ML20154F928
| ML20154F928 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/17/1988 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bird R BOSTON EDISON CO. |
| Shared Package | |
| ML20154F931 | List: |
| References | |
| NUDOCS 8805240132 | |
| Download: ML20154F928 (2) | |
See also: IR 05000293/1988011
Text
- _______
..
m-
.
MAY 171988
'
.-
Docket No. 50-293
Boston Edison Company
ATTN: Mr. Ralph G. Bird
Senior Vice President - Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection No. 50-293/88-11
This refers to the safay inspection conducted by Messers. W. Kennedy, and
G. Thomas of the Office of Nuclear Reactor Regulation, Messrs. D. Florek and
C. Sisco of this office and two contractors on March 14-18, 1968 of .ictivities
at the Pilgrim Nuclear Power Station, Plymouth, Massachusetts authorized by NRC
DPR-35 and to the discussions of our findings held by Mr. W. Kennedy and team
members with yourself and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report enclosed with this letter.
Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, intervicws with personnel, and observations by the inspectors.
Within the scope of this inspection, no violations were observed.
However, as
discussed in Secticn 8 of the enclosed report, we were not able to cceplete the
evaluation of the procedures supporting the Emergency Operating Procedures,
called satellite procedures, because the walkthrough of the procedures had not
been completed by BEco.
In addition, three other unresolved items are
identified in the report and described in the P,esults section of the Inspection
Sumary.
You are requested to respond to the unresolved items, in writing,
within thirty days of receipt of this letter describing any actions taken or
planned to resolve the issues identified.
The response requested by this letter is not subject to the clearance
procedures of the Office cf Managerent and Budget as required by the Paperwork
Reduction Act of 1980, PL S6-511.
Your cooperation with us in this ratter is appreciated.
Sincerely,
l
ROBERT M. GALLO
Robert H. Gallo, Chief
Operations Branch
n
fl)I \\
/
Division of Reactor Safety
Enclosure: NRC Region I Inspection Report Number 50-293/88-11
8805240132 880517
ADOCK 05000293
-
UCD
- - _ _ _ _ _
- - _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ -
_
_
. - _ _ _ _ _ _ _ _ _ _ _ _ _
.
,.
,
.
"
Boston Edison Company
-2-
,
cc w/ enc 1:
,
K. Highfill, Station Director
R. Anderson, Nuclear Operations Manager
,.
B. McIntyre, Chairman, Department of Public Utilities
Chairman, Plymouth Board of Selectrren
Plymouth Civil Defense Director
J. Keyes, Boston Edison Regulatory Affairs and Programs
E. Robinson, Nuclear Information Manager
R. Swanson, Nuclear Engineering Department Manager
The Honorable Edward J. Markey
The Honorable Edward P. Kirby
The Honorable Peter V. Forman
S. Pollard, Secretary of Energy Resources
P. Ag%s . MMstant Secretary of Public Safety, Consonwealth of Massachusetts
R. Slimshu
MASSPIRG
Public Ns.ent Room (PDR)
local Pub.c Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Comonwealth of Massachusetts (2)
bec w/ enc 1:
Region I Docket Rocm (with concurrences)
M. Perkins, Management Assistant, DRMA (w/o enc 1)
S. Collins, DRP
R. Bicugh, DRP
L. Decrflein, DRP
R. Bores, DRSS
{Y/
l
hK
DR&
RI:DRP
RI
S
HC :
F.
(4n'ghM
Dlough
Gablo
F11 ok
Kq , , c y
5/h88
5/t /88
5/n/88
5//J/88
5/
88
F
TohB
'
@'
CFFICIAL RECORD COPY
_
/