ML20151L310
Text
,-
MU4 PDR
'o UNITED STATES yn g
8 NUCLEAR REGULATORY COMMISSION (U
o 5
( E WASHINGTON, D. C. 20555
\\,*****/
Novenber 19, 1985 MEMORANDUM FOR:
Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM:
Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation
SUBJECT:
"SH0LLY" STATISTICS Enclosed is the update of the Sholly statistics covering the period ending October 31, 1985.
On October 18, the Commission declined review of the ASLAB's decision on Mr. John F. Doherty's request for hearing on the proposed amendment to the Pilgrim license. Therefore the decision became final agency action on October 15, 1985.
No later than December 6,1985, the statistics will be updated for the period ending November 30, 1985.
v w/
H L. Thomps r,
irector D v sion of Licensi 0 ice of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
NRR Division Directors NRR Deputy Directors DL Assistant Directors DL Branch Chiefs DL Licensing Assistants T. Dorjanf0EEDN Lars Solander, PRAB ONTACT:
Pat Kreutzer X29516
/
j
?Trw30066 xt 3PP
"SHOLLY" STATISTICS May 6, 1983 through Bi-weekly FRN Individual FRN Individual FRN October 31, 1985 Proposed NSHC Proposed NSHC SHC Totals 1st FY 86 Total 1st FY 86 Total 1st FY 86 Total 1st FY 86 Total PERIOD COVERED Oct.
Qtr.
to to Oct.
Qtr.
to to Oct.
Qtr.
to to Oct.
Qtr.
to to 1985 FY 86 date date 1985 FY 86 date date 1985 FY 86 date date 1985 FY 86 date date Comment period:
30 days 80 80 80 2235 9
9 9
258 3
3 3
39 92 92 92 2532 Less than 30 days:
y p
Short FRN 0
0 0
22 0
0 0
22 Press release
/
\\
]>
<{
/
\\
0 0
0 9
Public consnents (12 FRN 2 PR) received 0
1 0 0
1 0
0 0
11 0
0 0
0 0
0 0
j fit FRN Requests for F
162))
j oo hearing 0
0 0
4 0
0 0
9 0
0 0
3 0
0 0
4 Amendments issued - Total 68 68 68 1715 (1) With 30 days notice ------------------ ------------------------------------------------
68 68 68 1622 i
(2) Less than 30 days or NO NOTICE --------------------------------------------------------
0 0
0 82 (3) Hearing requested but final NSHC determination made (50.91(a)(4) ----------------------
0 0
0 10 (4) Proposed N'SHC; hearing requested. Hearing completed and amendment issued.
N0 final NSHC determination made because hearing was completed before 0
0 0
1 amendment was needed ----------------------------------------------------------------
Backlog:
(applications received which have not been noticed, either in bi-weekly FRN or individually through or tnhor 'll ; 14Rr; ):
ppg (Includes items which have been prepared and approved for publication in the next bi-weekly, items which are in concurrence, and items for which additional information is needed from licensee.
FOOTNOTES: See page 2 i'f an item included above is footnoted.
Footnotes will be provided only when information is new or changed.
1
-=
FOOTNOTES FOR "SH0LLY" STATISTICS 1/ Connents 2 comments, one from State, one from a member of the public.
Grand Gulf 7 comments received as result of initial noticing action, TMI-1 1 additional comment received as a result of Notice of Additional Opportunity published on August 25, 1983.
1 comment received from a member of the public.
Susquehanna Oyster Creek I comment received from State.
I comment received from a member of the public.
WNP-2 LaSalle 2 I comment received from local government.
2/ Requests for hearing TMI Steam generator repair - 2 requests for hearing received. Prehearing conference held. By a Memorandum and Order dated June 1,1984, Board dismissed 9 of 11 contentions. Hearing concluded July 18, 1984.
Staff's proposed findings submitted August 20, 1984. Board issued Decision on October 31, 1984.
Salem Integrated leak rato - 1 request for hearing received from State of Delaware. On January 20, 1984, State filed a motion to withdraw which was granted by Board on January 25, 1984.
Turkey Pt. 3/4 - (a) Proposed operational limits for current and future reloads - 2 requests for hearing (2 units). Prehearing conference held
- February 28, 1984. A second preliminary conference was held on March 26, 1985. Discovery in process. Hearing date has been established for December 10, 1985 and will be conducted continuously day to day until all evidence on the contention has been received.
(b) Spent Fuel Storage Expansion - 2 requests for hearing (2 units).
(c) Enriched fuel storage - 2 requests for hearing (2 units). The Board has ruled that 7 of the 10 contentions are admissible for the Spent Fuel Storage Hearing and one of the four contentions for the Enriched Fuel Hearing is admissible.
