a total y

of 1440 Sholly notices have been issued.

Public coments have been received Vi ghirteen times (involving five amendment requests) and sixteen requests for

/

t' hearings have been received (involving nine amendment requests).

Six amend-h ments have been issued utilizing the imediate effectiveness provisions of the fl regulation in that a hearing was requested and a final no significant hazards J

consideration was made. This data indicates that less than 1% of this effort to involve the public actually resulted in public participation.

One could reasonably question whether or not Congress intended this amount of resource expenditure to implement the Sholly regulations, particularly with the results achieved to date.

This impact should be brought to the attention U l MW'p/9+6 k of the Comissioners when consid ring'the final Sholly regulations.

, / g 4 s f (c/J g#

2.

Definition of Emergency y

Either expand the definition of an emer{ency in the regulation or provide for an extremely short p0blic notification period (much less than the two weeks presently in the regulations) for selected "exiaent circumstances" to minimize the total impact of a purely administrative delay.

The proposed final rule states that all circumstances classified as " exigencies" allow a minimum of a two week public coment period. However, there are practical situations involving no significant hazards considerations which might otherwise be considered an exigency but which must be acted upon with the same urgency as an emeroency situation.

These circumstances include amendments involving no significant hazards considerations which if not issued promptly would extend a shutdown, extend a derating condition, or would require a shutdown plant to take certain actions which are impractical under the specific plant conditions.

The preferred solution is to expand the definition of an emergency situation to include these situations.

It has been the staff policy since August 17, 1983 to include events involving NSHC which extend a shutdown under the definition of an~einergency.

  • With respect to the Dilanni proposal to eliminate noticing, this was responded to by OELD memorandum (Dorian to Lainas dated August 20,1984) which indicated that this noticing procedure was required by public law.

\\

t 1

s

,5V W

&,m(VX2

.n Several public coments were received on this same su ject.

In response to these public coninents, page 49 of the proposed final Sholl regulations states that nothing in legislative history indicates that the mmission.should take other factors into corisideration such as shutdown plants, higher levels of power generation, or _.M "jm when considering an emergency situation.

We disa W with this statement.

The present' definition of an emergency situation is one in which immediate action is necessary to prevent /the shutdown or derating of an operating plant.

Preventing shutdown and preventing derating

, is very strongly connected with economic injury, allowing higher levels of power generation, and allowing start-up.

Therefore, expa'nding the definition of an " emergency situation" to include these circumstances is consistent with the law and legislative history.

3.

Definition of Significant #

A definition of "significant" would be useful in the Sholly regulations.

For example, "significant reduction in margins" used in the criteria for determining significant hazards considerations, does this mean a reduction in margin between a code allowable value and an actual safety limit, or any reduction at all.

One could reasonably argue that any change which results in a value still contained within code allowable values (or SRP values) is not "signifi-cant" and changes in this area simply allow for design flexibility.

We realize the problem with fomal definitions in that they restrict interpretation of the regulations, but some help in this area is needed.

Perhaps instead of a fonnal definition, an example of a NSHC could be provided which involves a reduction in safety margins.

In addition, we and the Commission have been having some difficulty interpreting the criteria for making determinations on significant hazards.

The Comission had indicated other kinds of examples such as how extensive is the review effort which might be considered in making these determinations.

Currently, we have no good proposal to make to add to the standards.

4.

State Consultation a.

Paragraph 50.91(b)(2) on page 91 of the proposed final Sholly regulations states that the staff will notify the state of a NSHC determination at "j

the same time it sends a copy of the notice to the Federal Register for t-publication.

This places an unnecessary administrative burden on the staff.

Wording which is more appropriate and follows the present practice

/

would be "The Comission will advise the State of its proposed determina-tion about'no significant hazards considerations normally by sending it a copy of the FEDERAL REGISTER notice."

b.

In Paragraph 50.91(b)(3) on page 92 of the proposed final Sholly regulations),

the sentence ";nonetheless, to ensure that the State is aware of the

/

application, before it issues the amendment, it will telephone that official" should be modified.

