Requests Exemption from Requirements of ASME Boiler & Pressure Vessel Code,Section XI Re Inservice Insp.Insp at 1,005 Psig Pressure Could Cause Stated Personnel Hazards. Exam at Lower Pressure Proposed.Fee Paid
ML20151J186
Person / Time
Site: Brunswick 
Issue date: 04/14/1988
From: Eury L
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NLS-88-096, NLS-88-96, NUDOCS 8804210067
Download: ML20151J186 (6)


Text

g e

c

-ec P. o Box 1551 + Rale +gh. N C 27602 APR 14 1988 LYNN W. EURY sen.o, vice present SERIAL:

NLS-88 096 occatens s**"

10CFR50,55a United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT No. 2 DOCKET NO. 50-324/ LICENSE NO. DPR-62 IN SERVICE INSPECTION - ASME CODE RELIEF REQUEST Centlemen:

Carolina Power & Light Company (CP&L) hereby requests an exemption from the requirements of the ASME Boiler and Pressure Vessel Code,Section XI, IWA 5214(e), for the Brunswick Steam Electric Plant, Unit 2 (BSEP-2).

IWA-5214(e) requires a system pressure test as described in IWA-5211(a), (b) or (c) if mechanical joints of a compotmnt are disassembled and reas mbled. The provisions of 10CFR50.55a.a(3) allow for exemptions when c.pliance with the specified requirements would result in hardship or..nusual difficulties without a compensating increase in the 1cvel of quality and safety.

BACKCROUND During the hydrostatic test performed on March 19, 1988 on the BSEP-2 reactor coolant system, a seat leakage problem was detected in the reactor vessel head vent valve area. A flange on the line leading to the head vent valves was opened to perform a leak test to determine whether the manual valves (B21 F001 and B21-F002) on the bypass line around the remote operated valves (B21-F003 and B21-F004), or the remote operated valves were leaking.

It was determined that both the F003 and the F004 valves were leaking due to had seats.

One replacement valve was found on site, and procurement of a second replacement valve would take approximately 90 days. Therefore, it was decided to attempt to repair or, valve and replace the other.

In the course of this action, it was determined that a repair could not be effected and both valves would need to be replaced in order to maintain redundancy and necessary leak requirements.

The purpose of these two remote operated valve = is to vent noncondensible gases from the res.ctor vessel head during startup and while shutdown.

The valves are normally opened at reactor coolant temperatures below 212 degrees F.

They are closed during normal operation. There are also two manual valves that can serve the same N

N 5D f

8804210067 880414 Wfeb Y

PDR ADOCK 05000324 Q

DCD g (fM

c Document Control Desk NLS-88 096 / Page 2 function. The configuration of these lines and valves is shown in Updated Final Safety Analysis Report Figure 5.1.1-1.

The manual valves can be manually opened and closed as the system temperature reaches 212 degrees F.

The dose rate in the vicinity of the manual valves is approximately 30 mR/ hour. Operational control of the automatic and manual valves is administered through plant procedures; th.re are no Technical Specification requirements on the operation of these valves.

l On April 5, 1988, after being unable to repair the F003 and F004 valves, it was decided that the best solution would be to remove the F003 and F004 valves and place two caps on the 1/2 inch line. This was completed April 7, 1988. The system configuration is shown in Figure 1, and the system after the capping is shown in Figure 2.

The line on the F003 side was capped with a stainless steel cap, and the line on the F004 side with a carbon steel cap.

The piping is carbon steel. Use of the Class 1 stainless steel cap was necessary because a Class 1 carbon steal

)

l cap was not available. A liquid penetrant examination was satisfactorily performed on the bi-metallic stainless to carbon steel weld. A VT-2 inspection of the caps installed will be performed at operational pressure.

TEST REOUIRE!iEE The ASME Boiler and Pressure Vessel Code,Section XI, IWA-5214(e) requires a system pressure test if mechanical joints of a component are i

disassembled and reassembled.

The flange, which is 2 inches in diameter, was disassembled and reascembled after the reacr.(- celer l

system hydrostatic test was performed on March 19, 1988.

IVA 5214(e)

I references system pressure tests described in IWA-5211(a), (b) or (c).

