ML20151W719
| ML20151W719 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/19/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20151W721 | List: |
| References | |
| NUDOCS 8808250107 | |
| Download: ML20151W719 (2) | |
See also: IR 05000313/1988023
Text
. ..
___ _ -___ __-__- - _
. _ _ .
.:
,
.
,.
"
'
AE I 919Bb
-
-
,
,
'In Reply Refer To:
Dockets: 50-313/88-23
50-368/88-23
Arkansas Power & Light Company
ATTN: Gene Campbell, Vice President -
Nuclear Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson and
R. C. Haag of this office during the period July 1-31, 1988, of activities
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. E. C. Ewing, and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included plant. status, operational safety
verification, surveillance, maintenance, plans for coping with a strike, and
followup on information notices. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the' inspectors. The findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions.of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Papemork Reduction Act of 1980, PL 96-511.
If you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
gea$$c[SS
/5/
0
L. J. Callan Director
Division of Reactor Projects
Enclosures:
(see next page)
4tIV:DRP/PSA
- C:DRP/PSA
D:
00
WDJohnson
DDChamberlain
JLCallan
jC
/ /88
/ /88
%$/88
l
- Previously concurred
_
. - -
- - - -
--
- ---------- -- ---- - - _ _ _ _ _ _ - - - _ - ,
,
4
- .,-
.c
.
1 ?g -
.
'
a
.s
.
--
.-
.
,
,~
(:
,
(.;
.:
!
Arkansas Power & Light Company-
-2-
~
,
Enclosures:
1.
Appendix A - Notice'of Violstion
2.
Appendix 8 - NRC Inspection Report
50-313/88-23
50-368/88-23
i
,
cc w/ enclosures:
Arkansas Nuclear One
ATTN:
J. M..Levine, Executive Director
Site Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801-
r
Arkansas Radiation Control Program Director
bec to DM8 (IE01)
bec distrib. by RIV:
- RRI
.
Robert D. Martin, RA
RPSB-DRSS
- Section Chief (DRP/A)
- Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
- C. Harbuck, NRR Project Manager
- R. Hall
- DRS
6
- w/766
f:
.
L