ML20153E311
| ML20153E311 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 02/14/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20153E316 | List: |
| References | |
| NUDOCS 8602240558 | |
| Download: ML20153E311 (2) | |
See also: IR 05000458/1986002
Text
-. i%:
FE8' 141986L
In Reply Refer To:
Docket:
50-458/86-02
,
-Gulf States Utilities
ATTN: William J. Cahill, Jr.
-Senior Vice President
River Bend Nuclear Group
P. O. Box 2951
Beaumont, Texas 77704
Gentlemen:
This' refers to the inspection conducted by Messrs. W. M. McNeill and
W. R. Bennett of this office during the period January 13-17, 1986, of activi-
ties authorized by NRC Operating License NPF-47 for River Bend Station, and to
the discussion of our findings with you and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included onsite followup, surveillance
testing, and maintenance. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
These findings are documented
in the enclosed inspection report.
'
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL'96-511.
9
RIV:RPB/A M W
RPB/A M
RPB
RPB
g
WMMcNeill:1w
WRBennett
JPJa don
JEGag.
rdo
2/ty/86
2/sy/86
2/14/86
2/y/t)
9
\\
y
,
- -- _
.
.
t
4
f,
Gulf States Utilities
-2-
'
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Odgian! Chnad Qy
J. E. Gagl!ardo '
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/86-02
cc w/ enclosures:
Gulf States Utilities
ATTN:
J. E.~ Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- MIS System
- RSB
- RSTS Operator
- W. M.:McNeill, RPB/A
- R&SPB
- W. R..Bennett, RPB/A
- RIV File
- w/766
.
.
_.________a__
. - - _ - _ _
_ . _ _ . - - . _ _ _ _ . - - - _ _ . - _ - _ _ . - _ _ _ _ -
____-__A