Proposed Tech Specs,Revising Table 3.3-3,Item 8.f to Indicate Association W/Main Feedwater Pumps & to Revise Applicable Action StatementML20150B248 |
Person / Time |
---|
Site: |
Catawba |
---|
Issue date: |
03/11/1988 |
---|
From: |
DUKE POWER CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20150B247 |
List: |
---|
References |
---|
NUDOCS 8803160261 |
Download: ML20150B248 (6) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20212E7851999-09-16016 September 1999 Proposed Tech Specs Pages,Modifying Surveillance Requirements 3.8.4.8,3.8.4.9 & 3.8.4.8 Bases to Allow Testing of DC Channel Batteries with Units on Line ML20210N3151999-08-0404 August 1999 Proposed Tech Specs Changing TSs 3.3.2, ESFAS Instrumentation, 3.3.3, Post Accident Monitoring Instrumentation, 3.4.14, RCS Loops - Test & 5.3, Unit Staff Qualifications ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20205C6901999-03-25025 March 1999 Proposed TS Facilitating Treatment of RTS Instrumentation, ESFAS Instrumentation,Lop DG Start Instrumentation,Cp & Exhaust Isolation Instrumentation & LTOP PORV TS Trip Setpoints as Nominal Values ML20204E5281999-03-15015 March 1999 Proposed Tech Specs Deleting TS for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation & Adding Note to TS for Cravs Re Chlorine Protection Function ML20204F6931999-03-11011 March 1999 Proposed Tech Specs 3.3.7 & 3.3.8 Re CR Area Ventilation Sys & Auxiliary Bldg Filtered Ventilation,Exhaust Sys Actuation Instrumentation ML20203A3331999-01-28028 January 1999 Proposed Tech Specs Modifying Flowrate Specified for SR 3.7.13.4 from Value Representative of One Filter Unit/Fan to Value Representative of Entire Fhves Train ML20197G8991998-12-0707 December 1998 Proposed ITS 3.8.3,modifying Inventory Requirements for DG Lube Oil Sys ML20195D6481998-11-11011 November 1998 Proposed Tech Specs,Modifying Details of SRs 3.6.11.6 & 3.6.11.7 to Be Consistent with Design of Containment Pressure Control Sys at Plant ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20151Y1821998-09-15015 September 1998 Proposed Improved TSs Providing Changes Necessary to Resolve Items Identified by Util During Review ML20151T9491998-09-0808 September 1998 Proposed Tech Specs & Bases Re Relocation from Current TS & Scheduling of New More Restrictive Surveillance Requirements ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5751998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.2 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A6571998-08-0606 August 1998 TS Page 3/4 8-9 Re Notice of Enforcement Discretion Request from Enforcing TS Surveillance Requirement 4.8.1.1.2i.2 ML20237A9341998-08-0606 August 1998 Proposed Tech Specs,Deleting SR 4.8.1.1.2i.2 for Pressure Test of DG Fuel Oil Sys ML20237A0361998-08-0505 August 1998 Suppl 8 to Improved TS (Its),Combining Units ITS Pages to Facilitate Ease of Use & Significantly Reduce Vol of Paper That Must Be Processed & Controlled ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20249B3961998-06-15015 June 1998 Proposed Tech Specs Affecting Requirements for low-temp Overpressure Protection ML20248B5741998-05-22022 May 1998 Proposed Tech Specs Modifying SR 4.4.3.3 for Pressurizer Heaters to Be Consistent W/Plant Design & W/Ts Requirement as Delineated in Improved Tech Specs ML20217E9831998-04-20020 April 1998 Proposed Improved Tech Specs Sections 1.0,2.0,3.0 & 4.0 ML20217E9521998-04-20020 April 1998 Proposed Tech Specs Revising Requirements for Automatic Actuation Logic & Actuation Relays Associated W/Cravs Operation Function,Which Is Part of ESFAS ML20216B9721998-04-0808 April 1998 Proposed Tech Specs 3/4.6.5 Re Ice Condenser Reduction of Required Ice Weight ML20217C7121998-03-20020 March 1998 Proposed Improved TS Section 3.6 Re Containment Sys ML20216B7691998-03-0909 March 1998 Proposed Tech Specs Pages Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Also Included ML20217Q3741998-03-0303 March 1998 Proposed Tech Specs Re Catawba Safety Review Group ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20203H9241997-12-11011 December 1997 Proposed Tech Specs Re ESFAS Instrumentation ML20210U6401997-09-15015 September 1997 Proposed Tech Specs Revising Pressure/Temp