Documents Info Discussed in Recent Telcons Re Licensee 961106 Proposed Amend to Ts,Modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Sv
ML20154M020
Person / Time
Site: North Anna  
Issue date: 10/16/1998
From: Ohanlon J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
98-569, NUDOCS 9810200141
Download: ML20154M020 (4)


Text

_

Vuu;isir Eu:criuC ANI) POWi:R CO%il'ANY Racintoso, Vnuaisia 232<,i October 16, 1998 U. S. Nuclear Regulatory Commission Serial No.98-569 Attention: Document Control Desk NL&OS/ETSRO Washington, D.C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGE REVISED LOOP STOP VALVE OPERATION REQUEST FOR ADDITIONAL INFORMATION On November 6,1996, Virginia Electric and Power Company (Serial No.96-532) requested amendments, in the form of changes to the Technical Specifications, to Facility Operating License Numbers NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively. The proposed changes will modify the requirements for isolated loop startup to permit filling of a drained isolated loop via backfill from the Reactor Coolant System through partially opened loop stop valves.

In subsequent telephone conference calls with the NRC Staff, the implementation and basis of the proposed Technical Specifications change have been discussed. The revelant information discussed during those phone conversations is documented in the attachment to this letter.

ll Should you have any questions or require additional information, please contact us.

k Very truly yours, O

ACO James P. O'Hanlon Senior Vice President - Nuclear Attachment

-, g ;

Commitments made in this letter:

1.

None 9810200141 981016 PDR ADOCK 05000338 P

PDR g

['

p United S'tates Nuclear Regulatory Commission cc:

i Region 11 l

Atlanta Federal Center

,,61 Forsyth Street, SW l

Suite 23T85 l

Atlanta, Georgia 30303 M- 04. J. Morgan NRC Senior Resident inspector North Anna Power Station j.

Commissioner Department of Radiological Health Room 104A 1500 East Main Street j

Richmond, VA 23219 l

l l

l' i

?

i

Response to Request for Additional Information Revised Loop Stop Valve Operation North Anna Power Station, Units 1 and 2 (TAC Nos. M97187 and M97188)

NRC Concern:

Proposed TS 3.4.1.6 requires 450 ft of water in the pressurizer when filling the loop from the RCS volume. Discuss the safety-related level instruments that will be used during a loop backfill evolution. What is the instrument uncertainty associated with pressurizer level measurement and was it included in the determination of the 450 ft limit?

In addition, what are the effects of temperature / pressure on the level measurement.

Virginia Power Response:

During the backfill evolution, Virginia Power intends to use safety-related instrumentation to verify the Technical Specifications required volume of water in the pressurizer (450 ft ) prior to and during reactor coolant loop backfill evolutions. These instruments have a Channel Statistical Allowance (loop error) calculated for each instrument channel.

The instruments are calibrated on an eighteen-month basis consistent with Technical Specifications requirements.

Virginia Power quantified the conservatism associated with assuming that all three loops were unisolated simultaneously when the proposed 450 ft specification was developed. This conservatism was calculated as follows:

For the loops not under a vacuum:

1.

The volume on the steam generator side of the loop stop va;ves below mid-loop was calculated. This volume was multiplied by two to obtain the volume that would drain into the two loops assuming those two sets of loop stop valves are opened simultaneously. This volume is identified as Va 2.

The RCS loop piping water volume on the reactor vessel side of the loop stop valves above mid-loop elevation was calculated.

The volume was again mu;tiplied by two to account for two loops. This volume is available for filling drained loop volumes in the two loops and is identified as Voyon.

3.

The difference in these two volumes is the additional RCS volume that is needed to fill these two loops to the mid-loop elevation.

The additional volume or margin was calculated to be 340.4 ft.

Since the Specification bases prohibit opening more than one loop at a time, this represents margin or conservatism in the volume requirements.

Page 1 of 2

^.

The safe'ty-related level instrument channels for pressurizer level channels (loops) have a hot calibrated level indication error of 7.94% full span, which corresponds to about 106 ft. This error is dominated by the high-line-pressure error component of the

transmitter (approximately 5.7%).

Conservatively, the volume associated with instrument indication error of 7.94% is approximately 106 ft (full span).

This error is equal to approximately 30% of the additional margin (340.4 ft ) provided in the press'urizer to ensure decay heat removal is not affected.

Eliminating the high-line-pressure error _ component from the total error at cold conditions (when the loop fill evoluti-on will be performed) yields an l

error of approximately 3.5%.

This equates to about 47 ft' or approximately 14% of the additional margin (340.4 ft ) provided in'the pressurizer to ensure decay heat removal is not affected.

Therefore, the instrument error is adequately accounted for in the 340 ft of additional volume or margin.

In addition, a non-safety related level channel that has been specifically calibrated for cold conditions in the pressurizer will be available to monitored pressurizer level during 1

the backfill evolutions. Although a specific Channel Statistical Allowance has not been performed for this instrument loop, the typical indication errors for instrument loops of this type are on the order of 3.5% level span, which corresponds to a pressurizer water volume of about 40 cubic feet.

l l

l l

Page 2 of 2

-