E
a'
6
Gk:
s.
.
J
-
- -
'
.'
SEP ! 6 1933
.
.
Docket Nos.:
50-327 and 50-328
License Nos.:
OPR-77 and DPR-79
Mr. S. A. White
Senior Vice President, Nuclear Power
Tennessee Valley Authority
6N 38A Lookout Place
1101 Market Square
Chattanooga, TN 37402-2801
Dear Mr. White:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-327/88-36 AND 50-328/88-36)
This refers to the routine Nuclear Regulatory Commission (NRC) resident
inspection conducted by P. Harmon on July 12 - August 5,1988.
At the con-
clusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements. The violation identified involves the failure to adequately
test certain containment isolation valves in the containment spray system per
the requirements of 10 CFR 50 Appendix J.
The violation, references to
pertinent requirements, and elements to be included in your response are
described in the enclosed Notice of Violation.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2 Title
10 Code of Federal Regulations, a copy of this letter, its enclosures, and any
reply will be placed in the NRC's Public Document Room.
The responses directed by this letter and its enclosures are not subjected to
the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
g92ph
p
a
o
'LE e/
_ _ _ _ _ _ _ _ _ _ _ _ _ _
..
.
,,
.
,
SEP 161958
-
.
.
, Tennessee Valley Authority
2
-
Should you have any questions concerning this letter, please contact us.
Sincerely,
omGINAL UcNto af
FRANK R. McC0Y
Frank R. McCoy, Assistant Director
for TVA Inspection Programs
TVA Projects Division
,
l
Office of Special Projects
Enclosures:
1.
2.
NRC Inspection Report
cc w/encis:
J. A. Kirkebo, Vice President,
Nuclear Engineering
i
J. L. LaPoint, Acting Site Director
Sequoyah Nuclea r Plant
R. L. Gridley, D: rector
!
Nuclear Safety and Licensing
M. J. Ray, Acting Site Licensing
Manager
TVA Representative, Rockville
Office
General Counsel, TVA
State of Tennessee
bec w/encis:
J. G. Partlow, OSP
5. D. Richardson, OSP
"
S. C. Black, OSP
8. D. Liaw, OSP
K. P. Barr, OSP/RII
J. B. Brady OSP/RII
J. Rutberg, OGC
'
NRC Resident Inspector
ORS Technical Assistant
,
NRC Document Control Desk
!
!
L
OsP/RII
OSP/RII
OSP/RII
!
Kb
rady
Kt-
M
9//f/83
9/t6/83
0
-
>
f
\\