The call serves no purpose for amendments

E 9

d

-34 which have been noticed for 30 days and no request for a hearing has been received and a copy of the amendment has been sent to the state per the regulations. However, for amendments noticed less than 30 days or for which i hearing is requested, the state telephone call should be made.

5.

Use of Local Wedia Experience to date indicates essentially no advantage in using local media over the Federal Register Notice. References to sing,the loc,al media should be eliminated from the regulation.

Jp f e iour 6.

Implementation

,p The law requires a reasonable period for public comment on a pro amendment involving no significant hazards considerations (NSHC) posed In the present implementation of this requirement. the amendment is described in far too much detail in the initial Federal Register Notice (FRN).

If for any reason during the review the licensee modifies their submittal, a second FRN with its NSHC is required, in fact several amendments have even required a third FRN.

This multiple issuance of FRNs on the same subject places an administrative burden on the staff.

To circumvent the situation, many project managers are waiting until the review of an amendment request is almost complete before issuing the initial FRN with its NSHC.

This reduces the administrative burden on the staff and satisfies the letter of the law but it does not notify the public that a review is in progress until well after the review is underway.

The law simply requires a reasonable coment period for proposed amendments involving NSHC.

We ire adding an administrative burden on ourselves if we very narrowly define a proposed amendment to be only the licensee submittals listed in the FRN.

The original FRN should state that the NRC is reviewing a licensee submittal of a given date on a given topic and some changes may be necessary as a result of our review but the submittals received involve no significant hazards considerations based on the three criteria in the regulations.

The public could be invited to provide corrunents or request a hearing based on the topic of the amendment request.

Providing modifications made during the review do not change the NSHC determination, no other FRNs would be necessary until the amendment was issued.

Any requests fnr a hearing would then utilize detailed information in the actual amendment to provide a basis for their contentions.

This procedure would meet the requirements of the law and reduce the adminis-trative burden on the staf f.

If you argue that a NSHC must be made on a detailed basis for a specific amendment request and not on the topic of the amendment in gen ~eral, then NSHC must be considered merit oriented and can only -

be done after a detailed review.

=

.a

(

e, e

-4 7.

Paragraph 50.91(a)(4) on pa 89 has been modified from the interim rule to imply that an'auenun=nt invo ving a significant hazards consideration can g(K) be issued before a hearing if emergency action is warranted.

The wording should be changdd to reflect the proper course of action for significant hazards consider'ations.

Specifically the wording "if emergency action is not warranted" sh'ould be removed from the last sentence.,

I C[

Y

==

a stM T)%:

J f n y m-r' y x N ^ U,N t^ ~ l~

m.,.,,

ma ktn W y E

  • A Y

,M[p

~

p (Va, :to f f tk.

e I

i

fk f~h hDk 6 Ch.

  • f UNITED STATES

+

NUCLEAR REGULATORY COMMISSION g

g t

j WASHINGTON, D. C. 205$5

\\...../

/

NOTE T0f]1111(0 Ee~id.50EL5f ??

L j

FROM:

G. Lainas, Assistant Director

[

for Operating Reactors, DL t

I

SUBJECT:

MEETING WITH E. CASE - SHOLLY

~ Consistent with our discussion on Tuesday, I have arranged a meeting with Ed Case for Friday at 2:30 pm, subject: Sholly connents.

Enclosed is a draft to be discussed at the meeting.

/ us Lainas, Assistant Director

/

for Operating Reactors, DL

Enclosure:

As stated cc w/ enclosure:

1 E. Case i

D. Eisenhut i

i DP

= coy \\,

4

.-g.

,4 UNITED STATES -

3 y}

g NUCLEAR REGULATORY COMMISSION tj WASHINGTON, D. C. 20555

\\...../

MEMORANDUM FOR:

Guy H. Cunningham, Executive Legal Direct'or FROM:

Horold'R. Den' ton, Director

.u Office of Nuclear Reactor Regulation

SUBJECT:

COMMENTS'0N PROPOSED FINAL SH0LLY RULE ON SIGNIFICANT HAZARDS CONSIDERATIONS Comments concerning your November 30, 1983 version of the proposed final regulations are contained in the enclosure. The impact of the interim Sholly regulations, particularly with the results achieved to date, should be brought to the ettention of the Commissioners when they are considering the final Sholly regulations.

