Forwards Insp Rept 50-285/88-07 on 880201-29 & Notice of Violation
ML20150E344
Person / Time
Site: Fort Calhoun 
Issue date: 03/25/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20150E345 List:
References
NUDOCS 8803310092
Download: ML20150E344 (2)


See also: IR 05000285/1988007

Text

{{#Wiki_filter:_

' ' , . . .%^ % MAR 251988 In Reply Refer To: Docket: 50-285/88-07 Omaha Public Power District ATTN: R. L. Andrews, Division Manager- Nuclear-Production 1623 Harney Street Omaha, Nebraska 68102 Gentlemen: This refers to the inspection conducted by Messrs. P. H. Harrell, T. Reis, and R. P. Mullikin of this office during the period February 1-29, 1988, of activities authorized by NRC Operatirg License DPR-40 for the Fort Calhoun Station,.and to the discussion of our findings with you and other members of your staff at the conclusion of the inspection. Areas examined during the inspection included followup on previously identified items, licensee event report followup, operational safety verification, plant tours, safety related system walkdown, monthly maintenance observations, monthly surveillance observations, security observations, radiological protection observations, and in-office review of periodic and special reports. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews.with personnel, and observations by the NRC inspectors. The inspection findings are documented in the enclosed inspection report. During this inspection, it was found that certain of your activities were in violation of NRC requirements. Consequent!), you are required to respond to these violations, in writing, in accordance with the provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Your response should be based on the specifies contained in the Notice of Violation enclosed with this letter. We have also examined actions you have taken with regard to previously identified inspection findings. The status of these items is identified in paragraph 2 of the enclosed report. The response directed by this letter and the accompanying Notice is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511. &% fn PE g DRS g $th 0:0hP 9[C:DRP/B RIV: RI SRI TFWesterman LJCallan TReis/nc PHHarrell dPMullikin RAcaldwe 3 p/88 3 /2.$/88 3 22./88 3 /rt/88 -{/p/88 $/p/88 / / ' 8803310092 880325 PDR ADOCK 05000285 O DCD . m

- _ _ _ _ _ _ _ _ _ _ _ .__ . _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ - _ - _ _ - _ . .- .. '. - , > Omaha Public Power District -2- Should you have any questions concerning this inspection, we will be pleased to discuss them with you. Sincerely, O@kl knad B):- A:B. BEACH L. J. Callan, Director Division of Reactor Projects Enclosures: 1. Appendix A - Notice of Violation 2. Appendix B - NRC Inspection Report 50-285/88-0/ ' cc w/ enclosures: W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 ! Fort Calhoun, Nebraska 68023 1 Harry H. Voigt, Esq. LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, DC 20036 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bec to DMB (IE01) , bcc distrib. by RIV: R. D. Martin, RA

  • MIS System
  • Section Chief (DRP/B)
  • DRP
  • RIV File
  • Project Engineer (DRP/8)
  • RSTS Operator
  • A. Bournia, NRR Project Manager
  • Lisa Shea, RM/ALF
  • RRI
  • DRS
  • TSS

' M. Emerson

  • w/766

1 I' l l

. - - . . - . . }}