Forwards Safety Evaluation & Science Applications Intl Co Technical Evaluation Rept Re Dcrdr.Requests Supplemental Info to Complete Review of Licensee Dcrdr Summary Rept by 860401
ML20154J291
Person / Time
Site: Oyster Creek
Issue date: 02/27/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20151K902 List:
References
RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, GL-82-337, TAC-56147, NUDOCS 8603100553
Download: ML20154J291 (4)


Text

.. . - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ . . . _ _ - - - _ - _ _ . .. _ _ _ _ _ _ _ . .___ ____ __ _ _ - _ _ _ - _ _ _ - _ _ _ _

..p .. -- - .

Ao umrao STATES *

,' .[ g NUCLEAR REGULATORY COMMISSION 3 = WASHINGTON, D. C. 20088

\.....)

February 27, 1986 i

4

~

Docket No. 50-219 i

Mr. P. B. Fiedler Vice President and Director

  • Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731

Dear Mr. Fiedler:

SUBJECT:

DETAILEDCONTROLROOMDESIGNREVIEW(TAC 56147) l Re: Oyster Creek Nuclear Generating Station  ;

GPU' Nuclear (GPUN) Corporation is required by Supplement 1 to NUREG-0737, p Generic Letter 82-33 dated December 17, 1982, to conduct a Detailed Control

Room Design Review (DCRDR) for the Oyster Creek Nuclear Generating Station.

The staff has previously reviewed the GPUN Program Plan for the DCRDR and l conducted an pre-implementation audit on November 1, 2 and 28, 1984. Final i evaluation of the DCRDR will be completed after receipt of supplemental '.

information needed by the staff to complete its review of the licensee's DCRDR Summary Report. This information is requested by April 1, 1986.

f' Results of the NRC evaluation thus far indicate that GPUN is pursuing a course of review which should satisfy the requirements of NUREG-0737,

~

f Supplement 1, if the remaining DCRDR activities and documentation are completed.

The enclosed Safety Evaluation (SE), with the attached Science Applications i

International Corporation (SAIC) Technical Evaluation Report (TER),

l' presents the results of the staff review of your DCRDR Sumary Report and  ;

its Supplement dated April 30, 1984, and April 5, 1985, respectively. The t

staff agrees with the technical content and conclusions of the SAIC TER t l except for the conclusion that the application of Revision 3 of the BWR
Owner's Group Emergency Procedure Guidelines (EPG) to the Oyster Creek control room must be submitted for review to the staff.

4, l' The informatiori discussed in the enclosed SE and needed by the staff to  ;

. complete its evaluation of your DCRDR Sumary Report was the subject of a l j meeting held in Be.thesda, Maryland. The meeting minutes dated December 17, [

1985, document in detail what is needed by the staff. Contrary to the conclusion stated in these meeting minutes that you will submit the detailed 1

i 9603100553 960227 DR ADOCK 0 % 2 I I

Mr. Fiedler FEB 2 71986 results of your application of Revision 3 of the EPG to the Oyster Creek control room, the staff has concluded that this will not be required. You must only document, including your schedule, that you will apply Revision 3 of the EPG to the Oyster Creek control room and submit at the conclusion of this application samples of the task analysis data sheets described in the meeting minutes dated December 17, 1985, and a description of the HEDs, if any, and the schedule for their implementation. This application of Revision 3 of the EPG should be included in your integrated livirg schedule being developed for Oyster Creek. The staff concludes that its detailed review of the implementation of Revisions 1 and 2 of the EPG to Oyster Creek will be sufficient.

Sincerely, M J ul % gy John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing

Enclosure:

Safety Evaluation

, cc w/ enclosure:

See next page DISTRIBUTLON Bechet W ie d JZwolinski NRC'PDR ACRS (10)

BWD#1 Rdg CMiller RBernero JDonohew OELD GHolahan EJordan OC File BGrimes MSrinivasan JPartlow Glainas JKelly /

4 ,

r f y1 V

ICSB:)BL DBL:PD#1

( Ja son 01 43 h few:tm MSrinivasan f., ///J/86 AD W as JZwolinski g/g86 / /86 2,/2 86 1/r1/86

Mr. Fiedler February 27, 1986 results of your application of Revision 3 of the EPG to the Oyster Creek control room, the staff has concluded that this will not be required. You must only document, including your schedule, that you will apply Revision 3 of the EPG to the Oyster Creek control room and submit at the conclusion of this application samples of the task analysis data sheets described in the meeting minutes dated December 17, 1985, and a description of the HEDs, if any, and the schedule for their implementation. This application of Revision 3 of the EPG should be included in your integrated living schedule being developed for Oyster Creek. The staff concludes that its detailed review of the implementation of Revisions 1 and 2 of the EPG to Oyster Creek will be sufficient.

Sincerely, /

r N-John A. Zwolinski, Director BWR Ftroject Directorate #1 Division of BWR Licensing

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page I

=

r Mr. P. B. Fiedler Oyster Creek Nuclear Oyster Creek Nuclear Generating Station Generating Station CC:

G. F. Trowbridge, Esquire Resident inspector Shaw, Pittman, Potts and Trowbridge c/o U.S. NRC 1800 M Street, N.W. Post Office Box 445 .

Washington, D.C. 20036 Forked River, New Jersey 08731 J.B. Liberman, Esquire Commissioner Bishop. Liberman, Cook, et al. New Jersey Department of Energy 1155 Avenue of the Americas 101 Connerce Street l

New York, New York 10036 Newark, New Jersey 07102 Eugene Fisher, Assistant Director Regional Administrator, Region I Division of Environmental Quality U.S. Nuclear Regulatory Commission Department of Environmental +

631 Park Avenue Protection King of Prussia, Pennsylvania 19406 380 Scotch Road Trenton, New Jersey 08628 BWR Licensing Manager GPU Nuclear 100 Interpace Parkway Parsippany, New Jersey 07054 Deputy Attorney General State of New Jersey Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 D. G. Holland Licensing Manager Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731 4