ENCLOSURE NOTICE OF VIOLATION Carolina Power and Light Company Docket Nos. 50-325 and 50 *i24 Brunswick 1 and 2 License Nos. DPR-71 and DPR-62 l  !

During the Nuclear Regulatory Comnission (NRC) inspection conducted on July 7 -

4 August 7,1988, a violation of HRC requirements was identified. In accor- ,

4 dance with the "General Statement of Policy and Procedure for NRC Enforcement '

Actions," 10 CFR Part 2 Appendix C (1983), the violation is listed below:

10 CFR 50 Appendix B, Criterion V, requires that activities affecting l quality shall be prescribed by documented instructions or procedures of I a type approp.iate to the circumstances, i Contrary to the above, instructions of a type appropriate to the circumstances were not used in that, on and before July 22, 1988, wood support structures were installed under the four diesel generator  :

silencers using a plant services authorization. Consequently, no shift l foreman review was obtained prior to the installation, and a fire on the diesel generator building roof resulted.

This is a Severity Level IV violation (Supplement I). [

i Pursuant to the provisions of 10 CFR 2.201, Carolina Puwer and Light Company is r

, hereby required to submit a written statement or explanation to the Nuclear 1

Regulatory Cocnission, ATTN: Document Control Desk. Washington, DC 20555, i with a copy to the Regional Administrator, Region II, and a copy to the NRC

)l Resident Inspector, within 30 days of the date of the letter transmitting this Notice. This reply should be clearly marked as a "Reply to a Notice of j Violation"andshouldinclude[foreachviolation): (1) admission or denial of i i the violation, (2) the reason for the violation if admitted (3) the corrective 1 steps which have been taken and the results achieved (4) the corrective steps I

which will be taken to avoid further violations, and (5) the date when full l compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

l I

i FOR THE NUCLEAR REGULATORY COMMISSION l

1 J. Nelson Grace Regional Administrator Dated at Atlanta, Georgia l

this 2nd day of September 1988 l