ML20151G086
| ML20151G086 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 07/19/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Deddens J GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20151G089 | List: |
| References | |
| NUDOCS 8807280125 | |
| Download: ML20151G086 (2) | |
See also: IR 05000458/1988013
Text
. _ _
_ _ _ _
__ _
-
.
__
_ _ _ _ _ _ .
_.
. _ _ _ _ _ _ _ _ _ _ _ _ _ _
,
' 'y , .' '. ,
,
,
.
JL l 9 m
,
t
In Reply Refer To.-
Cocket:
50-458/88-13
i
i
Gulf States Utilities
-ATTN: hr. James C. Deddens
-
Senior Vice President, (RBNG)
Nuclear Licensing
P. O. Box 220
St.-Francisville, LA 70775
Gentlemen:
,
This refers to the inspection conducted by Messrs. W. B. Jones and G. L. Madsen
of this office during the period May 1 through June 30, 1988, of activities
authorized by NRC Operating License NPF-47 for River Bend Station, and to the
discussion of our findings with you and other members of your staff at the
,
conclusion of the inspection.
Areas examined during the inspection included review of licensee action on NRC
Bulletins 88-01 and 88-07, followup of NRC Information Notices, surveillance
test observation, maintenance observation, safety system walkdown,'oserational
safety verification and licensee plans for coping with strikes. Witlin these
areas, the inspection consisted of selective examination of procedures and-
representative records, interviews with personnel, and observations by the NRC
inspectors. The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found-that certain of,your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the previsions of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
-
Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
,
identified inspection findings.
The status of these items is identified in
'
paragraph 3 of the enclosed report.
The responses directed by this letter and the accompanying Notices are not
'
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
,
9
l
'
- RIV:DRP/RI
- DRP/ SRI
- DRP/C
- C:DRP/C
- 0:DRP
'
WBJones
EJFord
GLMadsen
GLConstable
LJCallan
/ /88
/ /88
/ /88
/ /88
/ /88
.
- Previously concurred
d\\
8807280125 880719
ADOCK 05000458
)
O
--- . -
,
,
,
- ., .
,'-
.
,,
Gulf States Utilities
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By:
L. J. CALLAN
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/88-13
cc w/ enclosures:
Gulf States Utilities
ATTH: Mr. J. E. Booker, Manager-
River Bend Oversight
P. O. Box 2951
Beaumont, Texas 77704
Gulf States Utilities
ATTN: Mr. Les England, Director,
Nuclear Licensing - RBNG
P. O. Box 220
St. Francisville, Louisiana 70775
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- DRP
- Resident Inspector
R. D. Martin, RA
- Section Chief (DRP/C)
- Lisa Shea, RM/ALF
- MIS System
RPSB-DRSS
- RSTS Operator
- Project Engineer, DRP/C
- RIV File
- W. Paulson, NRR Project Manager
- R. Hall
- DRS
- TSS
- w/766