ML20151P381
Jump to navigation
Jump to search
| ML20151P381 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/02/1988 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20151P379 | List: |
| References | |
| NUDOCS 8808100010 | |
| Download: ML20151P381 (1) | |
Text
_.
i REACIM CODIRfr SYSITN SURVRTTIANCE REQUIRDENIS (Otritirued) b.
Each interials vent valve shall be demonstrated OPERABLE at least once per 24 months during shutdown, by:
l 1.
Verifying throoft visual inspection that the valve body and valve disc exhibit no abnormal degradation.
2.
Verifyirry the valve is not stuck in an cpen position, and 3.
Verifying through manual actuation that the valve is fully open with a for of $425 lbs (applied vertically upward).
8808100010 880802 PDR ADOCK 05000302 P
DC GYSTAL RIVER - LUIT 3 O/4 4-32 Amendment No.