Forwards H Myers Comment on Insp Repts 50-327/87-31 & 50-328/87-31
ML20150E676
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/06/1988
From: Combs T
NRC
To: Harold Denton
NRC
Shared Package
ML082401120 List:
References
FOIA-88-59, FOIA-88-60 NUDOCS 8807150246
Download: ML20150E676 (3)


See also: IR 05000327/1987031

Text

,

.

-

LI

'

gh"".,;

g -

.i

UNITED STATES

,

~

/

'

NUCLEAR HEGULATORY COMMISSION

.,

'

! '* .

-

j' \\

.;c

-

nAssisoros o c rosss

a

-.

N ....../

'

.~

.

.

-

January 6, 1988

,

I

i

NOTE T0:

Harold Denton

FROM

Frederick Combs

SUBJECT:

HENRY MYERS' COMMENTS ON INSPECTION REPORT

i -

50-327/87-31 AND 50-87/87-31

The attached coments.were provided to John Bradburne in a telephone

discussion with Dr. Myers on December 17,

.

(

/l

V

.

.

,

e

d

=

880624

$

g 9.-59

'

.

. .

-

-

--.

- - -

-

,

'

'

-2-

.

.

f

DR HENRY MYERS' COMMENTS ON INSPECTION FIFORT

50-327/87-31 and 50-328/87-31

,

The following comments on the subject inspection report on the TVA's

Design Baseline and Verification Program (DBVP) for the Sequoyah Nuclear

Power Plant were provided by Dr. Henry Myers of the House Interior

CannitteetStaff to Ccngressional Affairs. The comments are keyed to the

indicated secticas of the report and its cover letter.

As a general corrent, the report declares that prcblems are resolved

without supporting that declaration. Also, the report dces not spell out

things like DVBP.

(1) Two qualifications are not spelled out or defined

(2) Oces this ser.tence say that the NRC approves the report?

(3) Was the purpose of the inspection achieved? (See page 1 of report,

,

the first two sentences under 2. purpose.)

(4) 4.1 Operations

4.2 Mechanical Systems

4.3 Mechanical Components

4.4 Nuclear Engineering

4.5 Electric Power

4.6 Instrumertation and Control

4.7 Civil / Structural Engineering

- See dupli: ate paragraphs on pages 3 and 4.

Is the page 4 paragraph out

of order?

- All of the summary is out of order.

- Is the paragraph at the top of page a talking atcut all or part of

Sequoyah? In essence, are all paragraphs talking about all of Sequoyah or

'

just the particular subject covered?

- Does "closed" mean satisfactorily handled?

(Page 5) *** Does this mean no deficiencies at all?

(5) Does this mean they are fixed?

(6) (page 2) Does this mean "operations of the plant" or "operations of the

DBVP7"

l

r

.

-i

,

-3-

4

.

(7) (page 6) This is a major itee.

(8)(page7) Problem

(9) (page 8) What is a "non-administrative change?"

o

(10) (page 8) Do not "implement" a punch list items. You address the

problems on the punch list and then solve the problems pointed out by the

punch list. Henry believes that the report could be saying that the

problems were addressed but not solved.

(11) (page 12) 357 action items and no way to determine if the deficiercy

is really fixed.

Inspection report does not indicate if things are being

fixed.

(12)AskHaroldwhathethinksoftheproblemsonpage 12, 13, 14 and 15

'

(notallindetail).

DBVP did not find them but the EA found them.

No

/

indication' that problems are being resolved.

(13) (page 15) What is "the project" and is acceptable to do calculations

after restart?

(14) (page 16) What are these documents?

It would be helpful for a one or

two line description on each one.

(15) (page 17) Does this mean that EA only reviewed three punch list items?

(16) General (page 16-17) There is a lack of seismic calculations to

confirm assumptions.

,

(17) (page 17 and 18) Section 4.2.4 is confusing.

(18) (page 25) What problems were reviewed? What did TVA do to resolve

them?

(19) (page 25) needs a look

(20)(page29) Calculation 870223 was the basis for cancelling the

variance. Does 86118 mean it was done befoce 870223?

