Monthly Operating Rept for Sept 1979
ML20150F353
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 10/03/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML19253B536 List:
References
NUDOCS 7910160380
Download: ML20150F353 (8)


Text

7 l

OPERATING DATA REPORT l

DOCKET rJO. 50-266 19)g3g0 3 DAW

%to w 3, M COMPLETED DY SOL DURSTEIN TELEPilONE 414 277 2121 OPERATING STATUS

1. UNIT NAMEt POINT BEACH NUCLEAR PLANT UNIT 1

. NOTES e'

2. REPORTING PERIOD: SEPTEMDER 1979
3. LICENSED THERMAL POWER (MWT)I 1518.
4. NAMEPLATE RATIt4G (GROSS MWE)3 523.3
5. DESIGN ELECTRICAL RATING'(NET MWE):

497.

i G. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

519.

O

7. MAXIMU?t DEPENDABLE CAPACITY (tlET MWE)!

495.

O. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGli 7) SItJCE LAST REPORTe GIVE REASONS:

NOT APPLICADLE g

9. POWER LEVEL TO WilICil RESTRICTEDe IF ANY (tJET MWE)!

NOT APPLICAULE t 10. REASOtJS FOR RESTRICTIONSe (IF ANY)3 NOT APPLICADLE 6

THIS MONTil YR TO DATE CUMULATIVE J

11. liOURS IN REPORTItJG PERIOD 720 6ebS1 78e023
12. NUttBER OF HOURS REACTOR WAS CRITICAL 697.5 Se943.7 65e831.6 L
13. REACTOR B'ESERVE SilUTD3WN llOURS 2.5 6.1

'445.7

14. IlOURS GENERATOR ON LINE 685.7 Se893.4 63e830 4
15. UNIT RESERVE SiluTDOWt1IlOURS 2.1 6.3

.389b

16. GROSS TlIERMAL ENERGY GEt4ERATED (MWtO le026e915 8e737e534 90e104e149
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 348,290 2e991e320 30,418e960 w
18. t4ET ELECTRICAL, ENERGY GENERATED (MWH) 332e647 2e858e73.3 28,993e487
19. UNIT SERVICE FACTOR 95.2.

90.0 81.8

20. UNIT AVAILABILITY FACTOR 95.5 90.1 82.3
21. UtJIT CAPACITY FACTOR (USING MDC NET) 93.3 83.2 76.4
22. UNIT CAPACITY FACTOR (USIt4G DER t4ET) 93.0 87.8 74.8
23. UNIT FORCED OUTAGE RATE 0.0 5.7 3.2
24. SituTDOWNS SCHED0t.ED OVER t4 EXT 6 MONTHS (TYPEe DATEe At40 DURATIOt3 OF EACIO 3 Refeling shutdown scheduled for October 5,19'19, to last approxicotely five weeks.
25. IF EHUTDOwt1 AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP:

NOT SHUTDOwt1 DATA REPORTED AND FACTORS CALCULATED AS REOUESTED It1 tJRC LETTER DATED SEPTEMut:R 22e 1977 2 9 sop o 3Erc)

I OPERATING DATA REPORT DOCKET No. 50-301 DATE october 3, 1979 COMPLETED DY SOL DURSTEIN TELEPl10NE 414 277 2121 OPERATING STATUS

1. UNIT NAME POINT DEACil NUCLEAR PLANT UNIT 2

. NOTES

2. REPORTING PERIODI SEPTEMDER 1979
3. LICENSED TitERMAL POWER (MWT)!

1518.

4 NAMEPLATE RATING (GROSS MWE)I S23.8 S. DESIGN ELECTitICAL RATIt4G (NET MWE)!

497.

6. MAXIMUM DEPENDADLE CAPACITY (GROSS MWE)!

S19.

7. HAXIMUM DEPEtJDADLE CAPACITY (NET MWE)3 495.

C. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS tJUMBER 3 THROUGil 7) SItJCE LAST REPORTe GIVE REASONS!

