Letter Sequence Other |
|---|
|
|
MONTHYEARB11633, Forwards Summaries of Projects Evaluated for Public Safety Impacts & Proprietary Millstone Nuclear Power Station Unit 1 Integrated Safety Assessment Program Public Safety Impact Model. Proprietary Rept Withheld (Ref 10CFR2.790)1985-08-0707 August 1985 Forwards Summaries of Projects Evaluated for Public Safety Impacts & Proprietary Millstone Nuclear Power Station Unit 1 Integrated Safety Assessment Program Public Safety Impact Model. Proprietary Rept Withheld (Ref 10CFR2.790) Project stage: Other ML20238E1081987-12-23023 December 1987 Proposed Tech Specs Adding Personnel Door to Spent Fuel Pool Area of Auxiliary Bldg Project stage: Other B12719, Application for Amend to License DPR-65,revising Tech Specs to Include Installation of Personnel Door in Spent Fuel Pool Area of Auxiliary Bldg.Fee Paid1987-12-23023 December 1987 Application for Amend to License DPR-65,revising Tech Specs to Include Installation of Personnel Door in Spent Fuel Pool Area of Auxiliary Bldg.Fee Paid Project stage: Request B12723, Application for Amend to License DPR-65,eliminating Tech Spec Requirements for Control Bldg Chlorine Detectors Based on Elimination of Onsite Chlorine Bulk Storage & Verification of Low Chlorine Rail Frequency.Fee Paid1988-02-0303 February 1988 Application for Amend to License DPR-65,eliminating Tech Spec Requirements for Control Bldg Chlorine Detectors Based on Elimination of Onsite Chlorine Bulk Storage & Verification of Low Chlorine Rail Frequency.Fee Paid Project stage: Request ML20149L2941988-02-16016 February 1988 Safety Evaluation Supporting Amend 14 to License NPF-49 Project stage: Approval ML20149L2831988-02-16016 February 1988 Amend 14 to License NPF-49,deleting Chlorine Detection Sys from Tech Spec 3/4.3.2 Project stage: Other ML20149D4591988-02-28028 February 1988 Proposed Tech Specs Re Removal of Control Room Chlorine Detectors Project stage: Other B12832, Provides Addl Info Re 871223 Proposed Rev to Tech Specs. Proposed Change Adds Personnel Door to East End of Spent Fuel Pool & Table 3.9-1, Access Doors to Spent Fuel Pool Area1988-02-29029 February 1988 Provides Addl Info Re 871223 Proposed Rev to Tech Specs. Proposed Change Adds Personnel Door to East End of Spent Fuel Pool & Table 3.9-1, Access Doors to Spent Fuel Pool Area Project stage: Request ML20150F6731988-03-28028 March 1988 Safety Evaluation Supporting Amend 127 to License DPR-65 Project stage: Approval ML20150F6671988-03-28028 March 1988 Amend 127 to License DPR-65,revising Tech Specs to Delete Chlorine Detection Sys from Tech Spec 3/4.3.3.6 & Table 3.9-1 to Reflect Installation of New Access Door to Spent Fuel Pool Area Project stage: Other 1988-02-28
[Table View] |
Text
h j;
" ~
l
=
.o
.i
' Ye it Docket No.-50-336 E121.0 l
t i
s, 5
H
-t t
a Removal of Control Room Chlorine Detectors I
?
5 I
a k
b 1
t i
i i
e i
i i
i i
i I
l 8802090507 080203
}
PDR ADOCK 05000336 l
l P
ppg February 1988 t
4 I
t
"This Page Lef t Blank Intentionally" Millstone - Unit 2 3/4 3-42
,. g-g a
.g INSTRUMENTATION
' 3/4.3.3.6 Fire Detection Instrumentation OPERABILITY - of the fire detection instrumentation _ ensures that adequate warning capability is available for the prompt detection of fires. This capability is required,in order to detect and locate fires in their-early stages. Prompt.
detection of fires will reduce the potential for damage to safety related equipment and is an. Integral element. In the 'overall facility fire l protection program.
In the event that a portion of the fire detection instrumentation is inoperable, the establishment of frequent fire patrols in the affected areas is required to-i provide detection capability until the inoperable' instrumentation _is restored to OPERABILITY.
3/4.3.3.7 Accident Monitoring Instrumentation The _ OPERABILITY of the accident monitoring instrumentation ensures that sufficient information is available on selected plant parameters to monitor and' assess these variables during and following an accident.
This capability is consistent with the recommendations of NUREG-0578, "TM1-2 Lessons Learned Task Force Status Report and Short-Term Recommendations".
E i
Millstone - Unit 2 B3/4 3-4 e
i
.