Notice of Violation from Insp on 880707-0807.Violation Noted:No Shift Foreman Review Obtained Prior to Installation of Wood Support Structures Under Diesel Generator Silencers & Fire on Diesel Generator Bldg Roof Resulted
ML20154B000
Person / Time
Site: Brunswick  
Issue date: 09/02/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20154A980 List:
References
50-324-88-24, 50-325-88-24, NUDOCS 8809130168
Download: ML20154B000 (1)


Text

.

ENCLOSURE NOTICE OF VIOLATION Carolina Power and Light Company Docket Nos. 50-325 and 50 *i24 Brunswick 1 and 2 License Nos. DPR-71 and DPR-62 l

During the Nuclear Regulatory Comnission (NRC) inspection conducted on July 7 -

August 7,1988, a violation of HRC requirements was identified.

In accor-4 dance with the "General Statement of Policy and Procedure for NRC Enforcement 4

Actions," 10 CFR Part 2 Appendix C (1983), the violation is listed below:

10 CFR 50 Appendix B, Criterion V, requires that activities affecting l

quality shall be prescribed by documented instructions or procedures of I

a type approp.iate to the circumstances, i

Contrary to the above, instructions of a type appropriate to the circumstances were not used in that, on and before July 22, 1988, wood support structures were installed under the four diesel generator silencers using a plant services authorization.

Consequently, no shift l

foreman review was obtained prior to the installation, and a fire on the diesel generator building roof resulted.

This is a Severity Level IV violation (Supplement I).

[

i Pursuant to the provisions of 10 CFR 2.201, Carolina Puwer and Light Company is r

hereby required to submit a written statement or explanation to the Nuclear 1

Regulatory Cocnission, ATTN: Document Control Desk. Washington, DC 20555, i

with a copy to the Regional Administrator, Region II, and a copy to the NRC

)l Resident Inspector, within 30 days of the date of the letter transmitting this Notice.

This reply should be clearly marked as a "Reply to a Notice of j

Violation"andshouldinclude[foreachviolation):

(1) admission or denial of i

i the violation, (2) the reason for the violation if admitted (3) the corrective 1

steps which have been taken and the results achieved (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response time.

I i

FOR THE NUCLEAR REGULATORY COMMISSION 1

J. Nelson Grace Regional Administrator Dated at Atlanta, Georgia this 2nd day of September 1988 680913016e esopo,

$DR ADOCK 05000324 PDC