Text
,
.
-
'
gh"".,;
g -
.i
UNITED STATES
,
~
/
'
NUCLEAR HEGULATORY COMMISSION
.,
'
! '* .
-
j' \\
.;c
-
nAssisoros o c rosss
a
-.
N ....../
'
.~
.
.
-
January 6, 1988
,
I
i
NOTE T0:
FROM
Frederick Combs
SUBJECT:
HENRY MYERS' COMMENTS ON INSPECTION REPORT
i -
50-327/87-31 AND 50-87/87-31
The attached coments.were provided to John Bradburne in a telephone
discussion with Dr. Myers on December 17,
.
(
/l
V
.
.
,
e
d
=
880624
$
g 9.-59
'
.
. .
-
-
--.
- - -
-
,
'
'
-2-
.
.
f
DR HENRY MYERS' COMMENTS ON INSPECTION FIFORT
50-327/87-31 and 50-328/87-31
,
The following comments on the subject inspection report on the TVA's
Design Baseline and Verification Program (DBVP) for the Sequoyah Nuclear
Power Plant were provided by Dr. Henry Myers of the House Interior
CannitteetStaff to Ccngressional Affairs. The comments are keyed to the
indicated secticas of the report and its cover letter.
As a general corrent, the report declares that prcblems are resolved
without supporting that declaration. Also, the report dces not spell out
things like DVBP.
(1) Two qualifications are not spelled out or defined
(2) Oces this ser.tence say that the NRC approves the report?
(3) Was the purpose of the inspection achieved? (See page 1 of report,
,
the first two sentences under 2. purpose.)
(4) 4.1 Operations
4.2 Mechanical Systems
4.3 Mechanical Components
4.4 Nuclear Engineering
4.5 Electric Power
4.6 Instrumertation and Control
4.7 Civil / Structural Engineering
- See dupli: ate paragraphs on pages 3 and 4.
Is the page 4 paragraph out
of order?
- All of the summary is out of order.
- Is the paragraph at the top of page a talking atcut all or part of
Sequoyah? In essence, are all paragraphs talking about all of Sequoyah or
'
just the particular subject covered?
- Does "closed" mean satisfactorily handled?
(Page 5) *** Does this mean no deficiencies at all?
(5) Does this mean they are fixed?
(6) (page 2) Does this mean "operations of the plant" or "operations of the
DBVP7"
l
r
.
-i
,
-3-
4
.
(7) (page 6) This is a major itee.
(8)(page7) Problem
(9) (page 8) What is a "non-administrative change?"
o
(10) (page 8) Do not "implement" a punch list items. You address the
problems on the punch list and then solve the problems pointed out by the
punch list. Henry believes that the report could be saying that the
problems were addressed but not solved.
(11) (page 12) 357 action items and no way to determine if the deficiercy
is really fixed.
Inspection report does not indicate if things are being
fixed.
(12)AskHaroldwhathethinksoftheproblemsonpage 12, 13, 14 and 15
'
(notallindetail).
DBVP did not find them but the EA found them.
No
/
indication' that problems are being resolved.
(13) (page 15) What is "the project" and is acceptable to do calculations
after restart?
(14) (page 16) What are these documents?
It would be helpful for a one or
two line description on each one.
(15) (page 17) Does this mean that EA only reviewed three punch list items?
(16) General (page 16-17) There is a lack of seismic calculations to
confirm assumptions.
,
(17) (page 17 and 18) Section 4.2.4 is confusing.
(18) (page 25) What problems were reviewed? What did TVA do to resolve
them?
(19) (page 25) needs a look
(20)(page29) Calculation 870223 was the basis for cancelling the
variance. Does 86118 mean it was done befoce 870223?
Is this an
error-should 86118 be 860118 or is TVA pulling something?
(21) (page 31) The punch list review shows that errors were found.
Is this
falsifications? Who will confins a fix here?