The system pressure test associated with IWA-5211(a), which requires a VT-2 examination be performed while the system is in service at l

operating pressure (1005 psig), applies to the flange that was opened.

JUSTIFICATION The VT-2 examination at normal operating pressure requires visual observation of the flange at approximately 1005 psig.

This would require a drywell entry at approximately 5 to 8 percent power. At that power, the ambient temperature in the reactor vessel head area is i

I typually 170-190 degrees F, which represents a significant personnel l

safety concern.

Due to radiological conditions in the confined area in which the flange is located, at least two people would be required to make the entry.

It is anticipated that such an entry would take approximately 30 minutes c.nd that the total radiation exposure would be approximately 1 man-rem.

Each person would be required to wear protective clothing, possibly including a wet suit, and a Scott air pack. There is no installed lighting or power outlet in the area; therefore, lighting and power necessary for the inspection would need to be carried.

Since the area can be accessed only through an 18 inch diameter manway and a Scott air pack could not be worn through the manway, the air pack would have to be taken off the back and passed l

l

Document Control Desk NLS 88-096 / Page 3 through the manway while still providing breathing air.

The task of holding an air tank ovar one's head while climbing up a ladder through an 18 inch diameter manway in a highly contaminated area while maintaining a proper seal between the mask and face would be difficult.

In the event something should happen to the personnel whila performing the inspection, these conditions, along with the unusually high temperatures, could easily result in personnel casualties or injuries.

Any required rescue would be equally hazardous.

CP&L requests an exemption from performing a VT-2 inspection at a reactor pressure of 1005 psig due to these severe personnel safety hazards. Since the flange is located inside the drywell, any leakage will be directed to the drywell equipment sump. The Company is required to monitor leakage to the drywell sump at least every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

The unit would be shutdown per Technical Specification requirements if there was unidentified leakage greater than 5 gallons per minute averaged over a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, or any unidentified leakage increase of more than 2 gallons per minute over any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, or if the total leakage averaged over any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period exceeds 25 gallons per minute.

Thern is no equipment in the immediate area of the flange that could be damaged by leakage from the flange.

There is also temperature monitoring instrumentation in the area that would aid in leak detection.

The flange gasket is an asbestos filled, spiral wound 304 stainless steel Flexitallic gasket.

This type of gasket is used in the majority of flanges at BSEP.

Operational experience has shown this type of flange to be very reliable.

In addition, torque on the flange bolts was verified upon reassembly of the flange in accordance with approved plant procedures.

ALTERNATE TEST Carolina Power & Light Company proposes a VT-2 examination of the 2-inch flange at a lower pressure of approximately 100 psig. This would allow observation of the flange at approximately 1 to 2 percent power when the temperature would not be as severe and the dose rate would be lower.

ADMINISTRATIVE Carolina Power & Light Company has reviewed this request in accordance with 10CFR170.12 and determined that an application fee is required. A check for $150.00 is enclosed in payment of this fee.

Approval of this request is necessary to support startup of BSEP-2 from the current refueling outage.

Therefore, NRC approval is requested by April 18, 1988.

~

Document Control Desk NLS-88 096 / Page 4 Please refer any questions regarding this submittal to Mr. Stephen D.

Floyd at (919) 836-6901.

Yours very truly, L. W. Eury BAB/bab(\\cor\\vt2rel)

Enclosures cc:

Dr. J. Nelson Grace Mr. W. H. Ruland Mr. E. D. Sylvester

F i G uRE ' i To STM

(' LIN E '%

FL At4GE (1-lNCH) w 2 w2 il r,

r, sa Foot F004 Foof Foo3 w2 w2

'e &

V

. FLANGE (4-INCH)

TO DRYWELL EQuirgtg7 Sump REACToA VESSEL 4

i f

0 9

e 4

FIGURE 1 l

( TD STM

' LINE 4A" FLANGE (1-lNCH)

<><2 n

r, rn n

Foot F004 8

Foof Foo3 s;

o e r j

W6 1, '

CAP CAP V

FLANGE (4-INCH)

To DR,YwcLL EQulPMtsT sump REACTOR VESSEL 1

i 1

1

- - _ =.