Limits, Overpressure Protection & Reactor Vessel Matl ML20140A6201997-05-27027 May 1997 Proposed Tech Specs Deleting References to Steam Generator Tube Sleeving & Repair That Will Not Be Used for Westinghouse Model D5 Steam Generators in Use at Catawba Unit 2 ML20140A6681997-05-27027 May 1997 Proposed Tech Specs,Removing Surveillance Requirement 4.7.13.3a.2 Which Specifies 112,320 Gallon Min Volume of Borated Water Be Available to Supply Standby Makeup Pump ML20141C2281997-05-0808 May 1997 Proposed Tech Specs Allowing Natural Circulation Testing in Mode 3 Following Steam Generator Replacement for Catawba Unit 1 ML20136G2471997-03-0707 March 1997 Proposed Tech Specs Re SGTR Evaluation ML20133E6801997-01-0303 January 1997 Proposed Tech Specs to Eliminate SI Signal on Low Steam Line Pressure.Unnecessary SI Actuation Causes Unnecessary Challenges to Plant Safety Sys,Unnecessary Thermal Transient & Increases Actuation Cycles ML20132F0631996-12-12012 December 1996 Proposed Tech Specs,Section 3/4.3.3.1,for Units 1 & 2 Clarifying Info Re Operation of Radiation Monitors for Plant Operations ML20134H3281996-11-0404 November 1996 Proposed Tech Specs to Licenses NPF-35 & NPF-52,eliminating During Shutdown Restriction for 18 Month Standby Shutdown Sys DG Insp TS Surveillance 4.7.13.1.c ML20113G4431996-09-21021 September 1996 Proposed Tech Specs 8.3 Re Onsite Power Systems ML20117K1011996-08-29029 August 1996 Proposed Tech Specs,Replacing 960516 Response to Concerns Re Proposed Changes for Diesel Starting Air Sys Surveillance Testing ML20116K4601996-08-0808 August 1996 Proposed Tech Specs 6.9.1.9 Re Listings of Core Operating Limit Methodologies ML20113C7201996-06-21021 June 1996 Proposed Tech Specs 3.9.6,revising Term Lifting Loads to Lifting Force Used in Manipulator Crane TS 3.9.6b.2 & Redefining Auxiliary Hoist Min Capacities ML20112G9961996-06-0606 June 1996 Proposed Tech Specs,Reflecting Separate Volumes ML20112F6311996-06-0505 June 1996 Proposed Tech Specs 3/4.6 Re Containment Systems & 3/4.6.1 Re Primary Containment Integrity ML20112A7571996-05-16016 May 1996 Proposed Tech Specs 3/4.8 Re Surveillance Requirements ML20101M4741996-04-0303 April 1996 Proposed TS 3/4.6.4.3 & Bases Re Hydrogen Mitigation Sys ML20101H6101996-03-15015 March 1996 Proposed Tech Specs Re Replacement of SGs ML20100P0521996-03-0404 March 1996 Proposed Tech Specs Re Rev to 10CFR50,App J Which Provided for Reduced Test Frequency for Qualified Containment ML20096E8611996-01-19019 January 1996 Proposed Tech Specs,Providing Approved Revs to TS 6.9.1.9 to Incorporate Anticipated Revs to TRs DPC-NE-3000P-A & DPC-3002-A ML20096E5951996-01-12012 January 1996 Proposed Tech Specs Re Containment Leak Rate Testing Requirements of 10CFR50 App J,Option B 1999-09-16
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20212E7851999-09-16016 September 1999 Proposed Tech Specs Pages,Modifying Surveillance Requirements 3.8.4.8,3.8.4.9 & 3.8.4.8 Bases to Allow Testing of DC Channel Batteries with Units on Line ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20210N3151999-08-0404 August 1999 Proposed Tech Specs Changing TSs 3.3.2, ESFAS Instrumentation, 3.3.3, Post Accident Monitoring Instrumentation, 3.4.14, RCS Loops - Test & 5.3, Unit Staff Qualifications ML20210N9641999-07-26026 July 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20211C3731999-07-26026 July 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual & List of Effective Pages ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20210A5911999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20216D4061999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitment Manual, List of Effective Pages ML20211C3751999-05-19019 May 1999 5 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program. Page 1 of 15 in Section 4.1 of Incoming Submittal Not Included ML20195B4181999-05-18018 May 1999 Revised Pages to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206T0571999-05-0505 May 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual. with List of Effective Pages ML20206J4531999-04-22022 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206Q8741999-04-22022 April 1999 Revs to CNS Selected Licensee Commitments Manual,Including