(22) (page 31) Disagrees with the last sentence because there is no
substantiation of the claims.
(23) (page 31) "As built" verification did not appear in the IDI report on
ERC.
Henry says the process is too corplicated to be handled by Ebnetter-and
certainly too complex to be handled by the Commission. He feels that
Sequoyah and TVA are generally worse than Zimer.
-
_. .-
-
-.
-.
.-
.
. - _
.
__.
.
UNITED STATES
%,,
NUCLEAR REGULATORY COMMISSION
^
["
,,
g
W ASH:NQToN, D. C. 20666
-
t
%
% , , , , , /j
DEC 3
1987
00cket Nos. 50-327
and 50-328
Tennessee Valley Authority
ATTN:
Mr. S. A. White
Manager of Nuclear Puwer
6N 3SA Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
INSPECTION REPORT NOS. 50-327/87-31 AND 50-328/87-31
This' letter forwards the results of a special inspection of TVA's Design
Baseline and Verification Program (OBVP) for the Sequoyah Nuclear Power
Plant, conducted at the plant site and in your Cedar Bluffs Offices between
June 29 and July 24, 1987.
The NRC inspection team was comprised of a multi-
discipline team of personnel from the Office of Nuclear Reactor Regulation
from consulting firms, and from the Region II Office.
The team concentrated on
the resolution and corrective action for the findings of the OBVP.
The team
also reviewed the corrective actions resulting from independent oversight of
this program by TVA's Engineering Assurance group and evaluated TVA's actions
in response to previous NRC design control and OBVP inspection reports.
internal reports (1) EA-OR-001, Engineering Assurance Oversight Review Report,
"Sequoyah Nuclear Plant - Unit 2 Design Baseline and Verificatico Program,"
dated April 29, 1987, and (2) the SQN OBVP Unit 2 Phase I report, dated May 29,
1987, characterize the program, its findings, and the Engineering Assurance
oversight effort.
These reports were also revjewed during this inspection.
to
As a result of the inspection, the NRC team conp"luded that the DBVP was generally
conducted in accordance with the program plan.TImplementation by both OBVP
personnel and the Engineering Assurance oversight group appears to have been
adequate in g instances sampled by the inspection team within the scope of
the program areas inspected to date.
(? As noted in the report, implementation of corrective actions f(or OBV
.t
~
'
<
was still in progress at the time of the inspection, as was Engineering
Assurance _{Fa) mjQing and verification of irrolamenta1Tonfiye note that a
'
supplemental r.tILort acaressing tA oversight of the DBVP has-teen submitted to
p (R.> h letter _d_ Ate _d_0cichtr.33 _1M LL
In arder for_the NRC t_o
assess the adeqincy of the_DEVP ef fort to support DJant_r_estart, the supplemen-
taWineerieg-Assurance-Oversicht ReILoQns to be reviewed by the NRC-'
Results of the inspection are presented in the ent:losure.
--
-
7
i
..[
.
.
Tennessee Valley Authority
-2-
C-Ci
1337
"
'TVA provided a written response (R. Gridley letter dated October 27,1987)
addressing the observations identified in Appendix A of the enclosec report in
advance of the issuing of this report.
The substance of these observations had
been communicated verbally to TVA during the inspection.
An additienal NRC
inspection (Report 327, 328/87-64) was conducted on October 26-30, 1987.
This
subsequent inspection addressed many of the open observations addressed in the
enclosed report.
The NRC's evaluation of your response to this letter .<ill be
documsnted in inspection report 327, 328/87-64.
Any observations remaining
open at restart will require an evaluation of acceptability for suc
estart by
both TVA and the NRC.
In accordance with 10 CFR 2.790(a), a copy of this letter and the erclosure will
be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, please co tact me or
Mr. Gene Imbro, (301) 492-9664.
