Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24.No Fundamental Flaws in Mgt Structure,Mgt Performance,Programs or Program Implementation Noted.Results Will Be Considered in Decision Re Restart
ML20154C273
Person / Time
Site: Pilgrim
Issue date: 09/07/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20154C278 List:
References
NUDOCS 8809140303
Download: ML20154C273 (3)


See also: IR 05000293/1988021

Text

r-

. : .

,

<+

SEP 071988

Docket No. 50-293

Boston Edison Company

ATTN: Mr. Ralph G. Bird

Senior Vice President - Nuclear

Pilgrim Nuclear Power Station

RF0 #1, Rocky Hill Road

P1vmouth, Massachusetts 02360

Gentlemen:

Subject: NRC Region I Inspection Report No. 50-293/88-21, Integrated

Assessment Team Inspection

This refers to the Integrated Assessment Team Inspection (IATI) led by

Mr. A. Randy Blough of this office on August 8-24, 1988, at the' Pilgrim

Nuclear Power Station (PNPS), Plymouth, Massachusetts. The results of the

inspection are documer;ted in the enclosed inspection report. At the conclusion

of the inspection, an exit interview was held with you and members of your

staff to discuss the scepe and the findings of the inspection.

The purpose of this inspection was to perform an independent, in-deoth assess-

ment of the readiness of management controls, programs, and personnel to sup- i

port safe restart and operation of the facility. The inspection Team performed i

an integrated evaluation of various functional areas, including operations, '

maintenance, surveillance, radiation protection, security, training, fire pro-

tection, and assurance of quality. Within those areas, the inspection con- l

sisted of interviews with personnel, obs(rvations of plant activities,. and .

selective examinations of procedures, records, and documents by the inspectors. (

Within the scope of its review, the Team concluded with high confidence that

Bor, ton Edison Company (BECo) management controls, programs, and personnel are

generally ready and performing at a level to support safe startup and operation

of the facility. Those technical items requiring resolution or completion .

'

prior to restart are bei.ig addressed and tracked by BECo. The Team identified

a relatively small number of additional items for which actions or evaluations .

appear appropriate; BECo has made commitments in those areas, as detailed in i

'

section 2.4 of the enclosed report. As a result of this inspection, the

,

Team concluded that there are currently no fundamental flaws in BEco's '

management structure, management performance, programs, or program '

i implementation that would inhibit its ability to assure reactor or public

safety during plant operation. [

!

,

7

! B009140303 000 293

PDR ADOCK O g

0 I

OFFICIAL RECORD COPY PILGRIM IATI 50-293/88-21 - 0001.0.0

09/07/88 1)(

TEN

t ___________ ._ _ _ _ .

O .,

Boston Edison Company 2 SEP 071988

If your understanding of any item detailed in Section 2.4 of the enclosed

. report differs from that stated, please contact Mr. Blough or me promptly. The

NRC will review the status of these issues prior to any restart of PNPS.

The results of this inspection will be considered during the NRC staf t" s

deliberations-as it reaches its decision regarding a PNPS restart recommenda-

tion to the NRC Commission.

No written reply to this letter is required. Your cooperation with us is

appreciated.

Sincerely,

ORIGINAL btGNto y

Samuel J. Collins, Deputy Director

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-293/88-21

cc w/ enc 1:

K. Highfill, Station Director

R. Anderson, Plant Manager

J. Keyes, Licensing Division Manager

E. Robinson, Nuclear Information Manager

R. Swanson, Nuclear Engineering Department Manager

The Honorable Edward J. Markey

The Honorable Edward P. Kirby

The Honorable Peter V. Forman

B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts

S. Pollard, Massachusetts Secretary of Energy Resour.es

R. Shimshak, MASSPIRG '

Public Document Room (POR)

Local pubite Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

CommonwealthofMassachusetts(2)

P. Chan, Commonwealth of Massachusetts

S. Sholly, MHB Technical Associates

0FFICIAL RECORD COPY PILGRIM IATI 50-293/88-21 - 0002.0.0

09/06/88

.______ _

. .

,

Boston Edison Company 3

SEP 071988

bec w/ enc 1:

Region I Docket Room (with concurrences)

Mr.nagement Assistant, DRMA (w/o enc 1)

W. Russell, RI

W. Kane, RI ,

S. Collins, RI

J. Wiggins, RI

R. 81ough, RI

L. Doerflein, RI

M. Kohl, RI

M. Evans, RI

G. Smith, RI

T. Dragoun, RI

R. Bores, RI ,

K. Abraham, 'll "

L. Rossbach, SRI - Indian Point 2

W. Raymond, SRI - Millstone Point 1, 2 and 3

C. Warren, SRI - Pilgrim

J. Lyash, RI - Pilgrim

T. Kim, RI - Pilgrim

8. Boger, NRR

,

R. Wessman, NRR

"

D. Mcdonald, NRR

F. Akstulewicz, NRR

L. Plisco, NRR

R. Jacobs, INP0

W. 011u, ARM

M. Callahan, GPA/CA

P. Boehnert, ACRS

l

t

I

'

,

'

!

i

gr0

RI:DRP I:DRP :DRP

i ) B

l gRBlough/mjd

JWiggins l

Collins

(lh

Une

l- 9/7 /88 9/1/88 9M/88 9/i/88

0FFICIAL RECORD COPY PILGRIM IATI 50-293/88-21 - 0003.0.0

09/07/88 L

!

l

I