,.o REACTOR COOLANT SYSTEM 3/4.4.3 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION coabinations 3.4.3.1 The following reactor coolant system leakage detection system shall be OPERABLE:
The drywell atmosphere particulate or gaseous radioactivity monitoring a.
- system,
+
b.
The drywell floor drain sump and equipment drain sump flow monitoring system, and The upper drywell air coolers condensate flow rate monitoring system, or the c.
drywell floor drain sump flow monitoring systen.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 3.
ACTION:
co.hinations With only two of the required leakage detection system.AOPERABLE, operation may continue for up to:
a.
30 days when the required gaseous and particulate radioactive monitoring system is inoperable provided grab samples of the drywell atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or b.
30 days when the drywell floor drain sump or equipment drain sump flow monitoring system is inoperable, or Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.4.3.1 The reactor coolant system leakage detection systems shall be demon-strated OPERABLE by:
a.
Drywell atmosphere particulate or gaseous monitoring systems-performance of a CHANNEL CHECX at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONAL TEST at least once per 31 days and a CHANNEL CALIBRATION at least once per 18 months.
b.
Drywell floor drain and equipment drain sump flow monitoring system-performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days and a CHANNEL CALIBRATION at least once per 18 months.
c.
Upper drywell air coolers condensate flow rate monitoring system-performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days and a CHANNEL CALIBRATION at least once per 18 months.
8802170386 880212 DR ADOCK 050 0
PERRY - UNIT 1 3/4 4-9
.