Page 5 of List of Effective Pages & Pages 1-11 to Chapter 16.9-13.With ML20206B1271999-04-15015 April 1999 CNS Selected Licensee Commitments Manual, List of Effective Pages ML20206C0391999-04-15015 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20205C6901999-03-25025 March 1999 Proposed TS Facilitating Treatment of RTS Instrumentation, ESFAS Instrumentation,Lop DG Start Instrumentation,Cp & Exhaust Isolation Instrumentation & LTOP PORV TS Trip Setpoints as Nominal Values ML20204G2541999-03-16016 March 1999 Revised Pages to Catawba Nuclear Station Licensee Commitments Manual ML20204E5281999-03-15015 March 1999 Proposed Tech Specs Deleting TS for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation & Adding Note to TS for Cravs Re Chlorine Protection Function ML20204F6931999-03-11011 March 1999 Proposed Tech Specs 3.3.7 & 3.3.8 Re CR Area Ventilation Sys & Auxiliary Bldg Filtered Ventilation,Exhaust Sys Actuation Instrumentation ML20205B1341999-03-11011 March 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20204E7271999-03-0808 March 1999 Chapter 16.5-2,page 1-3 to CNS Selected Licensee Commitments Manual. with List of Effective Pages ML20203A3331999-01-28028 January 1999 Proposed Tech Specs Modifying Flowrate Specified for SR 3.7.13.4 from Value Representative of One Filter Unit/Fan to Value Representative of Entire Fhves Train ML20199H4061999-01-16016 January 1999 Revised CNS Selected Licensee Commitments Manual ML20197G8991998-12-0707 December 1998 Proposed ITS 3.8.3,modifying Inventory Requirements for DG Lube Oil Sys ML20195D6481998-11-11011 November 1998 Proposed Tech Specs,Modifying Details of SRs 3.6.11.6 & 3.6.11.7 to Be Consistent with Design of Containment Pressure Control Sys at Plant ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Y1821998-09-15015 September 1998 Proposed Improved TSs Providing Changes Necessary to Resolve Items Identified by Util During Review ML20151T9491998-09-0808 September 1998 Proposed Tech Specs & Bases Re Relocation from Current TS & Scheduling of New More Restrictive Surveillance Requirements ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5751998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.2 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A6571998-08-0606 August 1998 TS Page 3/4 8-9 Re Notice of Enforcement Discretion Request from Enforcing TS Surveillance Requirement 4.8.1.1.2i.2 ML20237A9341998-08-0606 August 1998 Proposed Tech Specs,Deleting SR 4.8.1.1.2i.2 for Pressure Test of DG Fuel Oil Sys ML20237A0361998-08-0505 August 1998 Suppl 8 to Improved TS (Its),Combining Units ITS Pages to Facilitate Ease of Use & Significantly Reduce Vol of Paper That Must Be Processed & Controlled ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236P8671998-07-0606 July 1998 Updated Pages to Catawba Nuclear Station Selected License Commitments Manual ML20249B3961998-06-15015 June 1998 Proposed Tech Specs Affecting Requirements for low-temp Overpressure Protection ML20249B6221998-06-11011 June 1998 Revised Table of Contents for Chapter 16 of Selected License Commitments Manual ML20248B5741998-05-22022 May 1998 Proposed Tech Specs Modifying SR 4.4.3.3 for Pressurizer Heaters to Be Consistent W/Plant Design & W/Ts Requirement as Delineated in Improved Tech Specs ML20247Q9871998-05-11011 May 1998 Revised Chapter 16 to Selected License Commitment Manual ML20217E9521998-04-20020 April 1998 Proposed Tech Specs Revising Requirements for Automatic Actuation Logic & Actuation Relays Associated W/Cravs Operation Function,Which Is Part of ESFAS ML20217E9831998-04-20020 April 1998 Proposed Improved Tech Specs Sections 1.0,2.0,3.0 & 4.0 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20216B9721998-04-0808 April 1998 Proposed Tech Specs 3/4.6.5 Re Ice Condenser Reduction of Required Ice Weight ML20217C7121998-03-20020 March 1998 Proposed Improved TS Section 3.6 Re Containment Sys ML20216B7691998-03-0909 March 1998 Proposed Tech Specs Pages Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Also Included ML20217Q3741998-03-0303 March 1998 Proposed Tech Specs Re Catawba Safety Review Group ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR 1999-09-16
[Table view] |
Text
..