Harold R. Denton,- Director Office of Nuclear Reactor Regulation

Enclosure:

As stated

Contact:

J. Thoma, NRR 49-27356 ed e

F y,

N y#

i

- o i

't ENCLOSURE 4

1.

IMPACT -

- The interim Sholly regulations and the proposed final Sholly. regulations require a.significant amount of effort to implement. The attached memorandum

  • from Dominic C. Dilanni provides an estimate of the costs of implementing the present interim Sholly regulations. He estimates an-annual cost:of 18.6 professional staff years and a publication cost of $187,800 for~ pre-noticing amendment requests having no significant hazards considerations.

' As of August 22, 1984, the results of this activity are as follows: a total of 1440 Sholly notices have been issued.

Public comments have been received thirteen times (inv01ving five amendment requests) and sixteen requests for hearings have been received (involving nine amendment requests). Six amend- -

ments have been issued utilizing the innediate effectiveness provisions of the regulation in that a hearing was requested and a final no significant hazards consideration was made. This data indicates that less than 1% of this effort to involve the public actually resulted in public participation.

One could reasonably question whether or not Congress intended this amount or resource expenditure to implement the Sholly regulations, particularly with.

the results achieved to date. This impact should be brought to the attention of the Commissioners' when considering the final Sholly regulations.

2.

Definition of Emergency Either expand the definition of an emergency in the regulation or provide for an extremely short public notification period (much less than the two weeks presently in the regulations) for selected " exigent circumstances" to minimize the total impact of a purely administrative delay. The proposed final rule states that all circumstances classified as " exigencies" allow a minimum of a two week public comment period. However, there are practical situations involving no significant hazards considerations which might otherwise be considered an exigency but which must be acted upon with the same urgency as an emergency situation.

These circumstances include amendments involving no significant hazards considerations which if not issued promptly would extend a shutdown, extend a derating condition, or would require a shutdown plant to

- take certain actions which are impractical under the specific plant conditions.

The preferred solution is to expand the definition of an emergency situation to include these situations.

It has been the staff policy since August 17, 1983 to include events involving NSHC which extend a shutdown under the definition of an~ emergency..;

  • With respect to the Dilanni proposal to eliminate noticing, this was responded to by OELD memorandum (Dorian to Lainas dated August 20,1984) which indicated that this noticing procedure was required by public law.

4 u

o i

d Severa's public comments were received on this same subject.

In response to these public comments, page 49 of the proposed final Sholly regulations states that nothing in legis.lative history indicates that the Commission.should take other factors into consideration such as shutdown plants, higher levels of power generation, or economic injury when considering an emergency situation. We disagree with this statenent. The present' definition of an emergency situation is one in which immediate action is necessary to prevent the shutdown or derating of an operating plant.

Preventing shutdown and preventing derating is very strongly connected with economic injury, allowing higher levels of power generation, and allowing start-up.

Therefore, expanding the definition of an " emergency situation" to include these circumstances is consistent with the law and legislative history.

3.

Definition of Significant A definition of "significant" would be useful in the Sholly regulations.

For example, "significant reduction in margins" used in the criteria for determining significant hazards considerations, does this mean a reduction in mai;in between a code allowable value and an actual safety limit, or any reduction at all.

One could reasonably argue that any change which results in a value still contained within code allowable values (or SRP values) is not "signifi-cant" and changes in this area simply allow for design flexibility. We realize the problem with formal definitions in that they restrict interpretation of the regulations, but some help in this area is needed.

Perhaps instead of a formal definition, an example of a NSHC could be provided which involves a reduction in safety margins.

In addition, we and the Commission have been having some difficulty interpreting the criteria for making determinations on significant hazards. The Commission had indicated other kinds of examples such as how extensive is the review effort which might be considered in making these determinations.

Currently, we have no good proposal to make to add to the standards.

4.

State Consultation a.

Paragraph 50.91(b)(2) on page 91 of the proposed final Sholly regulations states that the staff will notify the state of a NSHC detennination at the same time it sends a copy of the notice to the Federal Register for publication.

