Confirms 880714 Telcon Re Granting of Temporary Waiver from Compliance W/Tech Spec 3.7.5.e Re UHS Through 880718 & Util Agreement to Revise & Submit Technical Input in Support of Tech Spec Change by 880718
ML20151E495
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/15/1988
From: Muller D
Office of Nuclear Reactor Regulation
To: Bliss H
COMMONWEALTH EDISON CO.
References
NUDOCS 8807260094
Download: ML20151E495 (5)


Text

_ _____ __-___ _ __--_

j '

M ac oq'o UNITED STATES g

t P n NUCLEAR REGULATORY COMMISSION h .$ WASHINGTON, D. C. 20555 k...../ July 15, 1988 Docket Nos.: 50-454, 50-455 Mr. Henry E. Bliss Nuclear Licensing Manager Connonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Bliss:

SUBJECT:

REQUEST FOR TEMPORARY WAIVER FOR COMPLIANCE FROM TECHNICAL SPECIFICATION 3.7.5.e REGARDING THE ULTIMATE HEAT SINK - BYRON STATION UNITS 1 AND 2  ;

This letter will confirm the conclusions reached during a telephone conference l on the af ternoon of July 14, 1988 between rep esentatives of CECO (M. Turbach, et al), NRR (G. Holahan, et al) and Region III (E. Greenman, et al). The NRC representatives agreed to grant a Temporary Waiver of Compliance for the Byron Station, Unit I and Unit 2 to allow changing from Mode 3 to Mode 1 which is prohibited by the requirements of the action statement 3.7.ti.e of your Technical Specification when the Rock River water level is less than 670.6 feet. This Temporary Waiver of Compliance is in effect beginning July 14, 1988, and is effective through July 18, 1988. This Temporary Waiver of Compliance was granted in view of the critical electric energy situation l brought about by the Midwest drought and associated low levels of the Rock l River. I 1

It was further agreed that CECO would revise and submit the technical input in I support of the related Technical Specification change (lettera dated June 22, 1988 and July 14,1988) by July 18, 1988. We will advise you of our decision concerning the acceptability of your request for an Emergency Technical Specification change once the information is provided and our review is completed.

The management of CECO should note that this waiver was required only oecause a submittal dated June 22, IP08 for a Technical Specification change for the same '

relief and a follow-up letter dated July 14, 1988 requesting an Emergency Technical Specification change was deficient in that it failed to provide an adequate technical basis to allow the NRC staff to reach appropriate decisions.

S)ecifically, the letters did not include a Safety Evaluation addressing tie technical basis for the chenge nor an Environmental Assessment, both of which are needed to support the iequestad aci. ions. The sole justification for the change was your reference to Generic Letter 87-09 which does not contain information on the technical issue and should not be interpreted as a blanket approval for Technical Specification changes, 8807260094 800715:cI PDR ADOCK 050004 y[O\

1 P PN I D l I

The NRC staff is willing to cooperate with you in circumstances as above, and acknowledges the need, on occasion, for prompt action on our part in support of Emergency Technical Specification changes. We require however, under '..ne.e circumstances, an adequate fully documented analysis upon which we can vase our decisions. Accordingly we recorrrnend that you review with your technical, plant, and licensing staffs the technical and administrative requirements that must be met in order to support the license amendments and other actions that are requested of the NRC.

Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - 111, IV, V and Special Projects cc: See next page

July 15,1988 The NRC staff is willing to cooperate with you in circumstances as above, and acknowledges the need, on occasion, for prompt action on our part in support of Emergency Technical Specification changes. We require however, under these circumstances, an adequate fully documented analysis upon which we can base our decisions. Accordingly we recommend that you review with your-technical, plant, and licensing staffs the technical and administrative requirements that must be met in order to support the license amendments and other actions that are requested of the NRC.

/5/

Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, .

IV, V and Special Projects I l

cc: See next page i

l l

1 l

l DISTRIBUTION:

Docket fileu r PDIII-2 Plant file NRC & Local PDRs GPA/PA PDIII-2 r/f ACRS(10)

DCrutchfield BGrimes GHolahan EJordan LLuther 0CG-Bethesda BSiegel MRing, RIII TBarnhart(4) ARM /LFMB DHagan l

l

  • PREVIOUSLY CONC.

PDIII-2:LA* PDill-2:PD*

h DRSP l LLuther:km DMuller GHolahan 7/15/88 7/15/88 7 g /88 i

. I 0

i l

0 4 l

The NRC staff is willing to cooperate with you in circumstances as'above, and acknowledges the need, on occasion, for prompt. action in our part in support of Emergency Technical Specification changes. We require however, under these circumstances, an adequate fully documented analysis upon which we  ;

can base our decisions. Accordingly we recommend that you review with your I technical, plant, and licensing staffs the technical and administrative requirements that must be met.in order to support the license amendments and other actions that are requested of the NRC.

\

Daniel R. Muller, Director s Project Directorate III-2

\ Division of Reactor Projects - III,

\ IV, V and Special Projects cc: See next page s

\

DISTRIBUTION:

Docket file PDIII-2 Plant f e NRC & Local PDRs GPA/PA \

PDIII-2 r/f ACRS(10)

DCrutchfield BGrimes GHolahan EJordan LLuther OCG-Bethesda BSiegel MRing, RIII TBarnhart (4) ARM /LFMB DHagan

\

PDIII-2:LA PD,qd PD DRSP LLuther:k DM ler GHolahan 7 ///88 1/)f/88 / /88

1 Mr. Henry E. Bliss Byron Station Comonwealth' Edison Company Units 1 and 2 cc:

Mr. William Kortier Regional Administrator, Region III Atomic Power Distribution V. S. Nuclear Regulatory Westinghouse Electric Corporation Comission Post Office Box 355 799 Roosevelt Road, Bldg. #4 Pittsburgh, Pennsylvania 15230 Glen Ellyn, Illinois 60137 Michael Miller, Esq. Mr. Michael C. Parker, Chief Sidley and Austin Division of Engineering One first National Plaza Illinois Department of Chicago, Illinois 60603 Nuclear Safety 1035 Outer Park Drive Springfield, Illinois, 62704 Mrs. Phillip B. Johnson 1907 Stratford Lane Joseph Gallo, Esq.

Rockford, Illinois 61107 Hopkins and Sutter Suite 1250 Ms. Lorraine Creek 1050 Connecticut Avenue, N.W.

Rt. 1, Box 182 Washington, D. C. 20036 Mantenc, Illinois 60950 Douglass Cassel, Esq.  !

Or. Bruce von Zellen 109 N. Dearborn Street Department of Biological Sciences Suite 1300 Northern Illinois University Chicago, Illinois 60602 DeKalb, Illinois 61107 Ms. Pat Morrison Mr. Edward R. Crass 5568 Thunderidge Drive-Nuclear Safeguards & Licensing Rockford, Illinois 61107 Sargent & Lundy Engineers '

55 East honroe Street Attorney General 1 Chicago, Illinois 60603 500 South 2nd Street Springfield, Illinois 62701 l U. S. Nuclear Regulatory Comission Byron / Resident Inspectors Office's. Chaiman, Ogle County Board 4448 North Geman Church Road Post Office Box 357 Byron, Illinois 61010 Oregon, Illinois 61061 l

ESI Review Coordinator Environmental Protection Agency Region V 230 S. Dearborn Street j Chicago, Illinois 60604 i Coninonwealth Edison Company Byron Station Manager 4450 North Geman Church Road Byron, Illinois 61010