TABLE 3.3-3 (Continued) .
EliGINEERLD SAFEIY IEATURES ACTUAIlON SYSIEM INSTRUMENTAT10N N
> 'HINIMUM
. CilANNELS CllANNELS APPLICABLE 10TAL NO. MODES ACT10N c 10 TRIP OPERABLE Of CilANNELS 5 f0NCTIONAL UNIT d Auxiliary feedwater (Continued)
J 8.
e m c. Sim. Gen. Water Level-Low-Lcw e$ 1,2,3 19^
mo 1) Start Motor- 4/stm. gen. 2/stm. gen. 3/stm. gen.
Driven Pumps in each in any opera-ao ting stm. gen. operating x-stm. gen.
R o a) 88 2) Start Iurbine- 2/stm. gen. 3/stm. gen. 1, 2, 3 19*
Driven Pump 4/stm. gen.
T og$ in any two in each 8 oa- operating operating 5 stm. gen. sim. gen.
t
- d. Safety Injection- See item 1. above for all Safety injection initiating functions Start Motor-Driven Pumps and requirements.
- e. Loss-of-Of fsit'e Power-Start Motor-Driven Pumps and Turbine-Driven. dbus 1,2,3 IS*
6-3/ bus 2/ bus Pump either bus
- f. Irip of All Main feedwater Pumps,- z_-1//fpwp Z-grgrWe Start Motor- (npa) 2-1/etFicP 1, 2# % 28 2/i;umi; -1/i;u;;; ^1/i:u;;;
Driven Pumps e
~ - - - - - - - _ _ - _ _
TABLE 3.3-3 (Continued)
ACTION STATEMENTS (Continued)
ACTION 20 - With less than the Minimum Channels OPERABLE, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> determine by' observation of the associated permissive status
-light (s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.
ACTION 21 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STAN08Y within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUT 00WN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.
ACTION 22 - With the number of OPERABLE channels one less t..an the Total Number.of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STAN0BY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUT 00WN within the following .
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. .
ACTION 23 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare the associated valve inoperable and take the ACTION required by Specification 3.7.1.4.
ACTION 24 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or initiate and maintain operation of the Control Room Area Ventilation System with flow through the HEPA filters and activated carbon adsorbers. (
ACTION 25 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STAN0BY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
ACTION 26 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at : east HOT STANOBY vithin 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUT 00WN within the following 6 hon.
ACTION 27 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANOBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 provided the i l
other channel is OPERABLE.
l 1MEICT AC.T\od z.8 c> c eL ce. on me n e. 3/4 3- h I
r 3/4 3-26 Amendment No, d (Unit 1)
CATAWBA - UNITS 1 & 2 Amendment No. ';d (Unit 2) )
l
a INSERT FOR PAGE 3/4 3-26 ACTION 28 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may continue provided the inoperable channel is placed in the tripped condition within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
t 4
9 4
d 5
e
, - , . , , , . , , . _ , . . , _ _ . . . , , , y.. , ., ,__ _ , , , _ -.7_,,,__ _ . _ . _ _, , , ,r,_my_.yy,_,_%,__ , - , , , . ,
O ATTACIDiENT II DISCUSSION AND NO SIGNIFICANT IIAZARDS CONSIDERATION ANALYSIS
--.:w -,y.-, - -m ,
e DISCUSSION AND NO SIGNIFICANT HAZARDS CONSIDERATION ANALYSIS The attached change to Table 3.3-3, item 8.f - Trip of All Main Feedwater Pumps -
Start Motor-Driven Pumps, is intended as 1) clarification of the existing design
~
and operation of this ESF actuation, and 2) an addition of a new ACTION statement for the ESF instrumentation.
