ML20151X356
| ML20151X356 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 04/29/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20151X360 | List: |
| References | |
| NUDOCS 8805040130 | |
| Download: ML20151X356 (2) | |
See also: IR 05000285/1988011
Text
-
_ _
_ _ _ _ _ _ _ _ - _ _
'
5
.
>;
.,
4
In Reply Refer To:
Docket:
50-285/88-11
APR 2 91988
Omaha Public Power District
ATTN:
R. L. Andrews, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Messrs. P. H. Harrell, T. Reis, and
R. P. Mullikin of this office during the period March 1-31, 1988, of activities
authorized by NRC Operating License DPR-40 for the Fort Calhoun Station, and to
the discussion of our findings with you and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included followup on previously identified
items, operational safety verification, plant tours, safety-related system
walkdowns, monthly maintenance observations, monthly surveillance observations,
security observations, radiological protection observations, in-office review
of periodic and special reports, followup on NRC Conformance Bulletin 87-01,
followup on licensee-identified design problems, followup on an allegation, and
followup on an enforcement conference on fire protection. Within these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspectors. The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
Also during this inspection, it was found that certain of your activities
appeared to deviate from a commitment made to the NRC. This item and reference
to the commitment is identified in the enclosed Notice of Deviation.
You are
requested to respond to this deviation in writing. Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter.
Enhc
E0GY
RI
kI*
RIV: SRI i h
(h
PSS:D
TReis/nc
PHHarrell
RPMullikin p ASingh
MEEmerson
HJcott
d/16/88
4/sc/88
v /u/88
g 6l /2ts/88
/ /88
7 / 4 /88
Y
C:DRP/B
D:DRP b
TFWesterman
LJCallan
y/27/88
y /d/88
l8?28bse888:gL.,
Mol \\ \\
- - - - - - -
- -- - -- -- -- - ---- ----- - - -
~-
-
~
-
~ - - - - - - ,
-s
,
-
..
. ,.
Omaha Public Power District
-2-
.
One unresolved item is. identified in paragraph 2 of the enclosed irispection
report.
l
lle have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed inspection report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Papemork Reduction Act of 1980. PL 96-511.
.
'
Should you have any questions concerning this inspection, we will be' pleased to
discuss them with you.
l
MB%9(A ygned Bf
L.- J. Callan
,
,
L. J. Callan. Dirdctor
Division of Reactor Projects
i
Enclosures:
1.
Appendix A - Notice of Violatior
'
,2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Inspection Report
50-285/88-11
cc w/ enclosures:
W. G. Gates, Manager
Fort Calhoun Station
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
Xansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
R. D. Martin, RA
- MIS System
- SectionChief(DRP/B)
- DRP
- RIV File
- Project Engineer (DRP/B)
- RSTS Operator
- A. Bournia, NRR Project Manager
- Lisa Shea, RM/ALF
- RRI
- DRS
- TSS
M. Emerson, AC (2)
L. constable, DRP/D
- w/766