Advises That Item Re Reactor Protection Sys Protective Circuitry Surveillance Requirements Need Not Be Completed Prior to Restart,As Stated in 880715 Safety Evaluation
ML20151K657
Person / Time
Site: Pilgrim
Issue date: 07/27/1988
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Bird R
BOSTON EDISON CO.
References
TAC-62793, NUDOCS 8808030239
Download: ML20151K657 (2)


Text

. -. ..

July 27, 1988 Docket No.: 50-293 Mr. Ralph G. Bird Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station RFD#1, Rocky Hill Road Plymouth, Massachusetts 02360

Dear Mr. Bird:

SUBJECT:

REACTOR PROTECTION SYSTEM PROTECTIVE CIRCUITRY SURVEILLANCE REQUIREMENTS

Reference:

TAC Number 62793 By letter dated July 15, 1988, we indicated that your initial. proposal related to the above identified subject was unacceptable. We enclosed our safety evaluation (SE) which provided the basis for our conclusion and requested that you provide proposed technical specifications within 60 days.

We incorrectly indicated in our enclosed SE that this item should be completed prior to restart. This item is not considered necessary to be completed prior to restart. We made the decision based on the fact that Plant Procedure Number 3.M.3.34, "Testing and Calibration of Reactor Protection System (RPS) Electrical Protection Assemblies," provides reasonable assurance that the RPS protective circuitry will be tested and calibrated during the time necessary for the NRC staff to complete its review relating to the above referenced action.

Sincerely,

.0figinal signed by; Daniel G. Mcdonald, Project Manager Project Directorate I-3 Division of Reactor Projects I/11 cc: See next page Distribution:

Docket : File,;NRC & Local PDRs, PDI-3 r/f, RWessman, BBoger, itRushbrook,

.'DMcDonald, 0GC-Rockville EJordan, BGrimes, Tech Branch, ACRS (10)

P PDI-3/DIR JRushbrook D onald RWessman 1/p88

'(/ V88 1/fC/88 hfo w e m ,eeO m p

ADOCK 05000293 PNU

.p.

a Mr. Ralph G. Bird Boston Edison Company Pilgrim Nuclear Power Station cc:

Mr. K. L. Highfill Mr. Ralph G. Bird Station Director Senior Vice President - Nuclear Pilgrim Nuclear Power Station Boston Edison Company RFD #1 Rocky Hill Road Pilgrim Nuclear Power Station Plymouth, Massachusetts 02360 RFD#1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office Mr. Richard N. Swanson, Manager V. S. Nuclear Regulatory Comission Nuclear Engineering Department Post Office Box 867 Boston Edisor. Company Plymouth, Massachusetts 02360 25 Braintree Hill Park Braintree, Massachusetts 02184 Chainnan,- Board of Selectmen 11 Lincoln Street Ms. Elaine D. Robinson Plymouth, Massachusetts 02360 Nuclear Information Manager Pilgrim Nuclear Power Station Office of the Comissioner RFD #1, Rocky Hill Road Massachusetts Department of Plymouth, Massachusetts 02360 Environmental Quality Engineering One Winter Street Charles V. Barry Boston, Massachusetts 02108 Secretary of Public Safety Executive Office of Public Safety Office of the Attorney General One Ashburton Place 1 Ashburton Place Boston, Massachusetts 02108 20th F'cor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr, James D. Keyes Regulatory Affairs and Programs Group Leader Boston Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02184

- .- - . . - .