Docket Nos. 50-424, 50-425
3
'
License Nos. NPF-68,' CPPR-109
Georgia Power Company
ATTN: Mr. W. G. Hairston III
,
Senior Vice President -
!
Nuclear Optrations
!
'
P. O. Box 4545
.
'
Atlanta, GA 30302
,
Gentlemen:
,
.!
SUBJECT: NOTICE OF VIOLATION
I
(NRC INSPECTION REPORT WC';. 50-424/88-27 /ND 50-425/88-37)
,
l
This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by
J
M. Glasman on June 27-30, 1988. The inspection included a review of activities
i
authorized for your Vogtle facility.
At the conclusion of the insrection, the
i
i
findings were discussed with those members of your staff identified in the
L
4
enclosed inspection report.
1
Areas examined during the inspection are identified in the report.
Within
8
these areas, the inspection consisted of selective examinations of procedures
and representative records, interview", with personnel, and observation of
,
i
activities in progress,
i
'
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violation, references to pertinent requirements, and
"
l
elements to be included in your response are described in the enclosed Notice
j
of Violation.
[
,
)
In accordance with Section 2.790 of the NRC's "Rules of Practice," Pr.rt 2,
!
Title 10 Code of Federal Regulations, a copy of this letter and its enclosure
!
]
will be placed in the NRC Pubite Document Room.
1
'
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
3
Papemork Reduction Act of 1980. Pub. L. No.96-511.
'
]
Should you have any questions concerning this letter, please contact us.
J
.
'
Sincerely.
l
,
ORICfNAL SIGNID By
'
ALAN R. HFom
j
'
Alan R. Herdt, Chief
j
I
Engineering Branch
i
Division of Reactor Safety
'
,
Enclosures: (Seepage 2)
i
!
8809070061 880823
gg
,
DR
ADOCK 0500
4
.reo/
. _ - _ _ _ _ _ _ _
_ _ _ _ _
?
.
.
'
g g g GB9
-
Georgia Power Company
2
Enclosures:
1.
2.
NRC Inspection Report
cc w/cncls:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
,
P. D. Rice, Vice President, Project
i
Director
C. W. Hayes, Yogtle Quality
,
Assurance Manager
l
G. Bockhold, Jr., General Manager,
Nuclear Operations
L. Gucwa, Manager, Nuclear Safety
and Licensing
J. A. Bailey, Project Licensing
Manager
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
bec w/encls:
E. Reis OGC
J. Hopkins, NRR
M. Sinkule, RII
C. Cheng, NRR
DRS, Technical Assistant
,
NRC Resident Inspector
Document Control Desk
State of Georgia
RII 'i!
R ,/
@f.
RII
'
.'
MGlasm.an:ser
/ lake
f MSinkule
% %/66
f
F /IV/ 88
0yn /88
C3
,
h
<
I
,
_
_ _-_-- -
. _ - - - - - -