Text
__ ._
_
_ - .
.
._
._
_
.
,.
.
.
.
s
' ' . .
SEP 02 WB
1
r
,
l
Docket Nos. 50-325 and 50-324
I
License Nos. DPR-71 and DPR-62
j
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Senior Executive Vice President
-
t
1
!
Power Supply and Engineering
'
{
and Construction
P. O. Box 1551
,
(
Raleigh, NC 27602
)
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
f
'
(NRC INSPECTION REPORT NOS. 50-325/88-24AND50-324/88-24)
!
This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by
i
William H. Ruland on July 7 - August 7, 1988. The inspection-included a review
}
3
!
of activities authorized for your Brunswick facility. At the conclusion of the
i
inspection, the findings were discussed w'.th those members of your staff
<
i
)
identified in the enclosed inspection report.
!
Areas examined during the inspection are identified in the report.
Within
!
,
j
these areas, the inspection consisted of selective examinations of procedures
!
and representative records, interviews with personnel, and observation of
i
i
activities in prooress.
'
>
.
The inspection fir. dings indicate that certain activities appeared to violate
i
'
i
NRC requirements.
One violation (325, 324/88-24-01), references to pertinent
f
j
requirements, and elements to be included in your response are described
j
i
in the enclosed Notice of Violation.
In addition, two other violations
,
1
(325, 324/88-24-03 and 04) were identified.
These violations are described
i
i
in the enclosed inspection report and are under consideration for escalated
l
'l
enforcement action.
Accordingly, no Notice of Violation is being issued at
this time, and no response to those particular violations is required,
t
i
However, please be advised that the number and characterization of violations
j
described herein may change as a result of further NRC review. An Enforcement
j
Conference to discuss these violations has been scheduled for September 8,
7
1988.
You will be advised by separate correspondence of the results of our
i
j
deliberations on this matter.
Also, in one instance, because all of the
l
criteria for categorization of licensee-identified violatiens were met, the
l
.
1
violation is not being cited.
The details pertaining to the licensee-
!
identified violation are described in paragraph 14 of the enclosed inspection
l
report.
!
i
i
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
l
!
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
}
will be plar.ed in the NRC Public Document Room.
.
8809130163 880902
i
'
POR
ADOCK 05000324
g((
'
l
Q
)
zect
I
-
-
-
-
.
' . -
,.
'
'.
M n eg
-
-
Carolina Power and Light Company
2
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
J. Nelson Grace
Regional Administrator
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
P. W. Howe, Vice President
Brunswick Nuclear Project
J. L. Harness, Plant General Manager
State of North Carolina
bec w/encis:
NRC Resident inspector
DRS. Technical Assistant
Document Control Desk
Rll
[h)'
R1
I
RI
j
^
RCarroll:tm
Fredrickson
DVerrelli
0$'.:f/ /88
09/ /
/88
09/ / /88
09/ [ /88
\\(
RIl
f
i
RI
R
f
LReyes
GJenki@
MEr
t
,
09/
/88
09/A /88
0
/88
- - -