Letter Sequence Other |
|---|
|
|
MONTHYEARB11633, Forwards Summaries of Projects Evaluated for Public Safety Impacts & Proprietary Millstone Nuclear Power Station Unit 1 Integrated Safety Assessment Program Public Safety Impact Model. Proprietary Rept Withheld (Ref 10CFR2.790)1985-08-0707 August 1985 Forwards Summaries of Projects Evaluated for Public Safety Impacts & Proprietary Millstone Nuclear Power Station Unit 1 Integrated Safety Assessment Program Public Safety Impact Model. Proprietary Rept Withheld (Ref 10CFR2.790) Project stage: Other ML20238E1081987-12-23023 December 1987 Proposed Tech Specs Adding Personnel Door to Spent Fuel Pool Area of Auxiliary Bldg Project stage: Other B12719, Application for Amend to License DPR-65,revising Tech Specs to Include Installation of Personnel Door in Spent Fuel Pool Area of Auxiliary Bldg.Fee Paid1987-12-23023 December 1987 Application for Amend to License DPR-65,revising Tech Specs to Include Installation of Personnel Door in Spent Fuel Pool Area of Auxiliary Bldg.Fee Paid Project stage: Request B12723, Application for Amend to License DPR-65,eliminating Tech Spec Requirements for Control Bldg Chlorine Detectors Based on Elimination of Onsite Chlorine Bulk Storage & Verification of Low Chlorine Rail Frequency.Fee Paid1988-02-0303 February 1988 Application for Amend to License DPR-65,eliminating Tech Spec Requirements for Control Bldg Chlorine Detectors Based on Elimination of Onsite Chlorine Bulk Storage & Verification of Low Chlorine Rail Frequency.Fee Paid Project stage: Request ML20149L2941988-02-16016 February 1988 Safety Evaluation Supporting Amend 14 to License NPF-49 Project stage: Approval ML20149L2831988-02-16016 February 1988 Amend 14 to License NPF-49,deleting Chlorine Detection Sys from Tech Spec 3/4.3.2 Project stage: Other ML20149D4591988-02-28028 February 1988 Proposed Tech Specs Re Removal of Control Room Chlorine Detectors Project stage: Other B12832, Provides Addl Info Re 871223 Proposed Rev to Tech Specs. Proposed Change Adds Personnel Door to East End of Spent Fuel Pool & Table 3.9-1, Access Doors to Spent Fuel Pool Area1988-02-29029 February 1988 Provides Addl Info Re 871223 Proposed Rev to Tech Specs. Proposed Change Adds Personnel Door to East End of Spent Fuel Pool & Table 3.9-1, Access Doors to Spent Fuel Pool Area Project stage: Request ML20150F6731988-03-28028 March 1988 Safety Evaluation Supporting Amend 127 to License DPR-65 Project stage: Approval ML20150F6671988-03-28028 March 1988 Amend 127 to License DPR-65,revising Tech Specs to Delete Chlorine Detection Sys from Tech Spec 3/4.3.3.6 & Table 3.9-1 to Reflect Installation of New Access Door to Spent Fuel Pool Area Project stage: Other 1988-02-28
[Table View] |
Text
_ _ _ _ _ _ _ _ _ _
Docket No. 50-336 B12719 j
l l
\\
l ATTACHMENT Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specification New Personnel Door in Auxiliary Building December 1987 8801050004 071223 PDR ADOCK 05000336 P
PDR
v.
- e TABLE 3.9-1 ACCESS DOORS TO SPENT FUEL POOL AREA m.
Door No.
Elevation Location Type Area Serviced 291 14'6" M.7-18.5 Double Door SFP Skimmer System -
~
292 or 14'6" R/S-18.9 Double Door - Solidification System 207 or 8' Rollup Door 293 14'6" Q/R-18.0 Double Door Maintenance Shop 208 14'6" '
S-18.9 16' Rollup -
Railway Access Door -
294 14'6" Q-20.7 Single Door D/G Room 295 38'6" F.8-18 8' Rollup Aux, & R. W. HVAC Door 296 38'6" F.8-18.5 Single Door Aux. & R. W. HVAC 297 38'6" F.8-18.5 Single Door North Stairwell 38'6" H.4-18.9 Double Sliding Elevator.
Door 298-38'6" M.4-18.9 Single Door Penetration Room 299 38'6" M.7-18.9 Double Door Main Exh. Fan Room 247 38'6" M.7-17.2
. Single Door South Stairwell 254 55'6" S-17.2 Single Door Roof Above Storage Floor 253 55'6" S-18.9 Single Door Roof Above F. O. Tanks 274 38'6" R-17.2 Single Door Area below Mezzanine 1
MILLSTONE - UNIT 2 i
3/49-15 j
_ _ ____ _ _ _