Forwards Insp Rept 50-334/88-02 on 880201-05 & Notice of Deviation.Specific Response to Numerous Inconsistencies W/ Procedures Generation Package Identified in Procedural Steps of Emergency Operating Procedures Requested
ML20151N476
Person / Time
Site: Beaver Valley
Issue date: 04/14/1988
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20151N483 List:
References
NUDOCS 8804250310
Download: ML20151N476 (2)


See also: IR 05000334/1988002

Text

.-

, -

._

<..

'

.

APR 141988 -

.

Docket No. 50-334

Duquesne Light Company

ATTN: Mr. J. D. Sieber

Vice President

Nuclear

Post Office Box A

Shippingport, Pennsylvania 15077

Gentlemen:

Subject: Inspection Report 50-334/88-02

This refers to the special inspection conducted by Mr. P. Bissett and Mr.

N. Dudley of this office on February 1-5, 1988 at the Beaver Valley Unit 1

facility of activities authorized by NRC License No. DPR-66 and to the

discussions of our findings held by Mr. Dudley with Mr. K. Grada of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region 1

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

However, one activity appears to be a deviation from a Duquesne Light Company

commitment to adhere to the Procedures Generation Package in developing your

Emergency Operating Procedures. Numerous inconsistencies with the Procedures

Generation Package were identified in procedural steps of the Emergency

Operating Procedures. Many of these inconsistencies resulted in the Emergency

Operating Procedures not clearly stating what actions were required of the

operators. You are requested to respond to this letter. In preparing your

response you should follow the instructions contained in Appendix A.

The response requested by this letter and the accompanying Notice is not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

ROBERT M. GALLO

Robert M. Gallo, Chief

Operations Branch

Division of Reactor bafety

'

0FFICIAL RECORD COPY IR BV1 88-02 - 0001.0.0 g

04/04/88 I

8804250310 880414 -,

'

PDR ADOCK 05000334

O DCD i ( U (

'

- _ _ _ _ _ .

4 ,.

.

'.' .

Dunnacna licht Co-nanv 7

.

Enclosures:

1. Appendix A, Notice of Deviation

2. NRC Region I Inspection Report Number 50-334/88-02

cc w/encls:

H. M. Siegel, Manager, Nuclear Engineering Department

C. E. Ewing, QA Manager

W. S. Lacey, Plant Manager

R. Druga, Manager, Technical Services

R. Martin, Manager, Regulatory Affairs

J. Crockett, Senior Manager of Nuclear Operations

N. R. Tonet, Manager, Nuclear Engineering & Construction Unit

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

bection Chief, DRP

J. Beall, SRI

P. Tam, LPM, NRR

Robert J. Bores, DRSS

RI:0RS

Dudley/ja

RL- [

f6tt-

cTpCRS l

h Gallo

nfsY

3ht/88 3/17/88 3//p/88 hN88

0FFICIAL RECORD COPY IR BV1 88-02 - 0001.0.1 l

03/01/88 i