The Hearings are being scheduled. They will likely be held in the March or April 1986 time frame. Center for Nuclear Responsibility Inc. and Joette Lorf an petitioners in all three issues.
Pilgrim - Single loop operation - 1 request for hearing. Proceeding dismissed January 26, 1984 based on settlement.
Grand Gulf - Amendment No.10 redefined HPCS operation and resulted in a calculated increase in peak clad temperature. One hearing request received. Prehearing conference held February 29, 1984. ASLB issued decision on April 23, 1984 admitting two contentions for discovery. On September 24, 1984, ASLB issued Memorandum and Order Terminating Proceeding.
A
/
' Trojan - Spent fuel pool expansion - 2 requests for hearing, I from State and 1 from Coalition for Safe Power. Both admitted as parties to proceeding. Prehearing conference held, two contentions accepted.
Coalition withdrew from proceeding. Hearing held October 10, 1984.
Initial Decision issued by Board on November 28, 1984.
Zion 1/2 - Containment leak testing - 2 requests for hearing (2 units) from Citizens Against Nuclear Power. Licensee subsequently withdrew application.
Pilgrim - raise the K limit of the fuel storage pool from 0.90 to 0.95 for normal 6bbditions - 1 request for hearing from John F. Doherty on June 29, 1985. ASLB issued Memorandum and Order or. July 19, 1985 dismissing request (untimely filing with no good cause shown for late filing; no valid ground for intervention stated). Mr. Doherty filed an exception to the dismissal on July 27, 1985. ASLAP Order dated July 31, 1985 extended date for appeal to August 14, 1985.
On August 13, 1985, Mr'. Doherty filed a notice of appeal with supporting brief contending that " dismissal of the petition based on the lack of timeliness without an opportunity of reply was a procedural error requiring a remedy." On September 5, 1985, the ASLAB affinned the ASLB denial of Mr. Doherty's request. The Comission declined review of the ASLAB decision; the ASLAB decision became final on October 15, 1985.
3]
Amendments Issued, Item (3)
TMI-1 hot testing, I amendment Salem 1 integrated leak testing,1 amendment Turkey Pt. 3/4 operational limits for current / future reloads, 2 amendments TMI-1 hot functional testing of SG, 1 amendment Trojan spent fuel pool,1 amendment Turkey Pt. 3/4 SFP storage expansion, 4 amendments Grand Gulf peak clad temperature,1 amendment 4j Amendments Issued, Item (4)
TMI-1 steam generator tube repairs and return to operation, 1 amendment.
Pursuant to the initial Decision of the Atomic Safety and Licensing Board dated October 31, 1984, the Comission completed action on GPU's May 9,1983 application by the issuance of an amendment to the license permitting the return of the steam generators to operation. The hearing having been completed, the matter of a Final Determination of No Significant Hazards Consideration related to this amendment was considered moot and no such detennination was required or made.
fDk fjl
,#prerg[*g o
UNITED STATES NUCLEAR REGULATORY COMMISSION o
waswmcTow. o. c. 20sss s
E g
\\,...../
October 22, 1985 MEMORANDUM FOR:
Harold R. Denton, Director Office of Nuclear Reactor Regulation i
Hugh L. Thompson, Jr., Director FROM:
Division of Licensing Office,of Nuclear Reactor Regulation "SHOLLY" STATISTICS
SUBJECT:
Enclosed is the update of the Sholly statistics covering the period I
ending September 30, 1985.
Regarding the hearing requests received on the proposed amendment to the Turkey Point licenses on operational limits for current and future reloads, 10, 1985 and will be a hearing date has been established for December conducted continuously day to day until all evidence on the contention has Also, regarding the Turkey Point enriched fuel storage been received.
proposed amendment, the Board has ruled that 7 out of the for the Enriched Fuel Hearing is admi:sible. The hearings are being scheduled and will likely be held in the MarA Lor Aoril 1986 time frame..
1 (r.
g The ASLAB affinned the ASLB denial of Mr. John F. Doherty's request for r g e hearing on the proposed amendment to the Pilgrim license, which would raise f 4.p %dhns.mit of the fuel storage pool from 0.90 to 0.9
.\\h the K li l f rg No later than November 7,1985 the statistics will be updated for the period ending October 31, 1985.
0 Hugh L.
ps
, Jr., Director 1
4 v
Division of Licensing Off. ice of Nuclear Reactor Regulation
Enclosure:
I As stated cc w/ enclosure:
NRR Division Directors i
NRR Deputy Directors DL Assistant Directors DL Branch Chiefs DL Licensing Assistants OELD Lars~Solander, PRAB CONTACT:
I Pat Kreutzer X29516 i
4 2 MOO W,
..._-.-._-_?..-..--.-.-_..-._..--_---,._.-,-_.
_