Forwards Insp Rept 50-344/88-36 on 880808-12 & Notice of Deviation.Assessment of Concerns Re Upgrading Instrumentation to Seismic Class I Stds & Actions for Number of Temp Indications for Rcs,Per Reg Guide 1.97,requested
ML20154P628
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/16/1988
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20154P632 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8810030124
Download: ML20154P628 (3)


See also: IR 05000344/1988036

Text

, _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ - _ _

.

.

hh

SEP 16 tasa

Docket No. 50-344

Portland General Electric Company

121 S. W. Salmon Street

Portland, Oregon 97204

Attention: Mr. D. W. Cockfield

Vice President, Nuclear

Gentlemen:

Subject: NRC Inspection of the Trojan Nuclear Plant

This letter refers to the inspection conducted by Mr. J. F. Helft of this

office, and A. C. Udy, NRC Contractor, on August 8 throuch August 12, 1988, of

activities authorized by NRC License No. NPF-1 and to the discussion of our

findings held with Mr. Olmstead, and other marbers of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

repcrt. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities deviated from a comitrent made to the NRC, as set forth in the

Notice of Deviation, enclosed herewith as Appendix A. Please respond to this

notice as requested in the Appendix.

The commitment in the notice regarded upgrading the Condensate Storage Tank

Level instrumentation to Seismic Class I standards during the 1986 refueling

outage. As discussed during the exit interview, we are concerned with the

effectiveness of your program established to assure complete followup of

comitaents and open items. We understand that you are in the process of

assessing this situation, as well as the adequacy of your LER reporting

systems. Therefore, we request that you include in your response to the

Notice of Deviation your assessments of these concerns.

Additionally, as discussed in paragraph 5.B of the enclosed report, cur

inspectors identified that under some circumstances, the nurrber of the

temperature indications for the reactor coolant system loops and the number

of level indications for the steam generators, could be less than the number

required by Regulatory Guide 1.97. In your response, please identify what

actions you plan to address this concern.

In accordance with 10 CFR 2.790 (a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room.

\ \

-- t

8810030124 880916

PDR '

G ADOCK 05000344

PNU

- _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -___-__ -

.

,.

. SEP 161933

.g.

The responses requested by this letter and the accompanying notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980 PL 96-511.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

'

hfl()f()A $l()(WY

Dennis F. Kirsch, Director

Division of Reactor Safety

and Projects

Enclosures:

1. Notice of Deviation, Appendix A

2. Inspection Report No. 50-344/88-36

cc w/ enclosures (1) and (2):

C. A. Olmstead, PGE

L. A. Girard, PGE

W. Dixon, DOE

bec w/ enclosures: '

Project Inspector

Resident Inspector

Docket file

G. Cook

B. Faulkenberry

J. Martin

T. Foley, NRR

J. Joyce, $1CB, NRR

bec w/ enclosure 1 only:

LFM8

M. Smith

REGION V/jg

f<r 'I ^< N'

JFMelft SARI ards -7)Pte

R AEJohnson MMendonca

09//5/88 ff 4 09/lk/88 09/K/88 09/ /88 9//p88

ST COPY ]

REQUEST

YfS/ / NO COPY ] YfS] /RJKEST / NO COPY ] ,NO

1/YES !/ REQUEST

] YESCOPY

/ NO ] REQUEST

]/YES COPY] ) Jty/ NO

DFK h Cb (4

09/(7V88 9fy M

[ EST COPY)/51 TO POR 3

YES / NO ] Yts / NO ]

j

- ___________ _ __ _

'

l

l

l

SEP 161989

? *

Enclosures:

1. Notice of Deviation, Appendix A

2. Inspection Report No. 50-344/88-36

ccw/ enclosures (1)and(2)

C. M. Olmstead. PGE

J. W. Durham, PGE

W. Dixon. DOE

bec w/ enclosures

Project Inspector

Resident Inspector

docket file

G. Cook

B. Faulkenberry

J. Martin

T. Foley, NRR

J. Joyce, SICB, hRR

bec w/o enclosure:

LFMB

M. Smith

REGION Y

JFNelfi SARichards RJPate M enson Wendoca

09/4/E8 09/ /B8 09/ /88 09/' /88 09/ /88

ser

5T COP),. REQUEST COPY,l REQUEST COPYJ REQUEST (9PT, REQUEST COPY,

IE / NO lYES / NO lYES / NO ] YES / /X01 YES / NO J

V

DFKirsch

09/ /88

YESREQUEST COPY,1

/ NOSEhD TO PDR ,

.

/ NO l YES i

.

.

.