ML20154B160
| ML20154B160 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 05/09/1988 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Fiedler P GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20154B164 | List: |
| References | |
| NUDOCS 8805170092 | |
| Download: ML20154B160 (2) | |
See also: IR 05000219/1988004
Text
-
-.
- 1
.
i
MAY e 9 1988
.
Docket / License: 50-219/DPR-16
GPU Nuclear Corporation
ATTN: Mr. P. B. Fiedler
Vice President and Director
Oyster Creek Nuclear Generating Station
P.O. Box 388
Forked River, New Jersey
08731
Gentlemen:
Subject:
Inspection Report No. 50-219/88-04
This refers to the routine safety inspection conducted by Messrs. J. Wechselberger,
E. Collins, W. Baunack, and Ms. S. Peleschak from February 7 - March 19,1988, at
the Oyster Creek Nuclear Generating Station.
The inspections consisted of document
reviews, interviews and observations of activities as documented in the enclosed
inspection report. The findings were discussed with you and other members of your
staff at the conclusion of the inspection.
Based on the results of this inspection, it appears that some of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
These violations have been
categorized by severity level in accordance with the "General Statement of Policy
and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement
Policy). You are required to respond to this letter and in preparing your response
you should follow the instructions in Appendix A.
In your response to violations
B and C please include what corrective action you plan to take to address the ade-
quacy of your programs to ensure snubber operability with regard to spherical
bearing extrusions.
Also, this letter acknowledges receipt of your letter of January 15, 1988, which
provides responses to four findings identified during Inspection 50-219/87-24.
Our initial review indicates your responses are acceptable.
Your actions, as well
as other observations noted during Inspection 50-219/87-24 will be examined during
a future inspection of your licensed program.
Your cooperation with us in these matters is appreciated.
Sincerely,
6 818888W
tesN. Bettenhensen
Lee H. Bettenhausen, Chief
Projects Branch No. 1
Division of Reactor Projects
OFFICIAL RECORD COPY
OL50-219/88-04 - 0001.0.0
05/02/88
'
gd /
8805170092 880509
ADOCK 05000219
@.
[K@
- . - - - .
.
.
-
. -----
2-- -
- --
.. _. ..
.
.
. . . .
.
.
- - - - - - - - - _ - . - - _ .
. %.4
. ' - ,' ./ '
,
.
GPU Nuclear Corporation
2-
g gg g
,
l
Enclosures:
1.
Appendix A, Notice of Violation
,'
-
2.
NRC Region.I Inspection Report No.' 50-219/88-04
'
cc w/encis:
,
BWR Licensing Mana'ger
'l
Licensing Manager, Oyster Creek
Public Document Room (PDR)
local Public Document Room (LPOR).
Nuclear' Safety Information Center (NSIC)'
NRC Resident Inspector
State of New Jersey
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o encis)
.
'
DRP Section Chief
DRS Director
DRSS Director
'
!
Technical Information' Center (TIC)
i
i
j
i
!
i
i
.!
!
.
G[
RI:0R
[,
RI:
P
RI:DRP
Wechselberger/meo
Jgwgill
7/ettenhausen :
5/2/88
3 ylQ
?/99
.
OFFICIAL RECORD COPY
DL50-219/88-04.- 0002.0.0
05/02/88
2
!
!!
$
--
-
- .
. _ -
-
-_
.
. .
. -
.
.