This places an unnecessary administrative burden on the staff. Wording which is more appropriate and follows the present practice would be "The Commission will advise the State of its proposed determina-tion about'no significant hazards considerations normally by sending it a copy of the FEDERAL REGISTER notice."

b.

In Paragraph 50.91(b)(3) on page 92 of the proposed final Sholly regulations),

the sentence ";nonetheless, to ensure that the State is aware of the application, before it issues the amendment, it will telephone that official" should be modified. The call serves no purpose for amendments

o i

t 1

~

which have been noticed for 30 days and no request for a hearing has been received and a copy of the amendment has been sent to the state per the regulations. However, for amendments noticed less than 30 days or for which a' hearing is requested, the state telephone call should be made.

5.

Use of Local Media 2-Experience to date indicates essentially no advantage in using local media over the Federal Register Notice.

References to using the local media should be eliminated from the regulation.

6.

Implementation The law requires a reasonable period for public comment on a proposed amendment involving no significant hazards considerations (NSHC).

In the present implementation of this requirement the amendment is described in far too much detail in the initial Federal Register Notice (FRN).

If for any reason during the review the licensee modifies their submittal, a second FRN with its NSHC is required.

In fact several amendments have even required a third FRN.

This multiple issuance of FRNs on the same subject places an administrative burden on the staff.

To circumvent the situation, many project managers are waiting until the review of an amendment request is almost complete before issuing the initial FRN with its NSHC. This reduces the administrative burden on the staff and satisfies the letter of the law but it does not notify the public that a review is in progress until well after the review is underway.

The law simply requires a reasonable comment period for proposed amendments involving NSHC.

We are adding an administrative burden on ourselves if we very narrowly define a proposed amendment to be only the licensee submittals listed in the FRN. The original FRN should state that the NRC is reviewing a license ~e submittal of a given date on a given topic and some changes may be necessary as a result of our review but the submittals received involve no significant hazards considerations based on the three criteria in the regulations. The public could be invited to provide comments or request a hearing based on the topic of the amendment request.

Providing modifications made during the review do not change the NSHC determination, no other FRNs would be necessary until the amendment was issued.

Any requests for a hearing would then utilize detailed information in the actual amendment to provide a basis for their contentions.

This procedure would meet the requirements of the law and reduce the adminis-trative burden on the staff.

If you argue that a NSHC must be made on a detailed basis for a specific amendment request and not on the topic of the amendment in general, then NSHC must be considered merit oriented and can only -

be done after a detailed' review.

m

t

-a.

7.

Paragraph 50.91(a)(4) on page 89 has been modified from the interim rule to imply that an amendment involving a significant hazards consideration can be issued before a hearing if emergency action is warranted.

The wording should be changdd to reflect the proper course of action for significant hazards considerations. Specifically 'the wording "if emergency action is not warranted" should be removed'from the last sentence.

m FM D

h a

..-n

--e,

MU4 Poz h:

ENVIRONMENTAL CONSIDERATIONS REGARDING THE LICENSING OF

\\

RESEARCH REACTORS AND CRITICAL FACILITIES Introduction

.4 This' discussion deals with research reactors and critical facilities which are designed to operate at low power levels, 2 MWt and lower, and are-used primarily for basic research in neutron physics, neutron radiography, isotope production, experiments associated with nuclear engineering, training and as a part of a nuclear physics curriculum.

Operation of such facilities will generally not exceed a 5-day week, 8-hour day, or about 2000 f ours per year.

Such reactors are located adjacent to technical service support facilities with convenient access for students and faculty.

Sited most frequently on the campuses of large universities, the reactors are usually housed in already existing structures, appropriately modified, or placed in new buildings that are designed and constructed to blend in with existing facilities. However, the environmental considerations discussed herein are not limited to those which are part of universities.

... - ~-

Facility There are no exterior conduits, pipelines, electrjcal or mechanical structures or transmission lines attached to or adjacent to the facility other than for utility services, which are similar to those required in other similar facilities, specifically laboratories. Heat dissipation is generally accom-plished by use of a cooling tower located on the roof of the building. These cooling towers typically are on the order of 10' x 10' x 10' and are comparable to cooling towers associated with the air-conditioning systems of large office.

buildings.

