Requests Submittal of Schedule for Installation & Testing of Containment Atmospheric Dilution Sys within 60 Days,Per Rev 2 to Reg Guide 1.7
ML20154D811
Person / Time
Site: Pilgrim
Issue date: 03/14/1978
From: Ippolito T
US ATOMIC ENERGY COMMISSION (AEC)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML20154D739 List:
References
FOIA-88-198, RTR-REGGD-01.007, RTR-REGGD-1.007 NUDOCS 8809160123
Download: ML20154D811 (2)


Text

l

,g.

  • OU

/

  • 84 UNITE D sTAf f s NUCLE AR RE GULATORY COMM13slON i

5j}'F l

M.p'.j .' m s m.s o f os. o. c. nes u

,,,# ifARCH 14 IST)

Oceket No. 50-293 1

1 I

1 Mr. G. Carl Andognini Boston Edison Compar<y M/C NUCLEAR 800 Boylston Street Boston, Massachusetts 02199 .

I !'

Dear Mr. Andognint:

Your letter of June 13. 1974 advised us that you had suspended work on ;

the Contaircent Atmospheric Otlution (FAD) System pending reviticn )

I to_ Regulatory Guide 1.7, Control of Combust 1 Die nas Concentrations in

! Containment following a t.oss-of-Coolant Accident. Your proposed CAD -

system was described in Amendrent h'o. 35 to the Pilgrim Nuclear Power Station (PtiPS) Unit ho.1 Final Safety Analysis Report (FSAR) s ubmitted on January 28.197L You indicated that the proposed CAD system would te reevaluated and codified as appropriate after issuance of the

~

revisedRegulatory~ Guide (RGk(),))-

- - - - - - - - ~~ "~ ~ 1 l

Revision I to RG 1.7 was issued for cor. ment in September 1976. Revision 2 e l to R31.7 was issued in final status in November 1978.

l Section 4.1.2, "Containment Atnosphere Control" of the Final Sa fety 1

Evaluation Report _(SER) for Pligt im iluelear Power Station dated l

l August 25, 1971 in~dicated that the staff had conelvded that a hydrottn '

l control syste: should be provided at' PhP5 and that bac1 fitting the .

  • _Ptigrim facility in this regard would provide substantial additional
  • ProteGlon required for the public health and safetym The SER further pointed out that the design and installation of the system should be achieved in a reasonable period of time.

l l Accordingly. We request that you submit, within 60 days of your recelet t of this letter, your schedule for7he installation aM testino of a

'A0 system at PliPS, Also inciuce in your semittal, a detailed escription of any design changes made to the original FSAR submittal l as a refult of the revised requiayory guldance. l 9

880916012,3 800823 PDR FOIA PDR WHNSO*400-198 ,

v. -

1

. q

,,/  ;

I

/ .

j , .

. G. Carl Andogninf -t-  :

i / Your cooperation with us is appreciated.

1

/

r Sincerely. [

i i I

hsA Thomas Ippoltto. Chief  !

l Operating Reactors Branch #3  !

Division of Operating Reactors a

cc: see next page t i

k I

l l

t 4

i 1 -

i l

1 i

.i  !

, i A

4 .

f 3 i . i t ,

l

[  !

1 I l I 6 l I

1 i

t i

h l

  • i i l J

l 1

- _ _ _ _ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _- . _ _ _ _ - - - _ - _ _ _ _ _ _ _ - - _