Is this an

error-should 86118 be 860118 or is TVA pulling something?

(21) (page 31) The punch list review shows that errors were found.

Is this

falsifications? Who will confins a fix here?

(22) (page 31) Disagrees with the last sentence because there is no

substantiation of the claims.

(23) (page 31) "As built" verification did not appear in the IDI report on

ERC.

Henry says the process is too corplicated to be handled by Ebnetter-and

certainly too complex to be handled by the Commission. He feels that

Sequoyah and TVA are generally worse than Zimer.

-

_. .-

-

-.

-.

.-

.

. - _

.

__.

.

UNITED STATES

%,,

NUCLEAR REGULATORY COMMISSION

^

["

,,

g

W ASH:NQToN, D. C. 20666

-

t

%

% , , , , , /j

DEC 3

1987

00cket Nos. 50-327

and 50-328

Tennessee Valley Authority

ATTN:

Mr. S. A. White

Manager of Nuclear Puwer

6N 3SA Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT:

INSPECTION REPORT NOS. 50-327/87-31 AND 50-328/87-31

This' letter forwards the results of a special inspection of TVA's Design

Baseline and Verification Program (OBVP) for the Sequoyah Nuclear Power

Plant, conducted at the plant site and in your Cedar Bluffs Offices between

June 29 and July 24, 1987.

The NRC inspection team was comprised of a multi-

discipline team of personnel from the Office of Nuclear Reactor Regulation

from consulting firms, and from the Region II Office.

The team concentrated on

the resolution and corrective action for the findings of the OBVP.

The team

also reviewed the corrective actions resulting from independent oversight of

this program by TVA's Engineering Assurance group and evaluated TVA's actions

in response to previous NRC design control and OBVP inspection reports.

TVA

internal reports (1) EA-OR-001, Engineering Assurance Oversight Review Report,

"Sequoyah Nuclear Plant - Unit 2 Design Baseline and Verificatico Program,"

dated April 29, 1987, and (2) the SQN OBVP Unit 2 Phase I report, dated May 29,

1987, characterize the program, its findings, and the Engineering Assurance

oversight effort.

These reports were also revjewed during this inspection.

to

As a result of the inspection, the NRC team conp"luded that the DBVP was generally

conducted in accordance with the program plan.TImplementation by both OBVP

personnel and the Engineering Assurance oversight group appears to have been

adequate in g instances sampled by the inspection team within the scope of

the program areas inspected to date.

(? As noted in the report, implementation of corrective actions f(or OBV

.t

~

'

<

was still in progress at the time of the inspection, as was Engineering

Assurance _{Fa) mjQing and verification of irrolamenta1Tonfiye note that a

'

supplemental r.tILort acaressing tA oversight of the DBVP has-teen submitted to

p (R.> h letter _d_ Ate _d_0cichtr.33 _1M LL

In arder for_the NRC t_o

assess the adeqincy of the_DEVP ef fort to support DJant_r_estart, the supplemen-

taWineerieg-Assurance-Oversicht ReILoQns to be reviewed by the NRC-'

Results of the inspection are presented in the ent:losure.

--

-

7

i

..[

.

.

Tennessee Valley Authority

-2-

C-Ci

1337

"

'TVA provided a written response (R. Gridley letter dated October 27,1987)

addressing the observations identified in Appendix A of the enclosec report in

advance of the issuing of this report.

The substance of these observations had

been communicated verbally to TVA during the inspection.

An additienal NRC

inspection (Report 327, 328/87-64) was conducted on October 26-30, 1987.

This

subsequent inspection addressed many of the open observations addressed in the

enclosed report.

The NRC's evaluation of your response to this letter .<ill be

documsnted in inspection report 327, 328/87-64.

Any observations remaining

open at restart will require an evaluation of acceptability for suc

estart by

both TVA and the NRC.

In accordance with 10 CFR 2.790(a), a copy of this letter and the erclosure will

be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, please co tact me or

Mr. Gene Imbro, (301) 492-9664.

,

Sincerely,

.Y

,

M g/

(,

Stewart D. Ebneter, Directo-

TVA Projects Staff

Office of Special Projects

Enclesure:

Inspection Report 50-327/87-31

and 50-328/87-31

cc w/ enclosure:

See next page

.