Make-up for the cooling system is readily available and usually obtained from the local water supply.

Radioactive gaseous effluents are limited to Ar-41 and the release of radioactive liquid effluents can be carefully nonitored and controlled. Liquid wastes are collected in storage tanks to allow for decay and monitoring prior to dilution and release to the sani-tary sewer system. Solid radioactive wastes are packaged and shipped off-site for storage at NRC-approved sites. The transportation of such waste is done in accordance with existing NRC-00T regulations in approved shipping containers.

Chemical and sanitary waste systems are similar to those existino at other similar laboratories and buildings.

i s

4 J._

f Environmental Effects of Site Preparation and Facility Construction 4

Construction of such facilities invariab1y occurs in areas that have already been disturbed by other building construction and, in some cases, solely within an already existing building. Therefore, construction would not be erpected to have any significant effect on the terrain, vegetation, wildlife or nearby waters or aquatic life. The societal, economic and esthetic impactsA of construction would be no greater than those associated with the construction

  • of a large office building or similar research facility.

Environmental Effects of Facility Operation Release of thermal effluents from a reactor of less that 2 MWt will not have a significant effect on the environment. This small amcunt of waste heat is.

generally rejected to the atmosphere by means of small cooling towers.

Ex-tensive drift and/or fog will not occur at this low power level.

~

~

Release of routine gaseous effluents can be limited to Ar-41, which is generated by neutron activation of air.

Even this will be kept as low as practicable by using gases other than air for supporting experiments.

Yearly doses to unre-stricted areas will be at or below established guidelines in 10 CFR 20 limits.

Routine rgeJeases of-radioactive liquid effluents can be carefully monitored and controlled in a manner that will ensure compliance with current standards. Solid t

radioactive wastes will be shipped to an authorized disposal site in approved containers. These wastes should not require more than a few shipping containers a year.

Based on experience with other research reactors, specifically TRIGA reactors operating in the 1 to 2 MWt range, the annual release of gaseous and liquid effluents to unrestricted areas should be less than 30 curies and 0.01 curies, respectively.

No release of potentially harmful chemical substances will occur during normal operation. Small. amounts of chemicals and/or high-solid content w'ater may be released from the facility through the sanitary sewer during periodic blowdovn of the cooling tower or from laboratory experiments.

Other potential effects of the facility, such as esthetics, noise, societal or impact on local flora and fauna are expected to be too small to measure.

Environmental Effects of Accidents Accidents ranging from the failure of experiments up to the largest core damage and fission product release considered possible result in doses that are less than 10 CFR Part 20 guidelines and are considered negligible with respect to the environment.

~

J

i 9,

~ -

Unavoidable Effects of Facility Construction and Operation The unavoidable effects of construction and operation involve the materials used in construction that cannot be recovered and the fissionable material used in the reactor.

No adverse impact on the environment is expected from, r

either of these unavoidable effects.

f) r Alternatives to Construction and Operation of the Facility To accomplish the objectives associated with research reactors, there are no suitable alternatives. Some of these objectives are training of students in the operation of reactors, production of radioisotopes, and use of neutron and gamma ray beams to conduct experimerc s.

Long-Term Effects of Facility Construction and Operation The long-term effects of research facilities are considered to be beneficial as a result of the contribution to scientific knowledge and training. Because of the relatively small amount of capital resources involved and the small impact on the environment, very little irreversible and irretrievable commit-ment is_a,ssocjated with such facilities.

Costs and Benefits of Facility Alternatives i

The costs are on the order of several millions of. dollars with very little environmental impact.

The benefits include, but are not limit:1 to, some combination of the following: conduct of activation analyses, conduct of neutron radiography, training of operating personnel and education of students.

Some of these activities could be conducted using particle accelerators or radioactive sources which would be more costly and less efficient. There is no reasonable alternative to a nuclear research reactor for conducting this spectrum of activites.

Conclusion The staff concludes ~that there will be no significant environmental impact associated with the licensing of research reactors or critical facilities designed to operate at power levels of 2 MWt or lower and that no environmental impact statements are required to be written for. the issuance of construction permits or operating licenses for such facilities.