ML20149D281

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/87-30 on 871207-10 & 20-23 & Notice of Violation
ML20149D281
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/04/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20149D284 List:
References
NUDOCS 8802090442
Download: ML20149D281 (2)


See also: IR 05000458/1987030

Text

. - - -

'

"

FEB

A 1988

In Reply Refer To:

Docket:

50-458/87-30

Gulf States Utilities

ATTN:

Mr. James C.~.Deddens

Senior.Vice President, (RBNG)

Nuclear Licensing

P.O.' Box 220

St. Francisville, Louisiana 70775

Gentlemen:

This refers to the inspection conducted by Mr. Nemen M. Terc of .this office

during the periods December.7-10 and 2.0-23, 1987, of activities authorized by

NRC Operating License NPF-47 for the River Bend Station and to the discussion of

our findings with you and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included the evaluation of notifications

and communications and your emergency preparedness training program. Within

these areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspector.

The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

We have also examined actions you have taken with regard '

+eviously

identified inspection findir,gs.

Tne status of these item.

identified in

paragraph 2 of the enclosed report (Appendix B).

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office _of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RIV:NMEPBI

C:NMEP

C:0RP/C

D:DRP

NMTerc;df I

WJ.Fh,her

EHoller

LJCallan

l /A7/88

1/&u88

) /3 /88

t /^7/88

8802090442 800204

f

PDR

ADOCK 05000458

l

G

PDR

-

_

...

. .

-

-

.

'

,

,

.

.-

Gulf-States Utilities

-2-

,

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

OrfrM Sirmd By

. L J. CALLAN

L.-J. Callan, Director.

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix 8 - NRC Inspection Report

50-458/87-30

cc w/ enclosures:

Gulf States Utilities

ATTN:

J. E. Booker, Manager-

'

River Bend Oversight

P.O. Box 2951

Beaumont, Texas

77704

~

Chief, Radiological Preparedness Team

'

FEMA Region 6

Federal Center

800 North Loop 288

Denton,_ Texas 76201-3698

Louisiana State University,

-

Government Documents Department

'

Louisiana Radiation Control Program Director

bec to DMB (IE35)

bcc distrib. by RIV:

<

  • DRP/C

DRP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (DRP/C)
  • L.

Shea, RM/ALF

  • MIS System

DRS

  • RSTS Operator
  • Project Eng, DRP/C
  • RIV File
  • W. Paulson, NRR Project Manager

NMEPB

  • R. Hall
  • RIV File
  • W. Paulson, NRR Project Manager
  • Inspector (s)

D. B. Matthews, NRR

  • W. L. Fisher

R. L. Bangart

J

TSS

  • w/766

'

1

lj