ML20153E311

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/86-02 on 860113-17 & Notice of Violation
ML20153E311
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/14/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20153E316 List:
References
NUDOCS 8602240558
Download: ML20153E311 (2)


See also: IR 05000458/1986002

Text

-. i%:

FE8' 141986L

In Reply Refer To:

Docket:

50-458/86-02

,

-Gulf States Utilities

ATTN: William J. Cahill, Jr.

-Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

Beaumont, Texas 77704

Gentlemen:

This' refers to the inspection conducted by Messrs. W. M. McNeill and

W. R. Bennett of this office during the period January 13-17, 1986, of activi-

ties authorized by NRC Operating License NPF-47 for River Bend Station, and to

the discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included onsite followup, surveillance

testing, and maintenance. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspectors.

These findings are documented

in the enclosed inspection report.

'

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL'96-511.

9

RIV:RPB/A M W

RPB/A M

RPB

RPB

g

WMMcNeill:1w

WRBennett

JPJa don

JEGag.

rdo

2/ty/86

2/sy/86

2/14/86

2/y/t)

9

\\

y

,

- -- _

.

.

t

4

f,

Gulf States Utilities

-2-

'

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Odgian! Chnad Qy

J. E. Gagl!ardo '

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-458/86-02

cc w/ enclosures:

Gulf States Utilities

ATTN:

J. E.~ Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB

DRSP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • D. Weiss, LFMB (AR-2015)
  • MIS System
  • RSB
  • RSTS Operator
  • W. M.:McNeill, RPB/A
  • R&SPB
  • W. R..Bennett, RPB/A
  • RIV File
  • w/766

.

.

_.________a__

. - - _ - _ _

_ . _ _ . - - . _ _ _ _ . - - - _ _ . - _ - _ _ . - _ _ _ _ -

____-__A