,
Sincerely,
.Y
,
- M g/
(,
Stewart D. Ebneter, Directo-
TVA Projects Staff
Office of Special Projects
Enclesure:
Inspection Report 50-327/87-31
and 50-328/87-31
cc w/ enclosure:
See next page
.
- . ,
, _ . - - -
- _ -
-_ _ _ - . - _ ,
- , . . - - - - - . . , - . - - - - - - - - - - - , .
- - - - - - . - - - - -
-
--.
--
.
.
Tennessee Valley Authority
-4-
DEC 3, 1987
~
Distribution: (w/ enc 1)
DC5 (Docket No. 50-327/328)
POR
LPOR
DRIS Reading
SIB Reading
EV!mbro, NRR
BKGrimes, NRR
JGPartlow, NRR
-
REArchitzel, NRR
SEbneter , OSP
JAxelrad, OSP
SRichardson, OSP
GZech, OSP
BOLiaw, OSP
FMcCoy, RII
KBarr, R!!
BBHayes OI
SRConnelly, OIA
ELJordan, AE00
InspectionTeam(8)
JFair, OSP
Resident Inspector
OGC-Beth
Central Files
OSP Reading
FMiraglia
~
ACRS (10) da
TVA-Bethes
.
[
\\
/
OFC
- NRR:DRI5:5I
- NRR:DRIS IB :hR :DRI :5I8:00-
/ :D:
/
- DD:IVA
- D:TVA .
,
j..........g...............
i d.../.... partlow
- SRichardson :50Ebne:e
.....:.......... ..:......... ...:... . .....:. .
NAME :REArchi tzel
- EV'mbro A :CJH ghney :
-
.
.....:..............:.............:..........:...........:..................................
.D. ATE :11/f /87
- 11///87
/
7
- 11// /87
- 11/4/87
- 11/W/87
- ll/A '!'
,
7
_
_
. -
. .
. _ _ _ . _ _ _ _ _ _
._
. .
.
. .
. . . .
. .
-
.
-
y
w
f
.
Mr. S. A. White
Tennessee Valley Authority
Sequoyah Nuclear Plant
ec:
General Counsel
Regional Administrator, Region il
Tennessee Valley Authority
U.S. Nuclear Regulatory Comission
400 West Sumit Hill Drive
101 Marietta Streat, N.W.
Atlanta, Georgia '30323
E11 833
Knoxville, Tennessee 37902
Resident inspector /Secuoyah NP
Mr. R. L. Gridley
c/o U.S. Nuclear Regulatory Comission
Tennessee Valley Authority
2600 Igou Ferry Road
SN 157B Lookout Place
Soddy Daisy, Tennessee
37379
Chattanooga, Tennessee 37402-2801
Mr. Richard King
Mr. H. L. Abercrombie
e/o U.S. GAO
Tennessee Valley Authority
1111 North Shore Drive
Sequoyah Nuclear Plant
Suite 225 Box 194
P.O. Box 2000
Knoxville, Tennessee 37919
Soddy Daisy, Tennessee 37379
Tennessee Department of
Mr. M. R. Harding
Public Health
Tennessee Valley Authority
ATTN: Director, Bureau of
Environmental Health Services
Sequoyah Nuclear Plant
P.O. Box 2000
Cordell Hull Building
Soddy Daisy, Tennessee 37379
Nashville, Tennessee 37219
Mr. D. L. Williams
Mr. Michael H. Mobley, Director
Tennessee Valley Authority
Division of Radiological Health
400 West Sumit Hill Drive
T.E.R.R.A. Building
150 9th Avenue North
.
W10 BE
Knoxville, Tennessee 37902
Nashville, Tennessee
37203
Dr. Henry Myers, Science Advisor
County 'udge
Hamilton County Courthouse
Comittee on interior
Chattanooga, Tennessae 37402
and Insular Affairs
U.S. House of Representatives
Washington. D.C.
20515
!
I
_ _ . . . . . _ .
_ . .
- _ _ _ _ _ _ .
