ML20151X356

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/88-11 on 880301-31 & Notices of Violation & Deviation
ML20151X356
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/29/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20151X360 List:
References
NUDOCS 8805040130
Download: ML20151X356 (2)


See also: IR 05000285/1988011

Text

- _ _ _ _ _ _ _ _ _ _ - _ _

'

5 .

>; .,

4

In Reply Refer To:

Docket: 50-285/88-11 APR 2 91988

Omaha Public Power District

ATTN: R. L. Andrews, Division Manager-

Nuclear Production

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the inspection conducted by Messrs. P. H. Harrell, T. Reis, and

R. P. Mullikin of this office during the period March 1-31, 1988, of activities

authorized by NRC Operating License DPR-40 for the Fort Calhoun Station, and to

the discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included followup on previously identified

items, operational safety verification, plant tours, safety-related system

walkdowns, monthly maintenance observations, monthly surveillance observations,

security observations, radiological protection observations, in-office review

of periodic and special reports, followup on NRC Conformance Bulletin 87-01,

followup on licensee-identified design problems, followup on an allegation, and

followup on an enforcement conference on fire protection. Within these areas,

the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspectors. The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

Also during this inspection, it was found that certain of your activities

appeared to deviate from a commitment made to the NRC. This item and reference

to the commitment is identified in the enclosed Notice of Deviation. You are

requested to respond to this deviation in writing. Your response should be

based on the specifics contained in the Notice of Deviation enclosed with this

letter.

RI kI* RIV: SRI i h PI (h PSS:D Enhc E0GY

TReis/nc PHHarrell RPMullikin p ASingh MEEmerson HJcott

d/16/88 4/sc/88 v /u/88 g 6l /2ts/88 / /88 7 / 4 /88

C:DRP/B Y D:DRP b

TFWesterman LJCallan

y/27/88 y /d/88

l8?28bse888:gL., Mol \ \

DCD

~------,

- - - - - - - - -- - -- -- -- - ---- ----- - - - ~- - ~ -

,

-s

-

.. . ,.

Omaha Public Power District -2-

.

One unresolved item is. identified in paragraph 2 of the enclosed irispection

report. l

lle have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed inspection report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Papemork Reduction Act of 1980. PL 96-511. .

'

Should you have any questions concerning this inspection, we will be' pleased to

discuss them with you.

MB%9(Al ygned Bf

L.- J. Callan ,

,

L. J. Callan. Dirdctor

Division of Reactor Projects  :

i

Enclosures:

1. Appendix A - Notice of Violatior  :'

,2. Appendix B - Notice of Deviation

3. Appendix C - NRC Inspection Report

50-285/88-11

cc w/ enclosures:

W. G. Gates, Manager

Fort Calhoun Station

P.O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC 20036

Xansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

R. D. Martin, RA * MIS System

  • SectionChief(DRP/B) *DRP
  • RIV File * Project Engineer (DRP/B)
  • RSTS Operator *A. Bournia, NRR Project Manager
  • Lisa Shea, RM/ALF *RRI
  • DRS *TSS

M. Emerson, AC (2) L. constable, DRP/D

  • w/766