The clarification is needed to c1carly and correctly list the total number of channels, channels to trip, and minimum channels operable for the automatic start of the motor driven auxiliary feedwater pumps (MDCAP) on trip of all main feedwater pumps (MFWP). The current requirements listed in Table 3.3-3, item 8.f state that 1 channel / pump is the number of channels needed to trip as well as the minir.m number of channels re quired operable. The item also states that the total number of channels / pump is two (2). All three of these statements are unclear as to which pump (either MDCAP or MFWP) they are referring to.
The operation of the automatic start of the MDCAPs on the trip of all MFWPs is accomplished by two pressure sensors one on each of the two MFWPs. These sensors monitor the oil pressure of the MFWP and will trip upon sensing the oil pressure at 60 psig and decreasing. System operation is such that upon both sensors sensing the oil pressure at the low setpoint (60 psig and decreasing) both of the MDCAPs will automatically start.
The proposed change to the Technical Specification is based on the above description of the system operation and would change the requirements of the system to the following:
2 -1/MFWP This would be for all three (3) items (Total Number of Channels, Channels to Trip, and Minimum Channels Operable) and would mean that there exists 2 channels, one on each of the two MFWPs, and those two sensors are needed for the system to perform its function.
In conjunction with this clarification a change to the Action Statement for this Technical Specification la also proposed. Presently the Action Statement for item 8.f. of Table 3.3.3 is ACTION 25.
ACTION 25 states - with the number of OPERABLE channels one less than the Minimum Channels Operable requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
l The proposed new Action Statement would be ACTION 28 and would read as follows:
ACTION 28 - With the number of OPERABLE channels one less than the Total Nunber of Channels, STARTUP and/or POWER OPERATION may proceed provided the inoperable channel is placed in the tripped coedition within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
The functional capability of this system is maintained as required in the bases of Technical Specification (B 3/4 3.1) with one channel inoperable provided that the inoperable channel is placed in the trip condition. System operation logic with both channols operable requires that 2 out of the 2 operable channels (n out of n logic) sense a trip of the MFWPs prior to the automatic start of the MDCAPs.
The same level of conservatism in the system logic is maintained under the proposed Action Statement where it would be required that with one channel operable and the other channel inoperable but in the tripped condition that the
DISCUSSION AND NO SIGNIFICANT HAZARDS CONSIDERATION ANALYSIS (Continued) remaining operable channel (n out of n logic) sense a trip of a MFWP prior to the automatic start of the MDCAPs.. This change in the Action Statement has no impact on the accident analysis in the FSAR given the fact that the automatic start of MDCAPs on trip on all MFWPs was not taken credit for in *.he accident analysis.
These changes are intended to improve the Technical Specification by clarifying the system requirements and to allow continued startup and/or power operations while maintaining the functional capability of this system; no adverse safety concerns are involved.
10 CFR 50.92 (c) statec that "a proposed amendment... involves no significant hazards considerations, if operation of the facility in accordance with the proposed amendment would not:
(1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) Create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) Involve a significant reduction in a margin of safety.
The proposed changes do not involve a significant increase in the probability o consequences of a previously evaluated accident. The changes are provided for clarification as to which pumps are being addressed. The new ACTION statement is appropriate since it will allow continued operation yet maintain the level of safety by requiring the inoperable channel to be placed in the safe (tripped) position.
The proposed changes will not create the possibility of a new or different kind of accident from any accident previously evaluated. The proposed changes are intended as clarification to the existing requirements. The ACTION statement will not allow operation of the station in any unanalyzed condition.
The proposed changes do not involve a significant reduction in a raargin of safety. The ameadment will clarify the requirements as they pertain to the instrumentation associated with the MFWPs. The new ACTION statement will be adequate to ensure that the appropriate ESF actions will occur.
Based upon the above discussion, Duke Power: concludes that the proposed amendment !
does not involve any Significant Hazards Consideration.