Partially Withheld Notice of Violation from Insp on 871023 (Ref 10CFR 73.21)
ML20149D655
Person / Time
Site: Oyster Creek
Issue date: 12/30/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20149D643 List:
References
50-219-87-37, EA-87-239, NUDOCS 8801130073
Download: ML20149D655 (2)


Text

i . . . . y 4 4 NOTICE OF VIOLATION GPU Nuclear Corporation Docket No. 50-219 Oyster Creek Nuclear Generating Station e o. OPR-16 During an NRC special inspection conducted on October 23, 1987, NRC inspectors reviewed the circumstances associated with a violation of NRC requirements identified by the licensee and reported to the NRC. The violation involved a degradation of a vital area barrier. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, (Enforcement Policy) (1987), the violation is set forth below:

License Condition 2.C(6) to Facility Operating License DPR-16 requires the licensee to implement fully and maintain all provisions of the NRC-approved physical security plan.

Ihl3 ** 9CWH CONT. lins WEGUAR05 gMD%)lios?.nn;3nggpggpygtgg blSli.usuRt,Il15 INffNT!0 Natty LEF T Bl ANg, INF09 ti; GRAPH CONT AINS SAFEGUARDS

(

tUS0k ,IT hl I NTI gg3 ttf THis PAaAggspy 00HAINS SMEGUARDS INf 0Rturwn AW M liOI FOR PUBUC DISCLOSURE,1185INifNil0NAlly LEFT Bl.ANK, THIS PARV,RAPH CONitfNS WFCUARDS INTORMAlmN UG .S Nui f 0R PupilC DISCtUSUM. It iS INTENil0N41(Y LEFT BLANK.

This is a Severity Level IV violation. (Supplement IV) 0FFICIAL RECORD COPY 1R SG OC 87 0004.0.0 h!h 0

Dock !50!!!19 DCD 12/30/87

- .. ~- . - - . - - - . . _- _. . .

4 .

Notice of Vi.lation 5 i Pursuant to the provisions of 10 CFR 2.201, GPU Nuclear Corporation is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 with a copy to the Regional Administrator, Region I, within 30 days of the date of the letter transmitting this Notice. This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason (s) for the violation if admitted, (2) the correc-tive steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken. Consideration may be given to extending the response time for good cause shown. ,

FOR THE NUCLEAR REGULATORY COMMISSION Or:3 ad s'ydd By:  ;

Thcmas T. Martin Thomas T. Martin, Director l

Division of Radiation Safety and Safeguards t

Dated at King of Prussia, Pennsylvania this 30th day of December 1987 ,