| Site: | Monticello |
| Issue date: | 07/17/1997 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wadley M NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20149H920 | List: |
| References | |
| 50-263-97-08, 50-263-97-8, NUDOCS 9707250247 | |
| Download: ML20149H918 (3) | |
See also: IR 05000263/1997008
Text
{{#Wiki_filter:- e i- ' . ea sto [[ oqlg, UNITED STATES i 4 _ NUCLEAR REGULATORY COMMISSION g REGION til
% j 801 WARRENVILLE ROAD % 4 lisle, ILLINOls 60532-4351 %, . . . . /
' July 17, 1997 . Mr. M. Wadley, Vice President
Nuclear Generation Northem States' Power Company 414 Nicollet Mall Minneapolis, MN 55401 SUBJECT: MONTICELLO NRC INSPECTION REPORT NO. 50-263/97008(DRP) j AND NOTICE OF VIOLATION Dear Mr. Wadley: On July 7,1997, the NRC completed an inspection at your Monticello reactor facility. The enclosed report presents the results of that inspection. During the 6-week period covered by this inspection period, your staff's conduct of activities at.the Monticello facility was generally characterized by safety-conscious operations, sound engineering and maintenance practices, and careful radiological work controls. The torus draindown activities were conducted in a slow and controlled manner. Careful planning and execution of interior cleaning significantly reduced contamination and radiation exposure. However, several examples of a violation of NRC requirements were identified. Two examples involved individuals manipulating safety-tagged equipment. Although neither example resultad in personnel or equipment hazards, unauthorized manipulations of equipment is a concern. The other example involved eight cases where controlled drawings did not reflect current plant conditions.1hese cases indicate a weakness in engineering controls for maintaining accurate and complete drawings.
. This violation is cited in the enclosed Notice of Violation, and the circumstances
l surrounding the violation are described in detailin the enclosed report. Please note that ' you are required to respond to this letter and should folics. the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part, !- to determine whether further enforcement action is necessary to ensure compliance with regulatory requirements. . \\ 9707250247 970717 P t PDR ADOCK 05000263 / l ^
_. .. _ , . ..m - _ . _ _ . . _ _ . - . _ _ . . . _ _ _ _ _ . _ . . _ _ _ _ . _ . _ _ . _ _ _ . . _ . . . _ . _ - . , .. .' ! M. Wadley -2- 1 ! In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, , its enclosures, and your response will be placed in the NRC Public Document Room (PDR). 1 !;
j Sincerely, i j /s/Geoffrey E. Grant, Director
l Geoffrey E. Grant, Director l: Division of Reactor Projects f' Docket No. 50-263 ll License No. DPR 22 E;~' Enclosures: ! 1 ' Notice of Violation ! 2. Inspection Report No. 50-263/97008(DRP)
cc w/ encl: Plant Manager, Monticello '
John W. Ferman, Ph.D., .
[ Nuclear Engineer, MPCA State Liaison Officer, State ! j of Minnesota b Docket File w/ encl DRP w/enci
PUBLIC IE-01 w/ encl Rlli PRR w/enci l OC/LFDCB w/enci Project Manager, NRR w/enci
SRI Monticello, w/enct Prairie Island w/enci j A. B. Beach, w/enct Rlli Enf. Coordinator, w/ encl Deputy RA, w/enct CAA1 w/enci (E-mail) I TSS w/enct DRS (2) w/enci DOCDESK (E-mail)
i !. , 1 Docurr.ent: R:\\lnspr pt s\\ pow e rs\\m ont\\m on97008.d rp
, i- To receive a copy of this document, indicate in the box "C" = Copy without attach /enci ,! "E" = Copy with attach /enci "N" = No copy OFFICE Rlll 6 Rlli f Rill P- Rlli NAME Kunowski:dp ea JMcB Ga'rd r t f DATE 07//f/97 07/[59 7 3 07/1897 07[V9k [ OFHCIAL RECORD COPY . ' l - , . , , , - - , . - - y , ..n-- , ,, ~--. . . - .
i v . M. Wadley -2- , - in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosures, and your response will be placed in the NRC Public Docume'nt Room (PDR). 1 Sincerely,: ( yd N % , Geo froy E. Grant, Duector Divis on of Reactor Projects l Docket No. 50-263 License No. DPR-22 Enclosures 1. Notice of Violation 2. Inspection Report No. 50-263/97008(DRP) cc w/ encl: Plant Manager, Monticello John W. Ferman, Ph.D., Nuclear Engineer, MPCA State Liaison Officer, State , of Minnesota , , . . . . . . .- -- -. }}