Requests Submittal of Schedule for Installation & Testing of Containment Atmospheric Dilution Sys within 60 Days,Per Rev 2 to Reg Guide 1.7
ML20154D811
Person / Time
Site: Pilgrim
Issue date: 03/14/1978
From: Ippolito T
US ATOMIC ENERGY COMMISSION (AEC)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML20154D739 List:
References
FOIA-88-198, RTR-REGGD-01.007, RTR-REGGD-1.007 NUDOCS 8809160123
Download: ML20154D811 (2)


Text

l

,g.

/

U O

  • 84 UNITE D sTAf f s NUCLE AR RE GULATORY COMM13slON M..

5j}'F p' j i

l m s m.s o f os. o. c. nes u ifARCH 14 IST)

Oceket No. 50-293 1

1 I

1 Mr. G. Carl Andognini Boston Edison Compar<y M/C NUCLEAR 800 Boylston Street Boston, Massachusetts 02199 I !'

Dear Mr. Andognint:

Your letter of June 13. 1974 advised us that you had suspended work on ;

)

the Contaircent Atmospheric Otlution (FAD) System pending reviticn to_ Regulatory Guide 1.7, Control of Combust 1 Die nas Concentrations in I

Containment following a t.oss-of-Coolant Accident.

Your proposed CAD -

system was described in Amendrent h'o. 35 to the Pilgrim Nuclear Power Station (PtiPS) Unit ho.1 Final Safety Analysis Report (FSAR) s ubmitted on January 28.197L You indicated that the proposed CAD system would te reevaluated and codified as appropriate after issuance of the revisedRegulatory~ Guide (RGk(),))-

~

- - - ~~

"~ ~

1 l

Revision I to RG 1.7 was issued for cor. ment in September 1976.

Revision 2 l

to R31.7 was issued in final status in November 1978.

e l

Section 4.1.2, "Containment Atnosphere Control" of the Final Sa fety Evaluation Report _(SER) for Pligt im iluelear Power Station dated 1

l l

August 25, 1971 in~dicated that the staff had conelvded that a hydrottn l

control syste: should be provided at' PhP5 and that bac1 fitting the.

_Ptigrim facility in this regard would provide substantial additional

  • ProteGlon required for the public health and safetym The SER further pointed out that the design and installation of the system should be achieved in a reasonable period of time.

l l

Accordingly. We request that you submit, within 60 days of your recelet t

of this letter, your schedule for7he installation aM testino of a

'A0 system at PliPS, Also inciuce in your semittal, a detailed escription of any design changes made to the original FSAR submittal l

as a refult of the revised requiayory guldance.

l 9

880916012,3 800823 PDR FOIA WHNSO*400-198 PDR v.

1 q

,,/

I

/

j

'. G. Carl Andogninf

-t-i

/

/

Your cooperation with us is appreciated.

1 r

Sincerely.

[

i i

I hsA Thomas Ippoltto. Chief l

Operating Reactors Branch #3 Division of Operating Reactors a

t cc:

see next page i

k l

I l

t 4

i 1

i l

i 1

.i i

A 4

f 3

i i

t l

[

1 I

l I

l 6

I i

1 t

i h

l i

i l

J 1

- -