- . ,

, _ . - - -

- _ -

-_ _ _ - . - _ ,

- , . . - - - - - . . , - . - - - - - - - - - - - , .

- - - - - - . - - - - -

-

--.

--

.

.

Tennessee Valley Authority

-4-

DEC 3, 1987

~

Distribution: (w/ enc 1)

DC5 (Docket No. 50-327/328)

POR

LPOR

DRIS Reading

SIB Reading

EV!mbro, NRR

BKGrimes, NRR

JGPartlow, NRR

-

REArchitzel, NRR

SEbneter , OSP

JAxelrad, OSP

SRichardson, OSP

GZech, OSP

BOLiaw, OSP

FMcCoy, RII

KBarr, R!!

BBHayes OI

SRConnelly, OIA

ELJordan, AE00

InspectionTeam(8)

JFair, OSP

Resident Inspector

NSIC

NTIS

OGC-Beth

Central Files

OSP Reading

FMiraglia

~

ACRS (10) da

TVA-Bethes

.

[

\\

/

OFC

NRR:DRI5:5I
NRR:DRIS IB :hR :DRI :5I8:00-

/ :D:

/

DD:IVA
D:TVA .

,

j..........g...............

i d.../.... partlow

SRichardson :50Ebne:e

.....:.......... ..:......... ...:... . .....:. .

NAME :REArchi tzel

EV'mbro A :CJH ghney :

-

.

.....:..............:.............:..........:...........:..................................

.D. ATE :11/f /87

11///87

/

7

11// /87
11/4/87
11/W/87
ll/A '!'

,

7

_

_

. -

. .

. _ _ _ . _ _ _ _ _ _

._

. .

.

. .

. . . .

. .

-

.

-

y

w

f

.

Mr. S. A. White

Tennessee Valley Authority

Sequoyah Nuclear Plant

ec:

General Counsel

Regional Administrator, Region il

Tennessee Valley Authority

U.S. Nuclear Regulatory Comission

400 West Sumit Hill Drive

101 Marietta Streat, N.W.

Atlanta, Georgia '30323

E11 833

Knoxville, Tennessee 37902

Resident inspector /Secuoyah NP

Mr. R. L. Gridley

c/o U.S. Nuclear Regulatory Comission

Tennessee Valley Authority

2600 Igou Ferry Road

SN 157B Lookout Place

Soddy Daisy, Tennessee

37379

Chattanooga, Tennessee 37402-2801

Mr. Richard King

Mr. H. L. Abercrombie

e/o U.S. GAO

Tennessee Valley Authority

1111 North Shore Drive

Sequoyah Nuclear Plant

Suite 225 Box 194

P.O. Box 2000

Knoxville, Tennessee 37919

Soddy Daisy, Tennessee 37379

Tennessee Department of

Mr. M. R. Harding

Public Health

Tennessee Valley Authority

ATTN: Director, Bureau of

Environmental Health Services

Sequoyah Nuclear Plant

P.O. Box 2000

Cordell Hull Building

Soddy Daisy, Tennessee 37379

Nashville, Tennessee 37219

Mr. D. L. Williams

Mr. Michael H. Mobley, Director

Tennessee Valley Authority

Division of Radiological Health

400 West Sumit Hill Drive

T.E.R.R.A. Building

150 9th Avenue North

.

W10 BE

Knoxville, Tennessee 37902

Nashville, Tennessee

37203

Dr. Henry Myers, Science Advisor

County 'udge

Hamilton County Courthouse

Comittee on interior

Chattanooga, Tennessae 37402

and Insular Affairs

U.S. House of Representatives

Washington. D.C.

20515

!

I

_ _ . . . . . _ .

_ . .

- _ _ _ _ _ _ .

. . _ - . , . _ _ _ _ _ _ , . _ _ _ _ . . _ - . . . _ . . . _ , . _ . _ _ _ . _ _ . . _ . _ . _ . _ _ _ _ , _ _ _ _ _ _ . _ _ , _ _ . _ _ _ _ _ _ _ _ _ . . _ _

.