. . _ - . , . _ _ _ _ _ _ , . _ _ _ _ . . _ - . . . _ . . . _ , . _ . _ _ _ . _ _ . . _ . _ . _ . _ _ _ _ , _ _ _ _ _ _ . _ _ , _ _ . _ _ _ _ _ _ _ _ _ . . _ _
.
.
U.S. NUCLEAR REGULATORY COMMISSION
'
0FFICE OF NUCLEAR REACTOR REGULATION
Division of Reactor Inspection and Safeguards
Report Nos.:
50-327/87-31, 50-328/87-31
Docket Nes.:
50-327; 50-328
Licensee:
Tennessee Valley Authority
6N 38A Lookout Place
1101 Market St. ~
Chattanooga, TN 37402-2801
Facility Name:
3equoyah Nuclear Plant, Units 1 & 2
inspection At:
Cedar Bluffs and Soddy Daisy, TN
Inspection Conducted: June 29-July 2 and July 20-24, 1987
Inspection Team Members:
Team Leader:
R. E. a"Wzel, Senior Operations Engineer, NRR
Mechanical Systems:
F. J. Mollerus, Consultant, Mollerus Engineerfrg Inc.
Nuclear Engineering
J. A. Nevshemal . Consultant *
Mechanical Components:
A. V. du Bouchet, Consultant
'
Civil / Structural:
A. I. Unsal, Consultant, Harstead Engineering
Electrical Power:
S. Y. Athavale, Electrical Engineer, NRR*
Instrumentation &
Control:
L. E. Stanley, Consultant, Zytor Inc.
Operations:
P. E. Harmon, Resident Inspector, Sequoyah
H. E. Bibb, Resident Inspector, St. Lucie NPP*
/d
87
Ralph E. Architzel
'
Da te
!
Team Leader
!
$Y
Y
/9///// 7
Eugene V. Imbro
'
Date
-
-
Section Chief
Team Inspection Appraisal and Development Section 42
Special Inspection Branch
_
,
- 6/29-7/2/87 oni
!
i
.
I
N
.
LIST OF ABBREVIATIONS
auxiliary building gas treatment system
CAQR
concition adverse to quality report
centrifugal charging pump
CCRIS
Calculation Cross Reference Information System
come:nent cooling water system
CEB
Civil Engineering Branch
CFR
Code of Federal Regulations
OBVP
Design Baseline and Verification Program
design change request
DES
Discipline Evaluation Supervisor
DIM
design input memorandum
Division of Nuclear Engineering
Engineering Assurance
engineering change notice
.
EEB
Electrical Engineering Branch
essential raw cooling water system.
- FCH
field change notice (Westinghouse)
FCR
field change request
Final Sa' sty Analysis Report
.
high pressure fire protection
heating, ventilation, and air conditioning
.
instrumentation and control
IEEE
Institute of Electrical and Electronics Engineers
local design change request
loss of coolant accident
MEB
Mechanical Engineering Branch
MI
maintenance instruction
&
nonconformance report
NEB
Nuclear Engineering Branch
net positive suction head
i
NRC
Nuclear Regulatory Commission
nuclear steam supply system
.
oversight review
,
\\
i
PGCE
potential generic condition evaluation
i
problem identification report
PL
punchlist
l
'
- . . _ _ _ _
_ _ ._ _ _ _ _ _ _ . ___
_ _ . _ - . .
.
_ _ .
..
'
<
,
.
.
QIR
quality information report
RIMS
records information management system
significant condition report
System Engineer
surveillance instruction
SQR-
Static-0-Ring
SQEP
Sequoyah Engineering Procedure
Sequoyah Nuclear Plant
SWBIO
system walkduwn boundary identification drawing
SYSTER
System Evaluation Report
TACF
temporary alteration control form
Tennessee Valley Authority
USQD
unreviewed safety question determination
WOP
walkdown package
WP
work package
work request
zero period acceleration
,
.
-