np '_
.
JUL 0 71988
Docket No. 50-219'
GPU Nuclear Corporation:
ATTN: Mr. Eugene E. Fitzpatrick
Vice President and Director
Oyster Creek Nuclear Generating Station
P. O. Box 388-
Forked River, NJ 08731
Gentlemen:
Subject:
Inspection 50-219/88-11
This refers to your letter dated June 9,1988, in response to our letter dated
May 13, 1988.
Thank you for informing us of the corrective and preventive actions documented
-in your: letter. These actions will be examined during a future inspection of
your licensed program.
~
Your cooperation with us is appreciated.
Sincerely,
. Original Signed By:
Ronald R. Scliamy
Ronald R. Bellamy, Chief
V
Facilities Radiological Safety
and Safeguards Branch
Olvision of Radiation Safety
and Safeguards
cc:
M. Laggart, BWR Licensing Manager
Licensing Manager, Oyster Creek
Public Document Room (POR)
'"
Local Public Documut Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
0FFICIAL RECORD COPY
RL GPU 88-11 - 0001.0.0
t
'
06/24/88
8807250243 000707
0 f=
ADOCK 05000219
q
-
g [,
Q
PNU
.
-
.
..
.-
-
-
- - -
_-
.
.
GPU Nuclear Corporation
2
JUm 0 7 1988
.
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Cliief, ORP
.
Robert J. Bores, DRSS
RI:0RSS
RI:DRSS
RI:DRSS
Sherbini/ejr
Shanbg
Bellamy
6/yc/88
1///88
/ I /88
0FFICIAL RECORD COPY
RL GPU 88-11 - 0002.0.0
06/24/88
1
.
.
.
.
,
.
GPU Nuclear Corporation
- Nuclear
- = r 388
Forked River, New Jersey 08731-o388
609 971 4000
Writer's Direct Dial Number:
'
Jur.e 9,1988
Mr. Ronald R. Bellamy
Facilities Radiological Safety and Safeguards Branch
Division of Radiation Safety and Safeguards
U.S. Nuclear Regulatory Commission
475 Allendale Road
King of Prussia, PA 19406
Dear Mr. Bellamy:
Subject: Oyster Creek Nuclear Ger,erating Station
Docket No. 50-219
Inspection Report 88-11
Response to Notice of Yiolation
As directea by the subject inspection report dated May 13, 1988, Attachment I
provides our response to the Notice of Violation.
We would like to emphasize
that this violation was self-identified.
In addition to this response, GPUN
will submit under separate cover letter, additional comments and
clarification in regard to items in the body of the inspection reporc.
Should you require any further information, please contact Brenda DeMerchant,
Oyster Creek Licensing Engineer at (609)971-4642.
3ry truly yours,
a.A
fa.
. E. Fitzpat
ice Presiden and Director
Oyster Creek
EEF/BD/dmd
(0509A)
l
cc: Mr. William T. Russell, Administrator
Region I
U.S. Nuclear Regulatory Connission
475 Allendale Road
King of Prinsia. PA 19406
4 U e m.v r d. U e:: :r . :
's & r
, ,q:.
,
>>N
UUSVli
i' O il ?*
U. "i ib.
Divis-
' "
a: : c:
ac-
.
Washington, su cuoco
NRC Resident Inspector
Oyster Creek Nuclear Generating Station
l
l
GP,U Nuclear Corporatgis a subsidiary of the General Public Utilities Corporation
9g
1
ouvva.OVO\\J-
3PP
.
.
-
.
.
.
.
ATTALHMENT I
Violation:
10 CFR 20.201(b) requires that each licensee make such surveys as may be
necessary to comply with all sections of Part 20. As defined in 10 CFR 20.201(a), "survey" means an evaluation of the radiation hazards incident
to the production, use, release, disposal, or presence of radioactive
materials or other sources of radiation under a specific set of
conditions.
Contrary to the above, during the period of February and March 1968,
several workers entered the drywell torus room and worked in areas in
which the radiation . fields had not been properly surveyed to ensure
compliance with 10 CFR 20.201 and 10 CFR 20.202.
The dose rates in the
work area were later found to be higher than expected.
This resulted in
radiation exposures to unmonitored areas of the workers bodies that were
higher than expected.
Recponse:
GPUN concurs with the finding stated in the Notice of Violation and
wishes to again point out that this item was identified during our own
investigation.
This investigation was precipitated by the discovery,
during our daily assessment of SRD exposure readings, that worker
exposures were higher than expected.
Listed below is the reason for the
violation, the completed and planned corrective steps and the date when
full compliance will be achievea.
Reason for the Violation:
The Radiological Controls Technician on the job improperly assessed the
radiation fields as beiag fairly uniform to all major portions of the
whole body in the work area, and thereby concluded it was only necessary
to document general area radiation levels. However, radiation levels
were, in fact, nonuniform and were discovered to be significantly higher
to the head and thigh regions of individuals in some portions of the work
area than expected based on general area radiation levels.
Corrective Steps Taken and Results Achieved:
Upon oiscovering nonuniform radiation fields, work was stopped and an
,
exposure assessment was performed for all individuals who had worked in
~
the area.
Worker exposure records were adjusted accordingly.
No
4,n.;i; h ;'J o. on "=mres had occurred.
Requirements for de & a ry on
ti+ head and thgb q :ra o7 Ni tideais anu is c:*4fication cf
- 4hological Ccatrue s 9pervisin aM Ero .-
ina
r.c.e event periodic
9'J r%:~ J S e Wd i ( Ba gry it h,i; J ter, t i f dr-
' ;a ,
y, v ? >eirn (stahl'shed for
e
taris of radi nion
.@.!ewent wo,L
Bi; casui ted 1.i in :me
'
.
expvaures to workers in the area.
T..
- na. r. Jual ..t.a pericrrceo the
survey (a contractor) is no longer employed at Oyster Creek.
. .
. _ _ _ _
.
..
'
-2-
-
is
..
, ,
.
.
Corrective Steps to Avoid Further Violation:
The Radiation Controls Department is performing a root cause evaluation
in. order to establish appropriate long term corrective actions.
The
evaluation and corrective action imple'aentation schedule will be
completed by June 30, 1988.
Date of Full Compliance:
Measures to achieve full compliance for the specific task, drywell torus
room cathodic. protection were completed on April 19, 1988.
Programmatic
efforts designed to prevent similar items of noncompliance in the future
will be scheduled by June 30, 1988. These efforts will be completed
prior to August 30, 1988 and will be available for NRC review.
!
.
.