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTE0e IF At4Y (tJET MWE)1 NOT APPLICAULE
10. REASONS FOR RESTRICTIONSe,IF ANY)I tJOT APPLIC ABLE

(

THIS Mot 4Til YR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720 6ebbi

'62,8'8 0

12. NUMDER OF HOURS REACTOR WAS CRITICAL
13. REACTOR. REGERVE SHUTGOWr4 HOURS

~

713.8 Se602.3 56e691.4 6.2 16.1 165.7

14. HOURS GEt4ERATOR Ort lit 4E 705.8 SeS27.8 55e522.6
15. UtJIT RESERVE SilUTDOWilll0URS 1.2 18.6 106.4
16. GROSS THERMAL Et4ERGY GENER ATED (MW)0 1e032e935 8e108eu35 74e394e052
17. GROSS ELECTRICAL EtJERGY GENER ATED (MWill 354e650 2e782e710 2Se257e820
18. NET ELECTRICAL Et4ERGY GENLRATED (Mwill 338e371 2e6S3e397 24e021e074
19. Ut4IT SERVICE FACTOR 98.0 84.4 88.4,
20. UtJIT AVAILADILITY FACTOR 98.2 84.7 86.6
21. Ut4IT CAPACITY FACTOR (USING MDC TJET) 94.9 81.8 78.1
22. UNIT CAPACITY FACTOR (USItJG DER NET) 94.6 81.S 77.0
23. UtJIT FORCED OUT AGE RATE 0.0 0.0 1.5 24 SituTDowtJS SCilEDULED OVER t4 EXT 6 !!ONTHS sIYPEe DATEe At4D DUR ATIOtt JF E ACIH !

Refueling shutdown scheduled for March 7, 1980, to last approximately five weeks.

25. IF SHUTDOWri AT Et40 O'F REPORT PERIOO. ESTIMATLD DATE OF STARTUP!

f40T SiluTDOWid DATA REPORTED At40 F ACTORS CALCin.ATED AS REQUESTED If 4 (JRC I ETTER DATED SEPTEMUER 2de 1977

f UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 REPORT MONTil September, 1979 COMPLETED o

s ei TELEPilONE

.414/277-2121 "u

c.

u tn o o

R2 "c

3R Yo "n

~ o au o

=0 e e va co No.

Date g

eg jgg Licensee Event y

g'g Cause and Corrective Action m

b

s::

o v.c Report No.

<n EU To Prevent Recurrence Q*

8%

o U2 c o

k u

g O

6 790829 S

34.3 A

1 79-013/0lT-0 CB IITEXC)

Unit shutdo..

to repair a '324 gallon per day primary-to-secondary leak in the "A" steam generator.

1 F: Forced Reason:

Method:

Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) 1-Manual tions for Pfepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C-Refueling 3-Automatic Scram Sheets for LER File D-Regulatory Restriction 4-Other (explain)

(NUREG-0161)

E-Operator Training & License Exam F-Administrative 5

AD-283 Exhibit I-Same

.(01-78)

- G-Operational Error (explain)

Source 11-Other (explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET !!O. 50-301 UNIT NAME Point Beach Unit 2 DATE October 3, 1979 REPORT MONTil September. 1979 COMPLETED BY Sol Burstein TELEPilONE 414/277-2121 m

La a*

W tn o M

32 "a

"B B*e in

~ o a se o

  • o u e ao cc No.

Date g

ng jgg Licensee Event gg y

cause and Corrective Action m

s

s :c e

u.c Report No.

m Eo To Prevent Recurrence o~

sc c u2 5:

o

C 3

o o

5 790929 S

14.2 B

1 79-007/0lT-0 IIJ VALVD Unit shutdown tc repair "D"

moisture separator drain valve.

While shutting down, the "B" main steam isolation valve packing had to be loosened before it would fully close, resulting in LER 79-007/01T-0.

1 F: Forced

' Reason:

3 4

Method:

Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) 1-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C-Refueling 3-Automatic Scram Sheets for'LER File D-Regulatory Restriction 4-Other (explain)

(NUREG-0161)

E-Operator Training & License Exa F-Administrative 5 Exhibit I-Same AD-28B G-Operational Error (explain)

Source

.(01-78) 11-Other (explain)

DOCKET NO.

50-266 UNIT.NAME Point Bearh 11n i t 1 DATE October 3.

