ML20151H774

From kanterella
Jump to navigation Jump to search
Corrected Proposed Tech Specs Page,Clarifying Info Re Nuclear Svc Water Sys
ML20151H774
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/12/1988
From:
DUKE POWER CO.
To:
Shared Package
ML20151E890 List:
References
NUDOCS 8808020046
Download: ML20151H774 (1)


Text

.

3.7.4 At least two independent Nuclear Service Water (RN) loops shall be OPERABLE.

a. With both units in MODE 1, 2, 3 or 4, each loop shall contain two OPERABLE nuclear service water pumps.and associated emergency diesel generators, two essential equipment supply and return headers, and a-supply and discharge flow path capable of-being aligned to the: Standby Nuclear Service Water Pond (SNSWP).
b. With only onc unit in MODE 1, 2, 3 or 4, each loop shall contain at least one OPERABLE nuclear service water pump, associated emergency diesel generator, and the essential equipment supply and return header associated with the unit in MODE 1, 2, 3 or 4, and a supply and discharge flow path capable of being aligned to the SNSWP.

APPLICABILITY: Modes 1, 2, 3 and 4 ACTION: (Units 1 and 2)

a. Both units in MODES 1, 2, 3 or 4 With only two or three RN pumps and their associated emergency diesel generators OPERABLE, restore four RN pumps and their associated emergency diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or place at least one unit in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, in order to restore two loops to OPERABLE status for any unit which remains in MODES 1, 2, 3 or 4.
b. One unit in MODES 1, 2, 3 or 4 With only one RN pump and its emergency diesel generator OPERABLE, restore two loops to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c. One or Both units in MODES 1, 2, 3 or 4
1. With RN unavailable to any essential equipment declare the affected equipment inoperable and apply the applicable ACTION Statement.-
2. With only one RN loop OPERABLE due to the inoperability of a shared valve, flow path or component (other than an RN pump or its uniquely associated equipment) return two loops to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or place both units in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

~

PDP "a d 752TDP P