UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
e5
g
WASHINGTON, D. C 20555
,o
.....
January 23, 1986
Docket No. 50-293
i
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, Massachusetts 02199
l
Gentlemen:
l
SUBJECT: SAFETY SYSTEM FUNCTIONAL INSPECTION REPORT 50-293/85-30
This letter forwards the report of the Safety System Functional Inspection
performed by an NRC team from November 4-8 and November 18-22, 1985 in-
volving activities authorized by NRC Operating License No. LPR-35 for your
i
Pilgrim facility. This inspection was conducted jointly by members of
Region I and the Office of Inspection and Enforcement, by NRC contractors,
and with assistance of the Resident Inspector. At the conclusion of the
j
'
inspection, the findings were discussed at an exit meeting with thess
members of your staff identified in the appendix to the enclosed inspection
i
report.
i
This NRC effort at Pilgrim represents a new inspection approach involving
,
an assessment of the operational readiness and functions of selected
safety systems. Particular attention is directed to the details of modifi-
cations and design control, quality of maintenance and surveillance, and
adequacy of testing applicable to those safety systems. At Pilgrim, the team
selected the high pressure coolant injection systen as described in the
operating license as the primary focus of its review. A partial review was
performed of other selected safety systems, such as core spray, standby gas
treatment, and residual heat removal.
The report includes findings that may result in enforcement action, which
would be the subject of subsequent corraspondence.
The report also addresses
other observations and conclusions made by the inspection team.
Section II
of the report is a suranary of the safety effects of the rore significant
findings on the operational readiness of the selected safety systems.
,
We note tFdt your staff has taken prompt and effective corrective actions for
l
many of the weaknesses identified by the NRC inspection team, We further note
'
that you have reviews in progress regarding several of the other identified
weaknesses to determine what, if any, corrective actions will be ne,cessary.
You are encouraged to keep the Region 1 Office inforned, in writing', of the
results of your reviews and your plans for corrective actions regarding those
,
areas in which weaknesses were ident ufad.
1
l
8602290791 e60128
ADOCK O
23
0
.
Boston Edison Company
-2-
'
Should you have any questions concerning this inspection, we would be pleased
to discuss them with you.
0 f;;!nNYhd 84
"
James M.Ta#
James M. Taylor, Director
Office of Inspection and Enforcement
Enclosure:
Inspection Report No. 50-293/85-30
cc w/ enclosure:
A. V. Morisi, Manager, Nuclear Management Services Department
C. J. Mathis, Station Manager
Joanne Shotwell, Assistant Attorney General
Paul Levy, Chairman, Department of Public Utilities
Plymouth Board of Selectmen
Plymouth Civil Defense Director
Senator Edward P. Kirby
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
l
Commonwealth of Massachusetts (2)
l
bec w/encls:
'
Section Chief DRP
Senior Operations Officer (w/o encis)
W. Raymond, SRI Vermont Yankee
T. Shediosky, SRI, Millstone 182
H. Eichenholz, SRI, Yankee
P. Leach, LPM, NRR
D. Johnson, PS 3A, Region 1
H. Kister, Chief, PBI, Region 1
DISTRIBUTION:
H. R. Bocher, NRR
ORPB reading
C. D. Ebneter, RI
DI reading
NRC PDR
.
Local PDR
.
Region I Docket Room
1
l
J. M. Taylor, IE
l
!
R. H. Vollmer, IE
J. G. Partlow, IE
i
R. L. Spessard, IE
!
P. F. McKee, IE
i
L. J. Callan, IE
T. E. Murley, RI
T. T. Martin, RI
m)
R. W. Starostecki, RI
J
Siu\\
IE:b1:0RPB
IbDI:0RPB
IE: I;(D
IE:
I
DIR
I
- Ilt
,
LJCallan:cb yPFMcKee
RLS ssard
JGPai
ow
RHVd11mer
J Taylor
1/ 'l/86
1/g/86
1/p/86
1
g6
1/ /86
1/jV/86
7