Forwards Safety Insp Rept 50-293/88-11 on 880314-18.No Violations Noted.Evaluation of Procedures Suporting Emergency Operating Procedures Not Completed Because Walkthrough Not Completed by Util
ML20154F928
Person / Time
Site: Pilgrim
Issue date: 05/17/1988
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20154F931 List:
References
NUDOCS 8805240132
Download: ML20154F928 (2)


See also: IR 05000293/1988011

Text

- _______

..

m-

.

'

.- MAY 171988

Docket No. 50-293

Boston Edison Company

ATTN: Mr. Ralph G. Bird

Senior Vice President - Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection No. 50-293/88-11

This refers to the safay inspection conducted by Messers. W. Kennedy, and

G. Thomas of the Office of Nuclear Reactor Regulation, Messrs. D. Florek and

C. Sisco of this office and two contractors on March 14-18, 1968 of .ictivities

at the Pilgrim Nuclear Power Station, Plymouth, Massachusetts authorized by NRC

DPR-35 and to the discussions of our findings held by Mr. W. Kennedy and team

members with yourself and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, intervicws with personnel, and observations by the inspectors.

Within the scope of this inspection, no violations were observed. However, as

discussed in Secticn 8 of the enclosed report, we were not able to cceplete the

evaluation of the procedures supporting the Emergency Operating Procedures,

called satellite procedures, because the walkthrough of the procedures had not

been completed by BEco. In addition, three other unresolved items are

identified in the report and described in the P,esults section of the Inspection

Sumary. You are requested to respond to the unresolved items, in writing,

within thirty days of receipt of this letter describing any actions taken or

planned to resolve the issues identified.

The response requested by this letter is not subject to the clearance

procedures of the Office cf Managerent and Budget as required by the Paperwork

Reduction Act of 1980, PL S6-511.

Your cooperation with us in this ratter is appreciated.

Sincerely, l

ROBERT M. GALLO

Robert H. Gallo, Chief

Operations Branch n

Division of Reactor Safety /

Enclosure: NRC Region I Inspection Report Number 50-293/88-11

8805240132 880517

fl)I \

PDR ADOCK 05000293

-

UCD - - _ _ _ _ _ _ - - _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _

. - _ _ _ _ _ _ _ _ _ _ _ _ _

.

,.

,

.

"

Boston Edison Company -2- ,

cc w/ enc 1: ,

K. Highfill, Station Director

R. Anderson, Nuclear Operations Manager ,.

B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of Selectrren

Plymouth Civil Defense Director

J. Keyes, Boston Edison Regulatory Affairs and Programs

E. Robinson, Nuclear Information Manager

R. Swanson, Nuclear Engineering Department Manager

The Honorable Edward J. Markey

The Honorable Edward P. Kirby

The Honorable Peter V. Forman

S. Pollard, Secretary of Energy Resources

P. Ag%s . MMstant Secretary of Public Safety, Consonwealth of Massachusetts

R. Slimshu MASSPIRG

Public Ns.ent Room (PDR)

local Pub.c Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Comonwealth of Massachusetts (2)

bec w/ enc 1:

Region I Docket Rocm (with concurrences)

M. Perkins, Management Assistant, DRMA (w/o enc 1)

S. Collins, DRP

R. Bicugh, DRP

L. Decrflein, DRP

R. Bores, DRSS

D. Mcdonald, PM, NRR

l {Y/

RI S

F11 ok

HC :

Kq

,,c

F.

y

DR&

(4n'ghM

RI:DRP

Dlough

hK

Gablo

5/h88 5/t /88 5/n/88 5//J/88 5/ 88

'

F TohB

@' CFFICIAL RECORD COPY