.

U.S. NUCLEAR REGULATORY COMMISSION

'

0FFICE OF NUCLEAR REACTOR REGULATION

Division of Reactor Inspection and Safeguards

Report Nos.:

50-327/87-31, 50-328/87-31

Docket Nes.:

50-327; 50-328

Licensee:

Tennessee Valley Authority

6N 38A Lookout Place

1101 Market St. ~

Chattanooga, TN 37402-2801

Facility Name:

3equoyah Nuclear Plant, Units 1 & 2

inspection At:

Cedar Bluffs and Soddy Daisy, TN

Inspection Conducted: June 29-July 2 and July 20-24, 1987

Inspection Team Members:

Team Leader:

R. E. a"Wzel, Senior Operations Engineer, NRR

Mechanical Systems:

F. J. Mollerus, Consultant, Mollerus Engineerfrg Inc.

Nuclear Engineering

J. A. Nevshemal . Consultant *

Mechanical Components:

A. V. du Bouchet, Consultant

'

Civil / Structural:

A. I. Unsal, Consultant, Harstead Engineering

Electrical Power:

S. Y. Athavale, Electrical Engineer, NRR*

Instrumentation &

Control:

L. E. Stanley, Consultant, Zytor Inc.

Operations:

P. E. Harmon, Resident Inspector, Sequoyah

H. E. Bibb, Resident Inspector, St. Lucie NPP*

/d

87

Ralph E. Architzel

'

Da te

!

Team Leader

!

$Y

Y

/9///// 7

Eugene V. Imbro

'

Date

-

-

Section Chief

Team Inspection Appraisal and Development Section 42

Special Inspection Branch

_

,

  • 6/29-7/2/87 oni

!

i

.

I

N

.

LIST OF ABBREVIATIONS

ABGTS

auxiliary building gas treatment system

AFW

auxiliary feedwater

CAQ

condition adverse to quality

CAQR

concition adverse to quality report

CCP

centrifugal charging pump

CCRIS

Calculation Cross Reference Information System

CCS

come:nent cooling water system

CEB

Civil Engineering Branch

CFR

Code of Federal Regulations

OBVP

Design Baseline and Verification Program

DCR

design change request

DES

Discipline Evaluation Supervisor

DIM

design input memorandum

DNE

Division of Nuclear Engineering

EA

Engineering Assurance

ECCS

emergency core cooling system

ECN

engineering change notice

.

EEB

Electrical Engineering Branch

ERCW

essential raw cooling water system.

- FCH

field change notice (Westinghouse)

FCR

field change request

FSAR

Final Sa' sty Analysis Report

.

HPFP

high pressure fire protection

HVAC

heating, ventilation, and air conditioning

.

I&C

instrumentation and control

IEEE

Institute of Electrical and Electronics Engineers

LOCR

local design change request

LOCA

loss of coolant accident

MEB

Mechanical Engineering Branch

MI

maintenance instruction

&

NCR

nonconformance report

NEB

Nuclear Engineering Branch

NPSH

net positive suction head

i

NRC

Nuclear Regulatory Commission

NSSS

nuclear steam supply system

.

OR

oversight review

,

\\

i

PGCE

potential generic condition evaluation

i

PIR

problem identification report

PL

punchlist

l

'

- . . _ _ _ _

_ _ ._ _ _ _ _ _ _ . ___

_ _ . _ - . .

.

_ _ .

..

'

<

,

.

.

QIR

quality information report

RCS

reactor coolant system

RHR

residual heat removal

RIMS

records information management system

SCR

significant condition report

SE

System Engineer

SI

surveillance instruction

SQR-

Static-0-Ring

SQEP

Sequoyah Engineering Procedure

SQN

Sequoyah Nuclear Plant

SSE

safe shutdown earthquake

SWBIO

system walkduwn boundary identification drawing

SYSTER

System Evaluation Report

TACF

temporary alteration control form

TVA

Tennessee Valley Authority

USQD

unreviewed safety question determination

WOP

walkdown package

WP

work package

WR

work request

ZPA

zero period acceleration

,

.

-