1979 COMPLETED BY Sol nurstein TELEPHONE 414/277-2121 AVERAGE DAILY UNIT POWER LEVEL MONTH September, 1979

  • AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

- 10 11 487 21 489 2

211 12 488 22 489 3

488 13 487 23 489 4

486 14 487 24 489 5

489 15 487 25 490 6

488 16 487 26 488 7

488 17 487 27 489 8

488 18 489 28 489 9

485 19 487 29 487 10 489 20 488 30 485-31 AD-28A (1-77)

-~

DOCKET NOo 50-301 UNIT NAME Point Beach Unit 2 DATE October 3, 1979 COMPLETED BY Sol Burstein TELEPHONE 414/277-2121 AVERAGE DAILY UNIT POWER LEVEL MONTH September, 1979

  • AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

500 11 493 21 468

]

2 490 12 494 22 480 3

- 452 13 493 23 467 p

I 4

485 14 494 24 479 I

5 495 15 460 25 493 6

494 16 441 26 493 7

493 17 476 27-490 8

495 18 486 23 489 9

474 19 474 29 113 10 495 2D 469 30 474 31 AD-28A

~

(1-77)

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-266 Unit Name Point Beach Unit 1 Date October 3, 1979 Completed By Sol Burstein I

Telephone 414/277-2121 l

Unit 1 was base loaded for.100% of the period after returning to the line on September 2, 1979.

The unit had l

been shutdown for steam generator leakage repair on l

August 29, 1979.

A Point Beach' Nuclear Plant record time i

of three days and 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> for a steam generator tube repair outage was set when the unit was returned to the line on September 2, 1979.

The use of mechanical plugs played an important role in setting the new record.

The leaking tube, at location R20C37 in the "A"

steam generator, was found upon reanalysis of a previous eddy current test to have had an 88% defect at that time, the defect being very difficult to discover however behind a very noisy signal.

A second tube at R7C44, this with a 31% defect, was also plugged as a conservative measure.

Core stretch operation commenced on September 26, 1979.

Licensee Event Report No. 79-14/03L-0 reported the discovery of a fine crack in the Unit 1 "B" charging pump I

block between the Nos. 1 and 2 cylinders. The cracked block was replaced with a new sp'are, and the pump was returned to service.

Two charging pumps were available at all times as required by the Technical Specifications.

Twenty-eight (28) new fuel assemblies have been received, inspected and placed in the spent fuel pit in readiness for refueling.

Work is continuing on IE Bulletins 79-02, anchor bolt inspection,and 79-14, seismic analysis for as-built safety-related piping systems. Work began on IE Bulletin 79-17, inspection of lines containing stagnant borated water.

No other major safety-related maintenance vas performed I

during the period.

l

6 o

1 I

NARRATIVE

SUMMARY

OF OPERATING EXPERIEMCE i

Docket No.

50-301 l

Unit Name Point Beach Unit 2 Date' October 3, 1979 Completed By Sol Burstein Telephone 414/277-2121 Unit 2 was base loaded for approximately 78% of the ceriod with one shutdown and 12 load reductions.

The unit was shutdown for fourteen (14) hours on l

September 29, 1979, to repair the "D" moisture separator reheater drain valve.

The valve had been malfunctioning, causing intermittent low feedwater supply pressure at the suction of the feed pumps.

This problem had previously I

necessitated reducing load to 475 MWe for a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> period l

September 19-20, 1979.

i Power Supply requested on ten occasions that load be reduced to an average of 385 MWe for an average duration of four hours each.

Load was reduced to 345 MWe for four hours on September 9, 1979, to conduct turbine stop valve tests.

The unit generated its 25 billionth kilowatt-hour of electricity on September 8, 1979.

2 During the shutdown for moisture separator drain valve repair on September 29, 1979, the "B" main steam isolation valve failed to close upon demand with approximately 201 steam flow.

Tne packing was loosened, the valve then closing.

Past experience indicates that the reverse type check valve I

would have closed in high steam flow conditions.

Licensee Event Report No. 73-007/01T-0 wan filed on this event.

J Work is continuing on IE Bulletin 79-02, anchor bolt irspection, 79-14, seismic analysis for as-built safety-i related piping systems.

Work began on IE Bulletin 79-17, inspection of lines containing stagnant borated water.

l No other major safety-related maintenance was performed i

during the period.